MONTHYEARML23261B1852023-09-14014 September 2023 Notification of Inspection and Request for Information IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23146A1342023-05-26026 May 2023 Information Request, Security IR 2023402 ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) IR 05000382/20220122022-09-16016 September 2022 Digital Instrumentation and Control Modification Inspection Report 05000382/2022012 ML22229A5362022-08-23023 August 2022 Inspection Plan Transmittal Letter-2022 Mid-Cycle-Final ML22187A0362022-07-11011 July 2022 Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2022013) and Request for Information ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1802022-05-0202 May 2022 WF3 Cpcs RF24 Inspection Plan ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email IR 05000382/20210062022-03-0202 March 2022 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2021006) ML21327A4542021-11-22022 November 2021 ISI PWR RFI ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 IR 05000382/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Waterford Steam Electric Station - Unit 3, (Report 05000382/2021005) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21159A2262021-06-0808 June 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection 05000382/2021003 and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21061A3432021-02-25025 February 2021 Request for Information: Waterford-3, Dated January 6, 2021, Inspection Report 05000382/2021-001 Occupational Radiation Safety Inspection-2 ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 IR 05000382/20200052020-09-0101 September 2020 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2020005) ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20055E1122020-03-0303 March 2020 WAT2019006 Annual Assessment Letter IR 05000382/20190052019-08-30030 August 2019 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3, Report 05000382/2019005 ML19113A2952019-04-25025 April 2019 Notification of Inspection (NRC Inspection Report 05000382/2019003 and Request for Information IR 05000382/20180062019-03-0404 March 2019 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018006) ML19035A6342019-02-0404 February 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2019010) and Initial Request for Information IR 05000382/20180052018-08-31031 August 2018 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018005) IR 05000382/20170062018-03-0101 March 2018 Annual Assessment Letter for Waterford Steam Electric Station Unit 3, (Report 05000382/2017006) IR 05000382/20170052017-08-28028 August 2017 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2017005) IR 05000382/20160062017-03-0101 March 2017 Annual Assessment Letter for Inspection Report 05000382/2016006 ML17055A6702017-02-24024 February 2017 Notification of NRC Triennial Heat Sink Performance Inspection (05000382/2017001) and Request for Information IR 05000382/20170012017-02-24024 February 2017 Waterford Steam Electric Station, Unit 3 - Notification of NRC Triennial Heat Sink Performance Inspection (05000382/2017001) and Request for Information IR 05000382/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005) ML16237A0652016-08-31031 August 2016 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005) IR 05000382/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2016401) IR 05000382/20150062016-03-0202 March 2016 Annual Assessment Letter for Waterford Unit 3 (Report 05000382/2015006) IR 05000382/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401) IR 05000382/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2015005) ML15149A2562015-05-28028 May 2015 Notification of Inspection (NRC Integrated Inspection Report 05000382/2015003)And Request for Information IR 05000382/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2014006) IR 05000382/20130012014-03-0404 March 2014 Annual Assessment Letter for Waterford Steam Electric Station (Report 05000382/2013001) IR 05000382/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-13-006) IR 05000382/20128012013-03-0404 March 2013 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382-12-801) IR 05000382/20120062012-09-0404 September 2012 IR 05000382-12-006, on 08/16/2012, Mid-Cycle Assessment Letter for Waterford Steam Electric Station - Unit 3, Inspection Plan IR 05000382/20120012012-03-0505 March 2012 Annual Assessment Letter for Waterford Steam Electric Station-Unit 3 (Report 05000382-12-001) ML1124403602011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Waterford Steam Electric Station, Unit 3 2023-09-14
[Table view] Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] |
Text
UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N rch 4, 2009
SUBJECT:
ANNUAL ASSESSMENT LETTER - WATERFORD STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000382/2009001)
Dear Mr. Walsh:
On February 10, 2009, the NRC staff completed its performance review of Waterford Steam Electric Station, Unit 3. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.
Overall, Waterford Steam Electric Station, Unit 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.
The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Entergy Operations, Inc. -2-If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8147 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Jeffrey A. Clark, P.E.
