e November 1, 1990
Decket No. 50-382-Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B K111ona, Louisiana 70066
Dear Mr. Barkhurst:
SUBJECT:
UNIMPLEMENTED GENERIC SAFETY ISSUES AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 On April 25, 1990, the staff issued Generic Letter 90 04 which requested infor-mation concerning the implementation status.of certain generic safety issues (GSIs) at your facility. Based on the Waterford 3 response to this Generic
' Letter, dated June-26, 1990; our own records, and' discussions with your staff, we have updated-our database on GSIJimplementation status. The results of.this-effort were' presented to the Connission at a meeting on October 25,1990.
')
The enclosure-to this letter sunmarizes the staff's understanding of the i
current status'of those GSIs which remain unimplemented at Waterford 3.
s We appreciete the assistance you-provided in responding.to Generic Letter 190 04 and we encourage your timely completion'of those GSIs listed ~1n the -
- enclosure.
Please contact me if you have any questions or comments about the enclosed
'information.
o Sincerely, ORIGINAL SIGNED BY:
l David Wigginton, Senior Project Manager Project Directorate IV.1' Division of Reactor. Projects
- III, IV, V and Special Projects Office of-Nuclear Reactor Regulation-1' g
b
Enclosure:
.As" stated-y, l
cc w/ enclosure:
1 See next page n.
' DISTRIBUTION
.. )9C-
,55Hireme#
T. Quay M. Virgilio MS13E4) 4R.'Scho11 MS13E4 P
NRC;PDR' L'.. Berry _
E. Jordan MNBB 3701 D~.. Miller MS14H20~.
Local.PDR-D.'Wigginton ACRS (10) MS P-315 PD4 1 Reading:
PD4 1 Plant File OGC MS15B18
/.......:...../g,d....:..............::..............::.............
- PD4-1 D L OFC.
- PD4-1/LA
- PD4 NAMEl :LBerry
- DWi nton:1h :TQuay DATE tlh/8 090-
- 10 70 90
-:n/I/90 i
/ /
-OFFICIAL RECORD COPY Document Name: GENERIC SAFETY ISSUE WATERFORD 9011080001 901101 PDR ADOCK 05000382 PDC Y
P
~. _
gh Rio j'
Qc?[.
o,j.
UNITED STATES
];
g NUCLEAR REGULATORY COMMISSION 3
- j WASHINGTON, D. C 20S$5 J
i.
ft
/
November 1, 1990 y.
Docket No.' 50-382 Mr. Ross P.. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B.
Killona,-Louisiana -70066 l
Dear Mr. Barkhurst:
SUBJECT:
UNIMPLEMENTED GEN RIC SAFETY ISSUES AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 On April 25,=1990, the staff issued Generic Letter 90-04'which requested infor-mation concerning the implementation status of certain-generic safety issues (GSIs) at your facility. Based-on the Waterford 3 response to.this Generic.
Letter, dated June 26, 1990, our own records, and. discussions with your-staff,
.we have updated our-database on GSI implementation status. The results of this effort were presented to the Commission at a meeting-on October.25, 1990.
The enclosure to this letter summarizes the~ staff's understanding of the current status of.those GSIs which remair unimplemented at Waterford 3.
We appreciate the assistance.you provided in responding. to Generic Letter 90-04 and we encourage;your timely completion of those GSIs listed in the enclosure.
Please; contact me if you have any questions or comments about the enclosed information.-
~
l t
.i Sincerely, l
David Wig i ton, Senior Project' Manager Project Directorate IV-l' Division of Reactor Projects - III,.
IV, Y and Special Projects.
Office of Nuclear Reactor Regulation
Enclosure:
LAs: stated cc w/ enclosure:
See.next page-
__.,_.._-_-_,m
+,.,
u
?-
j t Mr. Ross P. Barkhurst Waterford 3 Entergy Operations, Inc, cc:
W. Malcolm Stevenson, Esq.
Regional Administrator, Region IV
-Monroe & Leman U.S. Nuclear Regulatory Commission 201 St. Charles Avenue, Suite 3300 Office of Executive Director for h
New Orleans,-Louisiana 70170-3300 Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E. Blake-Arlington, Texas 76011 t
Shaw, Pittman, Potts & Trowbridge 2300 N Street,-NW Mr. Glen Miller, Administrator Washington, D.C.
20037 Radiation Protection Division Office of Air Quality and Nuclear Energy -
. Resident Inspector /Waterford NPS~
Post Office Box 14690 Post Office Box 822 Baton Rouge, Louisiana 70898 K111one, Louisiana.70066 President, Parish Council-Mr. Gerald =W. Muench
>St. Charles Parish Vice President, Operations
-Hahnv111e, Louisiana 70057 Support Entergy Operations, Inc.
~Mr. Donald C. Hintz.
P. O. Box 31995'
- Executive Vice President and
. Jackson, Mississippi 39286 iChief Operating Officer
.Entergy Operations, Inc.
William A. Cross P. O., Box 31995 Bethesda Licensing Office F
Jackson, Mississippi-39286 l3 Metro Center Suite 610 4
~ Chairman Bethesda,-Maryland 20814 Louisiana'Public Service Commission-I 10ne American' Place, Suite-1630-
- Mr. Robert B. McGehee n
1
-Baton' Rouge, Louisiana 70825-1697 Wise, Carter, Child & Caraway'-
l P. 0.~ Box 651 b*
.Mr.lR. f. Burski, Director. -
~ Jackson, Mississippi 39205-E
?NuclearcSafety L
Entergy Operations, Inc.
Mr. J'. R.' McGaha, Jr. :
-317,Baronne Street-General Manager Plant Operations O
New Orleans, Louisiana 70112 Entergy Operations, Inc.
i P. O. Box B
(
~Mr.'L. W. Laughlin, Site Licensing K111ona, Louisiana 70066
- i Support Supervisor l
1
.Entergy Operations, Inc.
Mr. Jerrold'G. Dewease 4
P. 0.mBox B - -
Sr. Vice-President
-K111ona', Louisiana.:70066 Planning-& Assurance Entergy Operations,'Inc.
,1 L'.
Post Ofice Box'31995 L
Jackson, Mississippi 39286-1995 L
I.
I r
+
mm-m.u.
e s-y.-
w w-1
ENCLOSURE UNIMPLEMENTED GSIs AT WATERFORD 3 i
PROJECTED IMPLEMENTATION-GSI NO.
TITLE DATE REMARKS 43(B107)
Reliability Of Air Refueling March 1991 Two valve air Systems accumulators are to be modified to assure margin is 1
restored (found:
tobesmall).
Current sizes provide opera-bility but not original design.
margin.
51(L913)
Improving the Refueling March 1991 Five items remain.
Reliability of open.
None will Open-Cycle Service cause detrimental Water Systems effect before completion.
-75(LOO 3)'-
' Item 2.2.2 - Vendor GL 90-03 Schedule.
Licensee-will LInterface for meet schedule Safety-Related
. developed by NRC
-Components for GL 90-03.-
y 99'(L817)
RCS/RHR Suction Refueling March 1991-Refueling needed to Line Valve 1 remove interlocks
- Interlock on PWRs and install new.
shutdown cooling level indication i
system.
Interlocks to be removed before use of SDC 4
where problems may occur.