IR 05000382/1990023

From kanterella
Jump to navigation Jump to search
Submits Revised Schedule for Electrical Distribution Sys Functional Insp 50-382/90-23.Insp Team Will Arrive at Plant Site on 910107
ML20058A529
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/17/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Barkhurst R
ENTERGY OPERATIONS, INC.
References
NUDOCS 9010290009
Download: ML20058A529 (3)


Text

, w OCT I 7 f990

.

.

Doctet No.: 50-382/90-23 License No.: NPF-38 i

Entergy Operations, Inc.

ATTH: Ross P. Barkhurst, Vice President Operations, Waterford P.O. Box B K111ona, Louisiana 70066 Gentlemen:

This is to advise you of the revised schedule for the electrical distribution system functional inspection (EDSFI) at the Waterford Steam Electric Station, l

Unit 3.

This letter revises the proposed schedule transmitted in cur previous correspondence dated September 24, 1990.

The inspection team is presently scheduled to arrive on site tht. morning of January 7,1991, at approximately 8 a.m., and request an entrance meeting be

.

'

scheduled at approximately 9 a.m.

The on site inspection periods are planned during the weeks of January 7 January 21, and January 28, 1991. The inspection team still anticipates the preparatory trip to be conducted during December 4-6, 1990.

Should you have any questions regarding this team inspection, please contact Mr. T. O. McKernon at (817) 860-8153 or Mr. J. E. Gagliardo (817) 860-8270.

Sincerely, OdginalSigned By:

i Thomas P.Gwynn San'ucl J. Collins, Director Division of Reactor Projects cc Entergy Operations, Inc.

ATTH: Donald C. Hintz, Executive Vice President & Chief Operating Officer P.O. Cox 31995

'

Jackson, Mississippi 39286 Entergy Operations, Inc.

ATTH: Gerald W. Muench, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286

  • RIV:0PS
  • C:0PS
  • D:DRS
DRP TOMcKerron;1t JEGagliardo LJCallan SJCo)1 ins y

10/.3p 10/ /90 10/ /90 10/j/6/90

, n Sa, (9\\

  • PREV 10VSt.Y CONCURRED

'

ig 9010290009 901017

\\1 PDR ADOCK 05000313 L

C?

PDC

..

,.

.

.

,

Entergy Operations, Inc.

-2-Wise, Carter, Child & Caraway ATIN:

Robert B. McGehee, Esq.

P.O. Box 651 Jackson, Mississippi 39205 Entergy Operations, Inc.

ATTH:

J. R. McGaha, Jr., General Manager Plant Operations P.O. Box B Killona, Louisiana 70066 Entergy Operations, Inc.

ATTil:

J. G. Dewease, Senior Vice President, Planning & Assurance P.O. Box 31995 Jacirson, Mississippi 39286-1995 Entergy Operations, Inc.

ATTN:

L. W. Laughlin, Site Licensing Support Supervisor P.O. Box B Killona, Louisiana 70006 Monroe & Leman ATTN:

W. Malcolm Stevenson, Esq.

201 St. Charles Avenue, Suite 3300 New Orleans, Louisiana 70170-3300 Shaw, Pittnian, Potts & Trowbridge ATTN: Mr. E. Blake 2300 N Street, NW Washington, D.C.

20037 i

Chairman Louisiana Public Service Comission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Entergy Operations, Inc.

'

ATTN:

R. F. Burski, Director Nuclear Safety 317 Baronne Street New Orleans, Louisiana 70112 Department of Environmental Quality ATTN: William N. Spell, Administrator Radiation Protection Division P.O. Box 14690 Baton Rouge, Louisiana 70898

,

.*

.

,

.

Entergy Operations, Inc.

-3 President, Parish Council St. Charles Parish Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 U.S. Nuclear Regulatory Comission ATTH:

Resident Inspector P.O. Box 022 Killona, Louisiana 70066 U.S. Nuclear Regulatory Comission ATIN:

Regional Administrator, Region IV 611 Pgan Plaza Drive, Suite 1000 Arlington, Texas 76011 bectoDMD(IE01)

bec distrib. by RIV:

R. D. Martin Resident Inspector SectionChief(DRP/A)

DRP DRSS-FRPS MIS System Project Engineer (DRP/A)

RSTS Operator Rly file DRS D. Wigginton, NRR Project Manager (MS:

13-D-18)

Lisa Shea, RM/ALF J. E. Gagliardo T. O. McKernon T. O. McKernon Reading File