Forwards Understanding of Current Status of Unimplemented GSIs at Facility,Per 900626 Response to Generic Ltr 90-04. Timely Completion of Encl GSIs Urged
ML20058E862
Person / Time
Site: Waterford 
Issue date: 11/01/1990
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Barkhurst R
ENTERGY OPERATIONS, INC.
References
REF-GTECI-043, REF-GTECI-051, REF-GTECI-075, REF-GTECI-099, REF-GTECI-NI, TASK-043, TASK-051, TASK-075, TASK-099, TASK-43, TASK-51, TASK-75, TASK-99, TASK-OR GL-90-03, GL-90-04, GL-90-3, GL-90-4, NUDOCS 9011080001
Download: ML20058E862 (4)


Text

_

e November 1, 1990

Decket No. 50-382-Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.

Post Office Box B K111ona, Louisiana 70066

Dear Mr. Barkhurst:

SUBJECT:

UNIMPLEMENTED GENERIC SAFETY ISSUES AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 On April 25, 1990, the staff issued Generic Letter 90 04 which requested infor-mation concerning the implementation status.of certain generic safety issues (GSIs) at your facility. Based on the Waterford 3 response to this Generic

' Letter, dated June-26, 1990; our own records, and' discussions with your staff, we have updated-our database on GSIJimplementation status. The results of.this-effort were' presented to the Connission at a meeting on October 25,1990.

')

The enclosure-to this letter sunmarizes the staff's understanding of the i

current status'of those GSIs which remain unimplemented at Waterford 3.

s We appreciete the assistance you-provided in responding.to Generic Letter 190 04 and we encourage your timely completion'of those GSIs listed ~1n the -

enclosure.

Please contact me if you have any questions or comments about the enclosed

'information.

o Sincerely, ORIGINAL SIGNED BY:

l David Wigginton, Senior Project Manager Project Directorate IV.1' Division of Reactor. Projects

III, IV, V and Special Projects Office of-Nuclear Reactor Regulation-1' g

b

Enclosure:

.As" stated-y, l

cc w/ enclosure:

1 See next page n.

' DISTRIBUTION

.. )9C-

,55Hireme#

T. Quay M. Virgilio MS13E4) 4R.'Scho11 MS13E4 P

NRC;PDR' L'.. Berry _

E. Jordan MNBB 3701 D~.. Miller MS14H20~.

Local.PDR-D.'Wigginton ACRS (10) MS P-315 PD4 1 Reading:

PD4 1 Plant File OGC MS15B18

/.......:...../g,d....:..............::..............::.............

PM

PD4-1 D L OFC.
PD4-1/LA
PD4 NAMEl :LBerry
DWi nton:1h :TQuay DATE tlh/8 090-
10 70 90

-:n/I/90 i

/ /

-OFFICIAL RECORD COPY Document Name: GENERIC SAFETY ISSUE WATERFORD 9011080001 901101 PDR ADOCK 05000382 PDC Y

P

~. _

gh Rio j'

Qc?[.

o,j.

UNITED STATES

];

g NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON, D. C 20S$5 J

i.

ft

/

November 1, 1990 y.

Docket No.' 50-382 Mr. Ross P.. Barkhurst Vice President Operations Entergy Operations, Inc.

Post Office Box B.

Killona,-Louisiana -70066 l

Dear Mr. Barkhurst:

SUBJECT:

UNIMPLEMENTED GEN RIC SAFETY ISSUES AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 On April 25,=1990, the staff issued Generic Letter 90-04'which requested infor-mation concerning the implementation status of certain-generic safety issues (GSIs) at your facility. Based-on the Waterford 3 response to.this Generic.

Letter, dated June 26, 1990, our own records, and. discussions with your-staff,

.we have updated our-database on GSI implementation status. The results of this effort were presented to the Commission at a meeting-on October.25, 1990.

The enclosure to this letter summarizes the~ staff's understanding of the current status of.those GSIs which remair unimplemented at Waterford 3.

We appreciate the assistance.you provided in responding. to Generic Letter 90-04 and we encourage;your timely completion of those GSIs listed in the enclosure.

