Forwards Errata to Amend 62 to License NPF-38,consisting of Revised Bases Page Re Time Intervals for Surveillance Requirements,Per 900717 Application & Generic Ltr 89-14
ML20056B484
Person / Time
Site: Waterford 
Issue date: 08/22/1990
From: Quay T
Office of Nuclear Reactor Regulation
To: Barkhurst R
ENTERGY OPERATIONS, INC.
Shared Package
ML20056B485 List:
References
GL-89-14, TAC-77176, NUDOCS 9008280341
Download: ML20056B484 (3)


Text

'

l

[.,

August 22. 1990 Docket No. 50-3B2 Mr. Ross P. Barkhurst Vice President Operations i

Entergy Operations, Inc.

Post Office Box B K111ona, Louisiana 70066

Dear Mr. Berkhurst:

SUBJECT:

REVISIONTOBASES4.0.2;SURVEILLANCEINTERVALS(TAC 77176)

By letter dated July 17, 1990, the Entergy Operations, Inc. requec'<.4

^ange to the Waterford 3 Technical Specifications Bases to delete a p*. 'e m h previously overlooked in License Amendment No. 62.

're change o C%

specified time intervals for surveillance requirements; speci' u i. ts 4.0.2.

Generic Letter 89-14 dated August 21, 1989, had specit.*

N acceptable wording for the Bases which Entergy Operations had ac y 4 w included in License Amendment No. 62. However, the last paragrat

  • e 6 previous Bases was overlooked and remains with the current Bases.

We agree the paragraph should be removed. A revised Bases page is included with this letter.

If you have any further questions on this matter, please let us know.

Sincerely, Original signed by Theodore R. Quay, Acting Director Project Directorate IV-1 Division of Reactor Projects - III, IV, Y and Special Projects Office of Huclear Reactor Regulation

Enclosure:

DISTRIBUTION As stated uDocket Files NRC PDR cc w/ enclosure:

Local PDR See next page PD4-1 Reading B. Boger MS 13E4 T. Quay 9008280341 900822 L. Berry PDR ADOCK 05000382 D. Wigginton P

PNU OGC MS15B18-Rockville

!T E. Jordan MS MNBB 3701

\\

ACRS(10)MSP-315 fD\\

0004}

PD4-1 Plant file g

0FC

PD4- /
PD4'
PD4-p.....:..

NAME

LB. rrytlh
DW.

ton

TQu DATE :08/2;/90
08/7 /90
08/b90 OFFICIAL RECORD COPY Document Name:

REVISION TO BASES TAC 77176 i

l

q

  • J[pasc oq k

UNITED STATES I

_y 3

3 NUCLEAR REGULATORY COMMISSION i

q WASHINGTON, D. C. 20555

%,...../

August 22, 1990 I

Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Enter 9y Operations, inc.

Post Office Box B Killona, Louisiana 70066

Dear Mr. Barkhurst:

i

SUBJECT:

REVISIONTOBASES4.0.2;SURVE1LLANCEINTERVALS(TAC 77176)

By letter dated July 17, 1990, the Entergy Operations, Inc. requested a change to the Waterford 3 Technical Specifications Bases to delete a paragraph previously overlooked in License Amendment No. 62. The change involves the specified tirae intervals for surveillance requirements; specifically Bases 4.0.2.

Generic Letter 89-14 dated August 21, 1989,-had specified the acceptable wording for the Bases which Entergy Operations had ado)ted and was included in License Arnendment No. 62.

However, the last persgrapi of the previous Bases was overlooked and remains with the current Bases.

We agree the paragraph should be removed. A revised Bases page is included with this letter.

If you have any further questions on this matter, please let us know.

Sincerely, e

i Theodore R.,

, Actin,g Director Project Directorate IV-1 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page i

Mr. Ross P. Barkhurst Waterford 3 Intergy Operations, Inc.

cc:

W. Malcolm Stevenson, Esq.

Monroe & Leman Regional Administrator, Region IV 201 St. Charles Avenue, Suite 3300 U.S. Nuclear Regulatory Commission Office of Executive Director for New Orleans, Louisiana 70170-3300 Operations Mr. E. Slake 611 Ryan Plaza Drive, Suite 1090 Arliagton, Texas 76011 Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Mr. William H. Spell, Administrator Washington 0.C.

20037 Radiation Pretection Division Resident Inspector /Waterford NPS Departrant of Environmental Quality Post Office Box 822 Post Office Box 14690 P,4 ton Rouge, Louisiana 70898 I

K111ona, Louisiana 70066 President, Parish Counell St. Charles Parish Mr. Gerald W. Muench i

Vice President, Operations Hahnville, Louisiana 70057 Support Mr. Donald C. Hintz Entergy Operations, Inc.

P. O. Box 31995 Executive Vice President and Chief Operating Officer Jackson, Mississippi 39286 Entergy Operations, Inc.

P. O. Box 31995 William A. Cross Bethesda Licensing Office Jackson, Mississippi 39286 3 Metro Center Chairman Suite 610 Louisiana Public Service Commission Bethesda, Maryland 20814-One American Place, Suite 1630 Mr. Robert B. McGehee Baton Rouge, Louisiana 70825-1697 Wise, Carter, Child & Caraway P. O. Box 651 Mr. R. F. Burski, Director Nuclear Safety Jackson, Mississippi 39205 Entergy Operations, Inc.

317 Baronne Street Mr. J. R. McGaha, Jr.

General Manager Plant Operations New Orleans, Louisiana 70112 Entergy Operations, Inc.

P. O. Box B Mr. L. W. Laughlin, Site Licensing Killona, Louisiana 70066 Support Supervisor Entergy Operations, Inc.

P. O. Box B Mr. Jerrold G. Dewease Sr. Vice President Killona, Louisiana 70066 Planning & Assurance Entergy Operations, Inc.