March 2, 2005
SUBJECT:
ANNUAL ASSESSMENT LETTER - WATERFORD 3 STEAM ELECTRIC STATION (NRC REPORT 05000382/2005001)
Dear Mr. Venable:
On February 1, 2004, the NRC staff completed its end-of-cycle plant performance assessment of Waterford 3 Steam Electric Station. The end-of-cycle review for Waterford 3 involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate end-of-cycle performance review letter designated and marked as
"Exempt from Public Disclosure in Accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Overall, Waterford 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on an inspection finding being classified as having low to moderate safety significance (White). This finding, which affected the mitigating systems cornerstone, involved the failure to establish appropriate instructions and accomplish those instructions for installation of a fuel line for the Train A emergency diesel generator in May 2003. This ultimately rendered the Train A emergency diesel generator inoperable. The corrective actions in response to this finding were completed in the third quarter of the assessment period. The NRC staff performed a supplemental inspection and verified the adequacy of these corrective actions. As a result, this White finding was closed on December 31, 2004.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2006. In addition to conducting reactor oversight process baseline inspections at your facility through September 30, 2006, we also plan to conduct Temporary Instruction 2515/160, Pressurizer Penetration and Steam Space Piping
Entergy Operations, Inc.
-2-Connections in U.S. Pressurized Water Reactors, and Inspection Procedure 71004, Power Uprate, which will evaluate changes made to the plant to support the proposed power uprate.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs documents systems (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact William B. Jones at 817/860-8147 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur T. Howell III, Director Division of Reactor Projects Docket: 50-382 License: NPF-38 Enclosure:
Waterford 3 Steam Electric Station Inspection/Activity Plan cc w/enclosure:
Federal Emergency Management Agency ATTN: Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, TX 76201-3698 Col. Michael L. Brown, Deputy Director Louisiana Office of Homeland Security and Emergency Preparedness 7667 Independence Blvd.
Baton Rouge, LA 70806 Mr. Albert D. Laque, Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Sheriff Greg Champagne St. Charles Parish P.O. Box 426 Hahnville, LA 70057 Rep. Gary L. Smith, Jr.
State of Louisiana, District 56 P.O. Box 189 Norco, LA 70079 Senator Joel T. Chaisson, II State of Louisiana, District 19
Entergy Operations, Inc.
-3-P.O. Box 1255 Destrehan, LA 70047 Tab Troxler, Director Dept. of Emergency Preparedness St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Clayton "Snookie" Faucheux Councilman-at-Large, Div. B St. Charles Parish 140 North Oak Court P.O. Box 1342 Luling, LA 70070 Desmond J. Hilaire Councilman, District 1 St. Charles Parish P.O. Box 111 Hahnville, LA 70057 Brian A. Fabre Councilman, District 2 St. Charles Parish 322 Beaupre Drive Luling, LA 70070 G. Ram Ramchandron Councilman, District 3 St. Charles Parish 237 Ormond Village Drive Destrehan, LA 70047 Derryl Walls Councilman, District 4 St. Charles Parish P.O. Box 516 Boutte, LA 70039 April Black Councilwoman, District 5 St. Charles Parish 14 Bridle Path Lane St. Rose, LA 70087 Richard Dickie Duhe Councilman, District 6 St. Charles Parish 401 Oak Street Norco, LA 70079 Barry Minnich Councilman, District 7 St. Charles Parish 337 Wanda Street Luling, LA 70070 Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
Entergy Operations, Inc.
-4-17265 River Road Killona, LA 70066-0751 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Nickie Monica, President St. John the Baptist Parish 1801 West Airline Highway LaPlace, LA 70068 Paul Oncale Public Safety Director St. John the Baptist Parish 1801 W. Airline Highway LaPlace, LA 70068 Sheriff Wayne Jones St. John the Baptist Parish 1801 W. Airline Highway LaPlace, LA 70068 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Entergy Operations, Inc.
