ML20206S441
| ML20206S441 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/10/1999 |
| From: | Brockman K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20206S446 | List: |
| References | |
| 50-382-99-05, 50-382-99-5, NUDOCS 9905210137 | |
| Download: ML20206S441 (5) | |
See also: IR 05000382/1999005
Text
.
- "%,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
.
.
a
S
e
REGloN IV
e
611 RYAN PLAZA oRIVE, sulTE 400
+
ARLINGTON, TEXAS 760118064
,,,g
MAY l 01999
Charles M. Dugger, Vice President
Operations - Waterford 3
Entergy Operations, Inc.
P.O. Box B
Kiliona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-05
Dear Mr. Dugger:
This refers to the inspection conducted on February 28 through April 10,1999, at the Waterford
Steam Electric Station, Unit 3, facility. The enclosed report presents the results of this
inspection.
During the 6-week period covered by this inspection, your conduct of activities at Waterford 3
was generally characterized by safety-conscious operations, sound engineering and
maintenance practices, and careful radiological controls. However, the number of personnel
errors, identified during Refueling Outage 9 demonstrated a lack of attention to detail by plant
personnel. The errors discussed in Sections O4.1, M4.1, and S1.1 of the enclosed report
involve a number of different onsite organizations. These findings indicate that further
management attention may be warranted to improve human performance and reduce the
number of personnel errors.
Based on the results of this inspection, the NRC has determined that three violations of NRC
requirements occurred. These violations are being treated as noncited violations (NCV),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs, you
ishould provide a response within 30 days of the date of this inspection report, with the basis for
.your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
IE[. Efrmi
irector
.-
ivision of Re
or Projects
9905210137 990510
e
ADOCK 05000382
G
a
.
,
Entergy Operations, Inc.
-2-
Docket No.:
50-382
License No.: NPF-38
Enclosure:
NRC inspection Report No.
50-382/99-05
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
.
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
- Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
i
Killona, Louisiana 70066
'
.
.
Entergy Operati ns,
c.
-3-
I
Ronald L. Wascom, Administrator
Louisiana Radiation Protection Division
l
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles' Parish
P.O. Box 302
Hahnville, Louisiana 70057'
Winston & Strawn
1400 L Street, N.W.
j
Washington, D.C. 20005-3502
'
l
.
.
MAY l 01999
Entergy Operations, Inc.
-4-
i
E Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
l
E-Mail report to Richard Correia (RPC)
l
E Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
i
bec distrib. by RIV:
Regional Administrator
Resident Inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/D)
RIV File
Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
i
l
DOCUMENT NAME: R:\\_WAEWT905RP.TRF
j
To receive copy of document, indicate in box: 'C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy
RIV:RI
, ,f
RIV: SRI
C:DRP/D
._
JMKeeton DM TRFarnholtzMf6 PHHarrell(PW
04/20/99 VL 054/99
0540/99
F
' '
OFFICIAL RECORD COPY
.
'
MAY l O Eli
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib, by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/D)
RIV File
Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
\\
\\
DOCUMENT NAME: R:\\_ WAEWT905RP.TRF
j
To receive copy of document, Indicate in box: 'C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
I
RIV:RI
,_a
RIV: SRI
_
C:DRP/D
.,
l
JMKeeton @M TRFarnholtzMLL PHHarrell(PW
04/20/99 VL
054a/99
05b/99
F
)
'~
OFFICIAL RECORD COPY
M0029