ML20206U785
| ML20206U785 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/18/1999 |
| From: | Powers D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20206U790 | List: |
| References | |
| 50-382-99-06, 50-382-99-6, NUDOCS 9905260014 | |
| Download: ML20206U785 (5) | |
See also: IR 05000382/1999006
Text
.j
0 I h
3
I
.
p""'ag
UNITED STATES
i
l
E,.
E
' )
y
t
NUCLEAR REGULATORY COMMISSION
,
q
,
REGloN IV
,
e
611 RYAN PLAZA DRIVE, sufTE 400
j
q,g
ARLINGTON, TEXAS 76011-8064
.3 [
May 18,1999
.
h
ll
Charles M. Dugger, Vice President
I]
f
Operations - Waterford 3
l
Entergy Operations, Inc.
P.O. Box B
.
h
[
Killona, Louisiana 70066
,
'
'
l
'
,
SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-06
}
d
0 f
Dear Mr. Dugger:
This refers to the inspection conducted on April 5 to 9,1999, at the Waterford Steam Electric
(
Station, Unit 3 facility. The purpose of the inspection was to followup on issues identified during
i
I
an architect engineering inspection documented in NRC Inspection Report 50-382/98-201. The
i
enclosed report presents the results of this inspection.
Ig
The team determined that your personnel had, with only one exception, adequately addressed
t
each of the previously identified issues from the architect engineering inspection that were
h
reviewed. The team did not review the issue identified in the architect engineering report that
'
'
,
related to the effects of tornadoes on equipment located on the roof; this issue is being
reviewed in the Office of Nuclear Reactor Regulation. In addition to those items from the
architect engineering inspection, the team reviewed other previously identified issues.
j
i
As a result of you providing us with a response for each of the items discussed in the architect
b
L
engineering report, the team was able to review your position and actions prior to arriving on
h ]
site. The team found the information provided in the response to have been thorough, detailed,
'
j
and sufficient to address many of the issues without requiring significant onsite review.
'
g
,
l
Based on the results of this inspection, the NRC has determined that three violations of NRC
a
requirements occurred. These violations are being treated as non-cited violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
!
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with copies to the Regional Administrator, Region IV, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001, and the resident inspector at the Waterford Steam Electric Station, Unit 3
,
facility.
One unresolved item was identified concerning your ability to demonstrate that adequate flows
could be developed to meet design requirements when total loop uncertainties (e.g., process
L
fluid density, system flow resistance, total instrument loop uncertainties, etc.) were considered
l
'
l
.
9905260014 990518
I
'
e
gDR
ADOCK 05000392
E : h
'
s
. _ _ _
_ _ . _ . _
ll i ll !$
,
t
. .
- Entergy Operations, Inc.
-2-
. for pumps in the following systems: high pressure safety injection, auxiliary component cooling
water, component cooling water, chemical and volume control, essential chilled water, and
emergency feedwater. This matter is discussed in Section E8.23 of the enclosed inspection
report. This item remains unresolved pending further review by the NRC of your position and
any subsequent evaluation you may perform.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
d u, & u )w w
9
Dr. Dale A. Powers, Chief
Engineering and Maintenance Branch
Division of Reactor Safety
Docket No.:
50-382
License No.: NPF-38
Enclosure:
NRC Inspection Report No.
50-382/99-06
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
. P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
{
P.O. Box 651
Jackson, Mississippi 39205
'
i
)
i
t
ff.,
1
e
!
Entergy Operations, Inc.
-3-
l
l
l-
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
!
Killona, Louisiana 70066
i
!-
!'
Manager- Licensing Manager
,
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Chairman
, Louisiana Public Service Commission
One American Place, Suite 1630
i
l
Baton Rouge, Louisiana 70825-1697
l
. Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
I
Killona, Louisiana 70066
Ronald Wascom, Administrator
Louisiana Radiation Protection Division
/
!
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
l.
Parish President.
i
St. Charles Parish
i
P.O. Box 302
Hahnville, Louisiana 70057
i
l
Winston & Strawn
l
'
- 1400 L Street, N.W.
Washington, D.C. 20005-3502
i
l
i
!
l
I
c
-.
I
Entergy Operations, Inc.
-4
i
E-Mail report to T. Frye (TJF)
'
E-Mail report to D. Lange (DJL)
-
E-Mail report to NRR EveM Tracking System (IPAS)
E-Mail report to Documenit Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
bec to DCD (IE01)
i
l
bec distrib. by RIV:
i
Regional Administrator
l
Resident inspector
DRP Director
DRS Director
MIS System
Branch Chief (DRP/D)
RIV File
Project Engineer (DRP/D)
. Branch Chief (DRP/TSS)
l
)
l
l
'
.
i
1
l
l.
DOCUMENT NAME: R:\\_WAT\\WA906RP.CJP
'
To escolve copy of f::1r :77, Indicato in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:SRl:EMB
RI:EMB
C:EMB
C:PBD
C:EMB
i
._,
CJPaulk/imb/E7
PAGoldbero*
DAPowersM-
PHHarrell M DAPowersylP
'
05/$99
7
04/30/99
05Af/99
05/9 99
054f/99
'
'
'
l
- Previously con' curred
OFFICIAL RECORD COPY
I'
,
,
a
i
'
e
c
5
i
Entergy Operations, Inc.
-4-
i
i
l
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS Director
1
. MIS System
Branch Chief (DRP/D)
RIV File
'
.
Project Engineer (DRP/D)
'
Branch Chief (DRP/TSS)
I
DOCUMENT NAME: R:\\_WAT\\WA906RP.CJP
To receive copy of document, Indicate in box: *c" = Copy without enclosures *E" = copy with enclosures *N" = No copy
RIV:SRl:EMB
Rl:EMB
C:EMB
C:PBD
C:EMB
_,
CJPaulk/Imb(F
PAGoldberg*
DAPowersMf
PHHDrrell Ml(
DAPowers aP
05/$99
04/30/99
05K/99
05/9 99
05&/99
'
- Previously con' curred
OFFICIAL RECORD COPY
z500:!G