-5-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (RVA)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
RidsNrrDipmlipb V. Dricks, PAO (VLD)
W. Maier, RSLO (WAM)
C. Gordon (CJG)
DRS Branch Chiefs (LJS, MPS1, ATG, JAC)
S. Richards, Chief, NRR/DIPM/IIPB (SAR)
M. Case, Deputy Dir. for Inspection and Programs (MJC)
B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
B. Wetzel, ActingChief, ROPMS, OEDO (BAW)
H. Berkow, Director, LPD4, NRR/DLPM (HNB)
A. Howe, Chief, PDIV-1, NRR/DLPM (AGH1)
N. Kalyanam, NRR Project Manager (NXK)
SISP Review Completed: _ATH__
ADAMS: / Yes G No Initials: _ATH__
/ Publicly Available G Non-Publicly Available G Sensitive
/ Non-Sensitive S:DRP\\DRPDIR\\EOC 04\\Assessment Letters\\DC.wpd RIV:DRP/E D:DRS D:DRP WBJones;mjs DDChamberlain ATHowell III
/RA/
/RA/
/RA/
2/23/05 2/23/05 3/2/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Waterford Inspection / Activity Plan 03/04/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2005 08:38:00 Report 22
RP TEAM
- RP TEAM INSPECTION Baseline Inspections 02/28/2005 03/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103
Baseline Inspections 02/28/2005 03/04/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201
Baseline Inspections 02/28/2005 03/04/2005 Radioactive Material Processing and Transportation IP 7112202
Baseline Inspections 02/28/2005 03/04/2005 Radiological Environmental Monitoring Program IP 7112203
1 IP 71004
- POWER UPRATE INSP Other Routine 04/07/2005 05/31/2005 Power Uprate IP 71004
1 TI 160
- TI 160 PZR PENE & SSTM SPACE PIPING CONN Safety Issues 04/07/2005 05/31/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 ACRSA
- ACCESS CONTROL TO RAD SIGNIFICANT AREAS Baseline Inspections 04/18/2005 04/22/2005 Access Control to Radiologically Significant Areas IP 7112101
1 EB08P
- ISI - REQUIRES VOLUMETRIC TI 150/152 Baseline Inspections 04/25/2005 04/29/2005 Inservice Inspection Activities - PWR IP 7111108P
Baseline Inspections 05/02/2005 05/06/2005 Inservice Inspection Activities - PWR IP 7111108P
1 ALARA2
- ALARA PLANNING AND CONTROLS Baseline Inspections 04/25/2005 04/29/2005 ALARA Planning and Controls IP 7112102
3 OB-RQ
- REQUAL INSPECTION Baseline Inspections 08/15/2005 08/19/2005 Licensed Operator Requalification Program IP 7111111B
1 ALARA3
- ALARA PLANNING AND CONTROLS Baseline Inspections 09/26/2005 09/30/2005 ALARA Planning and Controls IP 7112102
1 PEB-12B
- MAINTENANCE RULE BIENNIAL Baseline Inspections 10/03/2005 10/07/2005 Maintenance Effectiveness IP 7111112B
4 OB-EP EX
- EMERG PREPAREDNESS EXERCISE Baseline Inspections 12/05/2005 12/09/2005 Exercise Evaluation IP 7111401
Baseline Inspections 12/05/2005 12/09/2005 Emergency Action Level and Emergency Plan Changes IP 7111404
Baseline Inspections 12/05/2005 12/09/2005 Performance Indicator Verification IP 71151
3 PEB
- W3 PIR INSPECTION Baseline Inspections 03/06/2006 03/10/2006 Identification and Resolution of Problems IP 71152B
Baseline Inspections 03/20/2006 03/24/2006 Identification and Resolution of Problems IP 71152B
3 EB
- PERMANENT PLANT MODS Baseline Inspections 06/19/2006 06/23/2006 Evaluation of Changes, Tests, or Experiments IP 7111102
Baseline Inspections 06/19/2006 06/23/2006 Permanent Plant Modifications IP 7111117B
1 ALARA1
- ALARA PLANNING AND CONTROLS Baseline Inspections 06/26/2006 06/30/2006 ALARA Planning and Controls IP 7112102
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Waterford Inspection / Activity Plan 03/04/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2005 08:38:00 Report 22
OB-INIT
- WAT INITIAL EXAM Not Applicable 07/24/2006 07/28/2006 WAT INITIAL EXAM (08/06)
X02295
Not Applicable 08/14/2006 08/18/2006 WAT INITIAL EXAM (08/06)
X02295
4 PEB-05T
- TRIENNIAL FIRE PROTECTION Baseline Inspections 08/07/2006 08/11/2006 Fire Protection IP 7111105T
Baseline Inspections 08/21/2006 08/25/2006 Fire Protection IP 7111105T
1 PEB
- HX PERFORMANCE Baseline Inspections 08/14/2006 08/21/2006 Heat Sink Performance IP 7111107B
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.