Chief, Reactor Projects Branch E Division of Reactor Projects Docket No. 50-382 License No. NPF-38 Enclosure: Waterford 3 Inspection/Activity Plan cc w/Enclosure: Director Senior Vice President Nuclear Safety Assurance Entergy Nuclear Operations Entergy Operations, Inc.
P.O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70057-0751 Senior Vice President and General Manager, Plant Operations Chief Operating Officer Waterford 3 SES Entergy Operations, Inc. Entergy Operations, Inc.
P.O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70057-0751 Vice President, Operations Support Manager, Licensing Entergy Services, Inc. Entergy Operations, Inc.
P.O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70057-3093 Senior Manager, Nuclear Safety Chairman and Licensing Louisiana Public Service Commission Entergy Services, Inc. P.O. Box 91154 P.O. Box 31995 Baton Rouge, LA 70821-9154 Jackson, MS 39286-1995 Parish President Council Site Vice President St. Charles Parish Waterford Steam Electric Station, Unit 3 P.O. Box 302 Entergy Operations, Inc. Hahnville, LA 70057 17265 River Road Killona, LA 70057-0751 Director, Nuclear Safety & Licensing Entergy, Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Entergy Operations, Inc. -3-Senator Joel T. Chaisson, II Louisiana Department of Environmental State of Louisiana, District 19 Quality, Radiological Emergency Planning P.O. Box 1255 and Response Division Destrehan, LA 70047 P.O. Box 4312 Baton Rouge, LA 70821-4312 Tab Troxler, Director St. Charles Parish Department Federal Emergency Management Agency of Emergency Preparedness ATTN: William E. Peterson, Regional P.O. Box 302 Director Hahnville, LA 70057 Region VI FRC 800 North Loop 288 Lance Marino, Councilman-at-Large Denton, TX 76209-3698 St. Charles Parish Division A 660 Pine Street Col. Jeff Smith, Acting Director Norco, LA 70079 Louisiana Office of Homeland Security and Emergency Preparedness Clayton "Snookie" Faucheux 7667 Independence Blvd. Councilman-at-Large Baton Rouge, LA 70806 St. Charles Parish Division B 140 North Oak Court Jeffrey P. Meyers, Division Administrator P.O. Box 1342 Emergency and Radiological Services Luling, LA 70070 Division Louisiana Department of Environmental Desmond J. Hilaire, Councilman Quality St. Charles Parish District 1 P.O. Box 4312 P.O. Box 111 Baton Rouge, LA 70821-4312 Hahnville, LA 70057 Albert D. Laque, Parish President Brian A. Fabre, Councilman St. Charles Parish St. Charles Parish District 2 P.O. Box 302 322 Beaupre Drive Hahnville, LA 70057 Luling, LA 70070 Sheriff Greg Champagne G. ARam@ Ramchandran, Councilman St. Charles Parish Sheriff=s Office St. Charles Parish District 3 P.O. Box 7 13 Hermitage Court Hahnville, LA 70057 Destrehan, LA 70047 Rep. Gary L. Smith, Jr. Derryl Walls, Councilman State of Louisiana, District 56 St. Charles Parish District 4 P.O. Box 189 P.O. Box 721 Norco, LA 70079 Des Allemands, LA 70030 Rep. Ernest D. Wooten April Black, Councilwoman State of Louisiana, District 105 St. Charles Parish District 5 8018 Highway 23, Suite 214 162 Oak Manor Lane Belle Chasse, LA 70037 St. Rose, LA 70087
Entergy Operations, Inc. -4-Richard ADickie@ Duhe, Councilman Paul Oncale, Public Safety Director St. Charles Parish District 6 St. John the Baptist Parish 401 Oak Street 1801 W. Airline Highway Norco, LA 70079 LaPlace, LA 70068 Barry Minnich, Councilman Sheriff Wayne Jones St. Charles Parish District 7 St. John the Baptist Parish 337 Wanda Street P.O. Box 1600 Luling, LA 70070 Chief, Technological Hazards Nickie Monica, Parish President Branch St. John the Baptist Parish FEMA Region VI Paul Oncale, Public Safety Director 800 North Loop 288 Federal Regional Center Denton, TX 76209
Entergy Operations, Inc. -5-Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.goV)
