IR 05000382/1987009
| ML20214S667 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/29/1987 |
| From: | Fisher W, Hackney C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20214S658 | List: |
| References | |
| 50-382-87-09, 50-382-87-9, NUDOCS 8706090364 | |
| Download: ML20214S667 (3) | |
Text
______ __-_-____
_ ___ __ _ __
-
,s
.
APPENDIX
'
U.S. NUCLEAR REGULATORY COMMISSION
!
REGION IV
,
l NRC Inspection Report:
50-382/97-09 License:
!
Docket:
50-382 l
'
l l
Licensee:
Loulslana Power & Light Company (LP&L)
l N 80
!
317 8aronne Street New Orleans, Louisiana 70160 l
Facility Name:
Waterford 3
-
l Inspection At:
Taft, Louisiana
[
Inspection Conducted:
May 11-15, 1987 i
t inspector:
//r (a v (
Nf!<fot.W
$ 'Jh$)
C. A. Ilackney, Emergency Preparednp[ Analyst Date
-
l
[
l Approved:
hh
.
I~
-
fdt 9/f]
Fisher,}ITe, uc ear h.Inls and UYle
.
.
Emergency Preparednons Granch
!
.
Inspection Sunwiry
'
l
. Inspection Conducted May 11 15, 1987 (Report 50-38?/87 09)
i
!
!
Arnas insocetod:
Routino, announced inspection of notifications and l
UimmunRETonn, changes to the emergoney preparedness program, shif t staf fing i
and augmentation, and licenseo audits and quality assurance.
Rotults:
Within the areas inepocted, no ylolations, dovlations, or
,
UdfEfinclos were identified, i
h
,
o
..nn
I
_____ _ _____ _
_ __
, s.
l
,
i I
i-2-l
!
t l
DETAILS
[
(
l r
1.
Persons Contacted Licensee
!
- R. Barkhurst, Vice President, Nuclear f
- N, Carns, Plant Manger
- R Azzarello, Emergency Preparedness Manager r
- P. Backes, Nuclear Quality Assurance Manager
!
- S, Alleman, Assistant Plant Manager, Technical Services l
- F Englebracht, Manager, Nuclear Operations Administration i
L
- Denotes attendance at exit interview, The NRC Inspector also held discussions with other station personnel in j
the areas of emergency detection and classifications, protective action i
recommendations, notification and communications, staffing and i
augmentation, health physics, operations, and emergency response organization.
2.
Proaram Areas _ Inspected The following arogram areas were inspected.
The inspection included interviews wit 1 cognizant individuals, observation of activities, and record reviews.
The depth and scope of these activities were consistent
!
with past findings and with the current status of the facility.
[
!
Except as noted, the inspection revealed no violations, deviations.
[
deficiencies, unresolved items, or open items.
Notations after a specific l
Inspection team identify the following:
I = item not inspected or only i
Jartially inspected, V a violation 0 m deviation, H = deficiency, j=unret.olveditem,and0mopenItem.
.
i inspection Procedurg functional Area and Inspection Requirements I
i 02203 Notifications and Communications
!
02204 Changos to [morgency Preparedness Program
!
82205 Shift 5taffIng and Augmentation 02210 Licensee Audits and Quality Assurance 3.
[xitInterviw i
The NRC inspector mot with the licensee representativos denoted in paragraph 1 on May 15, 1907, and summarized the scope and findings of the
,
inspection as presented in this report.
[
r Tha NRC Inspector questioned the availab(11ty of a control room
communicator for offatto notification In the event of a fire.
The person
i
?
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ -
____
_ _ _
, '..
3-designated as the control room communicator was also assigned as a member of the fire brigade.
Additionally, the NRC inspector determined from training record reviews that emergency preparedness training for the shift
'
technical advisors (STA) had been terminated.
The STA may be used in
special cases to perform as a communicator.
Mr. N. Carns, Plant Manager, stated that both the communicator and the STA training concern would be reviewed and a response given to the NRC during the week of May 18, 1987.
On May 19, 1987, Mr. N. Carns contacted the NRC inspector and committed to designate one operator as a communicator and to replace the operator position on the fire brigade with a security guard.
Additionally, all STA
~,
personnel will receive additional training as emergency communicators.
Both commitments are to be completed by July 1, 1987
,
F I
(
I I
&
. - - - - _..... _ _ _