Please; contact me if you have any questions or comments about the enclosed information.-

~

l t

.i Sincerely, l

David Wig i ton, Senior Project' Manager Project Directorate IV-l' Division of Reactor Projects - III,.

IV, Y and Special Projects.

Office of Nuclear Reactor Regulation

Enclosure:

LAs: stated cc w/ enclosure:

See.next page-

__.,_.._-_-_,m

+,.,

u

?-

j t Mr. Ross P. Barkhurst Waterford 3 Entergy Operations, Inc, cc:

W. Malcolm Stevenson, Esq.

Regional Administrator, Region IV

-Monroe & Leman U.S. Nuclear Regulatory Commission 201 St. Charles Avenue, Suite 3300 Office of Executive Director for h

New Orleans,-Louisiana 70170-3300 Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E. Blake-Arlington, Texas 76011 t

Shaw, Pittman, Potts & Trowbridge 2300 N Street,-NW Mr. Glen Miller, Administrator Washington, D.C.

20037 Radiation Protection Division Office of Air Quality and Nuclear Energy -

. Resident Inspector /Waterford NPS~

Post Office Box 14690 Post Office Box 822 Baton Rouge, Louisiana 70898 K111one, Louisiana.70066 President, Parish Council-Mr. Gerald =W. Muench

>St. Charles Parish Vice President, Operations

-Hahnv111e, Louisiana 70057 Support Entergy Operations, Inc.

~Mr. Donald C. Hintz.

P. O. Box 31995'

Executive Vice President and

. Jackson, Mississippi 39286 iChief Operating Officer

.Entergy Operations, Inc.

William A. Cross P. O., Box 31995 Bethesda Licensing Office F

Jackson, Mississippi-39286 l3 Metro Center Suite 610 4

~ Chairman Bethesda,-Maryland 20814 Louisiana'Public Service Commission-I 10ne American' Place, Suite-1630-

Mr. Robert B. McGehee n

1

-Baton' Rouge, Louisiana 70825-1697 Wise, Carter, Child & Caraway'-

l P. 0.~ Box 651 b*

.Mr.lR. f. Burski, Director. -

~ Jackson, Mississippi 39205-E

?NuclearcSafety L

Entergy Operations, Inc.

Mr. J'. R.' McGaha, Jr. :

-317,Baronne Street-General Manager Plant Operations O

New Orleans, Louisiana 70112 Entergy Operations, Inc.

i P. O. Box B

(

~Mr.'L. W. Laughlin, Site Licensing K111ona, Louisiana 70066

- i Support Supervisor l

1

.Entergy Operations, Inc.

Mr. Jerrold'G. Dewease 4

P. 0.mBox B - -

Sr. Vice-President

-K111ona', Louisiana.:70066 Planning-& Assurance Entergy Operations,'Inc.

,1 L'.

Post Ofice Box'31995 L

Jackson, Mississippi 39286-1995 L

I.

I r

+

mm-m.u.

e s-y.-

w w-1

ENCLOSURE UNIMPLEMENTED GSIs AT WATERFORD 3 i

PROJECTED IMPLEMENTATION-GSI NO.

TITLE DATE REMARKS 43(B107)

Reliability Of Air Refueling March 1991 Two valve air Systems accumulators are to be modified to assure margin is 1

restored (found:

tobesmall).

Current sizes provide opera-bility but not original design.

margin.

51(L913)

Improving the Refueling March 1991 Five items remain.

Reliability of open.

None will Open-Cycle Service cause detrimental Water Systems effect before completion.

-75(LOO 3)'-

' Item 2.2.2 - Vendor GL 90-03 Schedule.

Licensee-will LInterface for meet schedule Safety-Related

. developed by NRC

-Components for GL 90-03.-

y 99'(L817)

RCS/RHR Suction Refueling March 1991-Refueling needed to Line Valve 1 remove interlocks

Interlock on PWRs and install new.

shutdown cooling level indication i

system.

Interlocks to be removed before use of SDC 4

where problems may occur.

.l

?