DRP Director (Roy.Caniano@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Ray Azua@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (Douglas.Bollock@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lucy.Owen@nrc.gov)
DRA Secretary (Judy.Kilcrease@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/OB (Bernard.Stapleton@nrc.gov)
OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)
OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)
OEDO, TRPS (Tamara.Bloomer@nrc.gov)
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)
Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov mortensengk@INPO.org File located:R:\_REACTORS\EOC\EOC Assessment Letters\2008\WAT.doc SUNSI Rev Compl. 7 Yes No ADAMS 7 Yes No Reviewer Initials DRB Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials DRB RIV/SPE/DRP/ C:DRP/E D:DRS D:DRP C:DRP/Signature DRBollock JAClark RJCaniano DDChamberlain JAClark
/RA/ /RA/ /RA/ /RA/ /RA/
2/20/2009 2/20/2009 2/20/2009 2/23/2009 3/2/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Page 1 of 2 Waterford 02/23/2009 12:43:18 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RPTEAM - RADIATION SAFETY TEAM INSPECTION 4 3 03/02/2009 03/06/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3 03/02/2009 03/06/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 3 03/02/2009 03/06/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3 03/02/2009 03/06/2009 IP 7112202 Radioactive Material Processing and Transportation 3 03/02/2009 03/06/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program EB2-05T - TRIENNIAL FIRE PROTECTION 4 3 04/13/2009 04/17/2009 IP 7111105T Fire Protection [Triennial]
3 04/27/2009 05/01/2009 IP 7111105T Fire Protection [Triennial]
EP1 - EP EXERCISE INSPECTION 4 3 06/22/2009 06/26/2009 IP 7111401 Exercise Evaluation 3 06/22/2009 06/26/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 06/22/2009 06/26/2009 IP 71151 Performance Indicator Verification REQUAL - BIENNIAL REQUAL INSPECTION 3 3 07/13/2009 07/17/2009 IP 7111111B Licensed Operator Requalification Program EB1-21 - CDBI 6 3 08/10/2009 08/14/2009 IP 7111121 Component Design Bases Inspection 3 08/24/2009 08/28/2009 IP 7111121 Component Design Bases Inspection 3 09/07/2009 09/18/2009 IP 7111121 Component Design Bases Inspection RP-ORS4 - OCCUPATIONAL RADIATION SAFETY 1 3 09/14/2009 09/18/2009 IP 7112101 Access Control to Radiologically Significant Areas 3 09/14/2009 09/18/2009 IP 7112102 ALARA Planning and Controls 3 09/14/2009 09/18/2009 IP 71151 Performance Indicator Verification EXAM - INITIAL EXAM 3 3 09/14/2009 09/18/2009 X02418 INITIAL EXAM-W3 (10/2009)
3 10/05/2009 10/09/2009 X02418 INITIAL EXAM-W3 (10/2009)
EB1-08P - INSERVICE INSPECTION 2 3 11/02/2009 11/23/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 3 11/02/2009 11/23/2009 IP 7111108P Inservice Inspection Activities - PWR RP-ORS5 - OCCUPATIONAL RADIATION SAFETY - ACCESS 1 3 11/16/2009 11/20/2009 IP 7112101 Access Control to Radiologically Significant Areas 3 11/16/2009 11/20/2009 IP 7112102 ALARA Planning and Controls 3 11/16/2009 11/20/2009 IP 71151 Performance Indicator Verification PSB2-52B - BIENNIAL PI&R 4 3 05/10/2010 05/14/2010 IP 71152B Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Waterford 02/23/2009 12:43:18 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB2-52B - BIENNIAL PI&R 4 3 05/24/2010 05/28/2010 IP 71152B Identification and Resolution of Problems EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 3 06/28/2010 07/02/2010 IP 7111402 Alert and Notification System Testing 3 06/28/2010 07/02/2010 IP 7111403 Emergency Response Organization Augmentation Testing 3 06/28/2010 07/02/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 06/28/2010 07/02/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3 06/28/2010 07/02/2010 IP 71151-EP01 Drill/Exercise Performance 3 06/28/2010 07/02/2010 IP 71151-EP02 ERO Drill Participation 3 06/28/2010 07/02/2010 IP 71151-EP03 Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.