ML20205M056

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/99-04 on 990301-19.One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy
ML20205M056
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/09/1999
From: Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20205M060 List:
References
50-382-99-04, 50-382-99-4, NUDOCS 9904150077
Download: ML20205M056 (5)


See also: IR 05000382/1999004

Text

. ____ __ . ____ - --

_

.

I

_

g* "'%g UNITED STATES

y *g NUCLEAR REGULATORY COMMISSION

-

i g REGION IV

g

  • [ 611 RYAN PLAZA DRIVE, SUITE 400

ARUNGTON, TEXAS 70011 eOS4

APR 9 1999

..

Chart L M. Dugger, Vice President

Operapons - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

-

SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-04

Dear Mr. Dugger:

-

This refers to the inspection conducted on March 1 to 19,1999, at the Waterford Steam Electric

p Station, Unit 3 facility. The purpose of the inspection was to (1) review the inservice inspection

L program implementation, and (2) followup on reactor trip breaker performance and reactor

coolant system piping and pressurizer instrumentation nozzle repairs. The enclosed report

a presents the results of this inspection.

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred. The violation is being treated as a noncited violation, consistent with

Apper diA C of the Enforcement Policy. The nonoted violation is described in the subject

inspection report. If you contest the violation or severity level of the noncited violation, you

"--

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to th Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001, with copies to the Regional Administrctor, Region IV, and the

Director, -Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter cnd its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions conceming this inspection, we will be pleased to discuss them

with you.

Sincerely,

-

'

'

Dr. Dale A. Powers, Chief

Engineering and Maintenance Branch

Division of Reactor Safety

9904150077 9904C9

PDR ADOCK 05000382

G PDR

-

_ _ - - .

,m ,

--

.

.

Entergy Operations, Inc. -2-

Docket No.: 50-382

License No.: NPF-38

Enclosure:

NRC inspection Report No.

50-382/99-04

cc w/ enclosure:

Executive Vice President and

Chief Operating Officer ~

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

E Jergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Managcr, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697 l

Director, Nuclear Safety &

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc. l

P.O. Box B  !

Killona, Louisiana 70066 j

l

i

.

.

Entergy Operations, Inc. -3-

William H. Spell, Adrninistrator

Louisiana Radiation Protection Division

P.O. Bcx 82135

Baton Rouge, Louisiana 70884-2135

Parish President

St. Charles Parish

P.O. Box 302

Hahnville, Louisiana 70057

Winston & Strawn

1400 L Street, N.W. 1

Washington, D.C. 20005-3502

l

l

I

l

1

!

l

,

I

l

z

l...

..

l

t

l

'

l Entergy Operations, Inc. -4-

i

l

'

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E 'Aail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

'

bec to DCD -(IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director  !

DRS-PSB .

DRS Director

MIS System i

Branch Chief (DRP/D) l

RIV File  !

l Project Engineer (ORP/D)

Branch Chief (DRP/TSS)

DOCUMENT NAME: S:\DRS\ REPORTS \wt904rp.cej

To receive copy of document. Indicate in box: 'C' = Copy without enclosures *E* = Copy with enclosures *N* = No copy

RIV:SRl:EMB .

C:DRS E C:PBD , C:DRS

CEJohnson/imb % DAPowers t)0P

'

PHarrell '. DAPowers gM

04/3/99 04/5/99 04C/99 #/ Tl 044/99

OFFICIAL RECORD COPY 1

1

1

I

_

-

9

,

e

Entergy Operations, Inc. -4

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Controi Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DP.P/D)

RIV File

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

I

l

DOCUMENT NAME: S:\DRS\ REPORTS \wt904rp.cej

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:SRl:EMB l _

C:DRS ld' C:PBD , C:DRS l l

CEJohnson/imb % DAPowers s ' PHarrell l _ ' DAPowers df

04/3/99 04/'/99 04/r/99 V/ I 044/99

OFFICIAL RECORDCOPY

140003

4