Forwards Insp Rept 50-382/99-06 on 990405-09.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations
ML20206U785
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/18/1999
From: Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20206U790 List:
References
50-382-99-06, 50-382-99-6, NUDOCS 9905260014
Download: ML20206U785 (5)


See also: IR 05000382/1999006

Text

.j

0 Ih

3

.

I

p""'ag UNITED STATES i l

y t NUCLEAR REGULATORY COMMISSION

,

E,. E

,

REGloN IV

q

'

)

,

e 611 RYAN PLAZA DRIVE, sufTE 400 j

q,g ARLINGTON, TEXAS 76011-8064

.3

[

May 18,1999 .

l

Charles M. Dugger, Vice President

ll

h

f

Operations - Waterford 3

Entergy Operations, Inc.

I] l

!

.

h

P.O. Box B

Killona, Louisiana 70066 [

' '

,

'

,

l

SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-06 } d

0 f

Dear Mr. Dugger:

This refers to the inspection conducted on April 5 to 9,1999, at the Waterford Steam Electric

(

Station, Unit 3 facility. The purpose of the inspection was to followup on issues identified during I

i

an architect engineering inspection documented in NRC Inspection Report 50-382/98-201. The * #

i

enclosed report presents the results of this inspection. Ig

The team determined that your personnel had, with only one exception, adequately addressed t

each of the previously identified issues from the architect engineering inspection that were

reviewed. The team did not review the issue identified in the architect engineering report that ' h

,

'

related to the effects of tornadoes on equipment located on the roof; this issue is being

reviewed in the Office of Nuclear Reactor Regulation. In addition to those items from the

architect engineering inspection, the team reviewed other previously identified issues. j

i

As a result of you providing us with a response for each of the items discussed in the architect b L

engineering report, the team was able to review your position and actions prior to arriving on h]'

site. The team found the information provided in the response to have been thorough, detailed, j

and sufficient to address many of the issues without requiring significant onsite review. '

, g

Based on the results of this inspection, the NRC has determined that three violations of NRC l

a

requirements occurred. These violations are being treated as non-cited violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection report, with the basis for  !

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001, with copies to the Regional Administrator, Region IV, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001, and the resident inspector at the Waterford Steam Electric Station, Unit 3 ,

facility.

One unresolved item was identified concerning your ability to demonstrate that adequate flows

could be developed to meet design requirements when total loop uncertainties (e.g., process L

fluid density, system flow resistance, total instrument loop uncertainties, etc.) were considered

'

l

l

.

9905260014 990518 e I '

gDR ADOCK 05000392

PDR E:h '

s

l

. _ _ _ _ _ . _ . _ ll i ll !$

,

t

. .

- Entergy Operations, Inc. -2-

. for pumps in the following systems: high pressure safety injection, auxiliary component cooling

water, component cooling water, chemical and volume control, essential chilled water, and

emergency feedwater. This matter is discussed in Section E8.23 of the enclosed inspection

report. This item remains unresolved pending further review by the NRC of your position and

any subsequent evaluation you may perform.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

d u, & u )w w 9

Dr. Dale A. Powers, Chief

Engineering and Maintenance Branch

Division of Reactor Safety

Docket No.: 50-382

License No.: NPF-38

Enclosure:

NRC Inspection Report No.

50-382/99-06

cc w/ enclosure:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

. P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway {

P.O. Box 651 1

'

Jackson, Mississippi 39205

i

)

i

!

l

t l

l

ff.,

1

e

! Entergy Operations, Inc. -3-

l

l

l- General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B  !

! Killona, Louisiana 70066 i

!-

!' Manager- Licensing Manager ,

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

, Louisiana Public Service Commission

i One American Place, Suite 1630

l Baton Rouge, Louisiana 70825-1697

l

. Director, Nuclear Safety &

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

I

Killona, Louisiana 70066

Ronald Wascom, Administrator

Louisiana Radiation Protection Division /

!

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

l.

Parish President. i

St. Charles Parish  ;

i P.O. Box 302

Hahnville, Louisiana 70057

i

l Winston & Strawn I'

l

1400 L Street, N.W.

Washington, D.C. 20005-3502 i

l

i

1

!

l

I

c

-.

I

Entergy Operations, Inc. -4

i

E-Mail report to T. Frye (TJF)

'

E-Mail report to D. Lange (DJL) -

l

E-Mail report to NRR EveM Tracking System (IPAS)

E-Mail report to Documenit Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bec to DCD (IE01)

i

l

bec distrib. by RIV:

i Regional Administrator

l Resident inspector

DRP Director

DRS Director

MIS System

Branch Chief (DRP/D)

RIV File

Project Engineer (DRP/D)

. Branch Chief (DRP/TSS)

l )

l

l

'

.

i

1

!

l

l.

'

DOCUMENT NAME: R:\_WAT\WA906RP.CJP

To escolve copy of f::1r :77, Indicato in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:SRl:EMB RI:EMB C:EMB C:PBD ._, C:EMB i

'

CJPaulk/imb/E7 PAGoldbero* DAPowersM- PHHarrell M DAPowersylP

' ' '

05/$99 7 04/30/99 05Af/99 05/9 99 054f/99

l *Previously con' curred OFFICIAL RECORD COPY

I'

!

!

, ,

a i

'

e

c  ;

5

Entergy Operations, Inc. -4- i

i

i

l

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS Director 1

. MIS System

Branch Chief (DRP/D)

RIV File

'

.

'

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

I

DOCUMENT NAME: R:\_WAT\WA906RP.CJP

To receive copy of document, Indicate in box: *c" = Copy without enclosures *E" = copy with enclosures *N" = No copy

RIV:SRl:EMB Rl:EMB C:EMB C:PBD _, C:EMB

CJPaulk/Imb(F PAGoldberg* DAPowersMf PHHDrrell Ml( DAPowers aP '

05/$99 04/30/99 05K/99 05/9 99 05&/99

  • Previously con' curred OFFICIAL RECORD COPY

z500:!G