Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator
ML20217L014
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/18/1999
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-99-0150, NUDOCS 9910270048
Download: ML20217L014 (3)


Text

-" J'T Entstgy Operations, Inc.

17265 Rever Road Killona, LA 70066 Tel 504 739 6242 Early C. Ewing til O recto clearSafety Assurance W3F1-99-0150 A4.05 PR October 18,1999 U.S. Nuclear Regulatory Commission l

ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Four Year Report on Anniversary of Simulator Certification Gentlemen:

The purpose of this letter is for Entergy Operations, Inc. (EOI) to update the NRC Staff regarding the circumstances and plans for submitting a certification report on the Waterford 3 plant specific simulator. ,

10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi) require the submittal of a report to the NRC Staff every four years that identifies uncorrected simulator test failures. The report is required to be submitted on the anniversary of simulator certification. Based on that schedule, EOl was due to submit a report on behalf of Waterford 3 by March 20,1999. The report was inadvertently not submitted due to unintended closure of the ongo'.ig commitment that tracks generation of the report. It was also determined that nine simulator tests were not completed within the four-year period. The failure to report on time as well as the failure to complete tests during the period is being o addressed within our corrective action program (Condition Report CR-WF3-1999 0 0939).

The failure to perform the tests did not result in a negative impact on operator training. Simulator scenarios for training and examinations are validated and are  ;

determined to be acceptable for the desired training prior to use in accordance with Training Procedure NTI-OP-004. The condition was discussed with NRC Staff ,

- personnel.

9910270048 991018  ;

PDR ADOCK 05000382 p PDR i

O Four Year Report on Anniversary of Simulator Certification W3#1-99-0150 Page 2 October 18,1999 i

Of the nine tests that were not performed within the four year period, five have now been performed. Of these five, three met acceptance criteria and two failed to meet acceptance criteria. Four of the nine tests remain to be performed. One additional test was identified for which there was indication that the test had been performed (and failed) during the four year certification period. However, test documentation was incomplete. That test is being re-run to properly document the test results. The remaining tests are expected to be completed by November 30,1999. The four year report will be submitted by December 17,1999. The report willinclude a list of any uncorrected test failures from the subject four year re-certification period.

This letter contains one, two part commitment that is documented on the attached commitment identification form. If you have any questions concerning the above, please contact J.M. O'Hern at (504) 739-6001. l Very truly yours, i

b RMjr-ya (6 c.c.%:d) .

E.C. Ewing Director, Nuclear Safety Assurance ECE/ OPP /rtk Attachment cc: E.W. Merschoff, NRC Region IV C.P. Patel, NRC-NRR J. Smith N.S. Reynolds NRC Resident inspectors Office

COMMITMENT IDENTIFICATlONNOLUNTARY ENHANCEMENT FORM Attachrnent 1'to W3F1-99-0150

Subject:

Four Year Report on Anniversary of Simulator Certification D te: October 18,1999 Pcge 1 of 1 SCHEDULED ONE-TIME COMPLETION ACTION' CONTINUING DATE (IF ASSOCIATED COMMITMENT (S) COMPLIANCE

  • REQUIRED) CR OR ER
1. Complete Simulator Performance Tests for the x 11/30/99 CR-WF3-199-list four year simulator re-certification period. 0939
2. Submit four year report. x 12/17/99

' Check one only VOLUNTARY ENHANCEMENT (S) ASSOCIATED CR OR ER

[Make sure that the transmittalletter for this document contains a statement to the effect that: 'Allof the commitments contained in this submittal are identified on the attached Commitment IdentificationNoluntary Enhancement Form ]

[Make sure that the transmittat letter conteirrs a statement to the effect that: 'This letter does not contain commitments

  • if the submittal does not contain commitments].