Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations
ML20211Q442
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/09/1999
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20211Q447 List:
References
50-382-99-07, EA-99-202, NUDOCS 9909150069
Download: ML20211Q442 (5)


See also: IR 05000382/1999007

Text

I

e

/d # "Go UNITED STATES

, y *; NUCLEAR REGULATORY COMMISSION

$ ,E REGION IV

  1. k 611 RYAN PLAZA drive, sulTE 400 j

+ ARUNGTON, TEXAS 760118064

,, g

September 9,1999

EA 99-202

Charles M. Dugger, Vice President

Operations - Waterford 3 j

'

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

4

SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-07

Dear Mr. Dugger:

This refers to the inspection conducted on June 1 to 11,1999, at the Waterford Steam Electric

Station, Unit 3, facility. The purpose of the inspection was to review your facility's corrective

action program, using the guidance provided in NRC Inspection Procedure 40500. An exit

meeting with your staff was held on June 11,1999. Inoffice inspection of supplemental

information was performed through July 29,1999. Following the inoffice inspection, an exit was

conducted telephonically on September 9,1999, with your staff. The enclosed report presents

the results of this inspection.

On the basis of the sample reviewed, your corrective action program was generally

implemented with an appropriate threshold for identifying, classifying, and prioritizing adverse

conditions. However, the violations identified in this report relate to timeliness or effectiveness

of your corrective action x agram. Further, your self assessments did not identify the types of

.

issues raised during our e spection. While we found your program adequate overall, your

consideration of the findings of this inspection would enhance your program.

l Based on the results of this inspectinn, the NRC has determined that three Severity Level IV

l violations of NRC requirements occurred. These violations are being treated as noncited

violations, consistent with Appendix C of the Enforcement Policy. These noncited violations are

described in the subject inspection report if you contest the violation or severity level of these

noncited violations, you should provide a response within 30 days of the date of this inspection

report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document

Control Desk, Washington DC 20555-0001, with ropies to the Regional Administrator, U.S.

Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas

76011, the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC Resident inspector at the Waterford Steam Electric

Station, Unit 3, facility,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response, if requested, will be placed in the NRC Public Document

Room (PDR).

9909150069 990909

PDR ADOCK 05000302

G PDR

(

L  ;

. l

  1. l

-

Entergy Operations, Inc. -2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

John L. Pellet, Chief

Operations Branch

Division of Reactor Safety

Docket No.: 50-382

License No.: NPF 38 .

1

Enclosures:

NRC inspection Report No.

50-382/99-07 .

cc w/ enclosures:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

i

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B i

Killona, Louisiana 70066

1

1

-

p : .:

u.

!

s-

l Entergy Operations, Inc. -3-

!

'

Chairman -

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director, Nuclear Safety & '

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Ronald Wascom, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

Parish President

St. Charles Parish

P.O. Box 302

Hahnville, Louisiana 70057

Winston & Strawn  ;

1400 L Street, N.W.

Washington, D.C. 20005-3502

,

l

i

i

i

i

P

l:o

(O.

,

.

! . Entergy Operations, Inc. -4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

RIV File

DRS Director

RITS Coordinator

Branch Chief (DRP/D)

.

'

Project Engineer (DRP/D)

OE: EA FILES (0-14E1)

Sanborn: EA Files

I

l

\

l

\

  • ~ -e}

_.s

l

\

\

,

DOCUMENT NAME: R:\_wat\wt907rp.pcg i

To receive copy of document, indicate in box: "c" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

SRE:OB SRE:OB (1, RI:PBD C:OB C:PBD EO C:OB

PCGage/imb* GWJohnsM JMKeeton* JLPellet* PHHarrell* GSanborn* JLPellet

08/11/99 08/09/99 08/10/99 08/11/99 00/11/sif 08/12/99 09/7/99

  • previously concurred OFFICIAL RECORD COPY

'

4,s'f'

_

.-

.

Entergy Operations, Inc. -4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bcc to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

RIV File

DRS Director

RITS Coordinator

Branch Chief (DRP/D)

Project Engineer (DRP/D)

OE: EA FILES (0-14E1)

Sanborn: EA Files

l

DOCUMENT NAME: R:\ wat\wt907tp.pcg

To receive copy of document, Indicate in box: 'C' = Copy without enclosures *E' = Copy with enclosures 'N' = No copy

SRE:OB SRE:OB 91, Rl:PBD C:OB C:PBD EO C:OB

PCGage/Imb* GWJohnsM '

JMKeeton* JLPellet* PHHarrell* GSanborn* JLPellet

08/11/99 08/09/99 08/10/99 08/11/99 00/11,W 08/12/99 0$/7/99 l l

  • previously concurred OFFICIAL RECORD COPY j

\ C'

/ ft,

,c

,

S  ;

1

l

j