Insp Rept 50-382/87-09 on 870511-15.No Violations Noted. Major Areas Inspected:Notifications & Communications,Changes to Emergency Preparedness Program,Shift Staffing & Augmentation & Licensee Audits & QA
ML20214S667
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/29/1987
From: Fisher W, Hackney C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20214S658 List:
References
50-382-87-09, 50-382-87-9, NUDOCS 8706090364
Download: ML20214S667 (3)


Text

______ __-_-____

_ ___ __ _ __

-

,s

.

APPENDIX

'

U.S. NUCLEAR REGULATORY COMMISSION

!

REGION IV

,

l NRC Inspection Report:

50-382/97-09 License:

NPF-38

!

Docket:

50-382 l

'

l l

Licensee:

Loulslana Power & Light Company (LP&L)

l N 80

!

317 8aronne Street New Orleans, Louisiana 70160 l

Facility Name:

Waterford 3

-

l Inspection At:

Taft, Louisiana

[

Inspection Conducted:

May 11-15, 1987 i

t inspector:

//r (a v (

Nf!<fot.W

$ 'Jh$)

C. A. Ilackney, Emergency Preparednp[ Analyst Date

-

l

[

l Approved:

hh

.

I~

-

fdt 9/f]

Fisher,}ITe, uc ear h.Inls and UYle

.

.

Emergency Preparednons Granch

!

.

Inspection Sunwiry

'

l

. Inspection Conducted May 11 15, 1987 (Report 50-38?/87 09)

i

!

!

Arnas insocetod:

Routino, announced inspection of notifications and l

UimmunRETonn, changes to the emergoney preparedness program, shif t staf fing i

and augmentation, and licenseo audits and quality assurance.

Rotults:

Within the areas inepocted, no ylolations, dovlations, or

,

UdfEfinclos were identified, i

h

,

o

..nn

I

_____ _ _____ _

_ __

, s.

l

,

i I

i-2-l

!

t l

DETAILS

[

(

l r

1.

Persons Contacted Licensee

!

  • R. Barkhurst, Vice President, Nuclear f
  • N, Carns, Plant Manger
  • P. Backes, Nuclear Quality Assurance Manager

!

  • S, Alleman, Assistant Plant Manager, Technical Services l
  • F Englebracht, Manager, Nuclear Operations Administration i

L

  • Denotes attendance at exit interview, The NRC Inspector also held discussions with other station personnel in j

the areas of emergency detection and classifications, protective action i

recommendations, notification and communications, staffing and i

augmentation, health physics, operations, and emergency response organization.

2.

Proaram Areas _ Inspected The following arogram areas were inspected.

The inspection included interviews wit 1 cognizant individuals, observation of activities, and record reviews.

The depth and scope of these activities were consistent

!

with past findings and with the current status of the facility.

[

!

Except as noted, the inspection revealed no violations, deviations.

[

deficiencies, unresolved items, or open items.

Notations after a specific l

Inspection team identify the following:

I = item not inspected or only i

Jartially inspected, V a violation 0 m deviation, H = deficiency, j=unret.olveditem,and0mopenItem.

.

i inspection Procedurg functional Area and Inspection Requirements I

i 02203 Notifications and Communications

!

02204 Changos to [morgency Preparedness Program

!

82205 Shift 5taffIng and Augmentation 02210 Licensee Audits and Quality Assurance 3.

[xitInterviw i

The NRC inspector mot with the licensee representativos denoted in paragraph 1 on May 15, 1907, and summarized the scope and findings of the

,

inspection as presented in this report.

[

r Tha NRC Inspector questioned the availab(11ty of a control room

communicator for offatto notification In the event of a fire.

The person

i

?

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ -

____

_ _ _

, '..

3-designated as the control room communicator was also assigned as a member of the fire brigade.

Additionally, the NRC inspector determined from training record reviews that emergency preparedness training for the shift

'

technical advisors (STA) had been terminated.

The STA may be used in

special cases to perform as a communicator.

Mr. N. Carns, Plant Manager, stated that both the communicator and the STA training concern would be reviewed and a response given to the NRC during the week of May 18, 1987.

On May 19, 1987, Mr. N. Carns contacted the NRC inspector and committed to designate one operator as a communicator and to replace the operator position on the fire brigade with a security guard.

Additionally, all STA

~,

personnel will receive additional training as emergency communicators.

Both commitments are to be completed by July 1, 1987

,