Forwards Safety Evaulation Re First 10-yr Interval Inservice Insp Relief Request for Plant,Unit 3
ML20195J809
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/17/1999
From: Gramm R
NRC (Affiliation Not Assigned)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20195J816 List:
References
TAC-MA1615, NUDOCS 9906210132
Download: ML20195J809 (5)


Text

~

(Ili, k.

~

l dune l17,- 1999 -  ;

I Mr. Charles M.' Dugger -

i Vice President Operations i

Entergy Operations, Inc.

~

P. O. Box B - .

^

Killona, LA 70066

SUBJECT:

EVALUATION OF THE FIRST 10-YEAR INTERVAL INSERVICE

. INSPECTION RELIEF REQUEST FOR WATERFORD STEAM ELECTRIC I STATION, UNIT 3 (TAC NO. MA1615) l L

Dear Mr. Dugger:

By' letter dated January 27,1998, Entergy Operations, Inc. (EOl, or licensee), submitted a -

request for relief (RR ISI-001) from inservice inspection requirements of American Society of - j Mechanical Engineers,Section XI for Waterford Steam Electric Station, Unit 3 (Waterford 3).

On March 22,1999 EDI submitted additional information that was omitted from its original submittal on January 27,1998.

The staff, with technical assistance from its contractor, the Idaho National Engineering and  !

Environmental Laboratory (INEEL), has reviewed and evaluated the information provided in the ,

submittals. Based on the review of EOl's information and the recommendations from the contractor, the staff concludes that relief may be granted pursuant to Title 10 of the Code of .

Federal Reaulations. Section 50.55a(g)(6)(i) for RR ISI-001, Revision 7, Parts A, B, C, D, E, and F for the first 10-year interval. The relief granted is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest. In making this determination, the staff has r.onsidered the burden on the licensee if the l requirements were imposed on the fraaty.

The staff's evaluation and conclusions are contained in Enclosure 1. Enclosure 2 is INEEL's Technical Letter Report.

Sincerely, ORIG. SIGNED BU Robert A. Gramm, Chief, Section 1 /

Project Directorate IV & Opcommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382 f

Enclosures:

As stated (2) hhhh I cc w/encia: See next page DISTRIBUTION (Othhet PileM S.Richards (cover ltr only)

Enclosures:

As stated (2) c p# PUBLIC RScholl(e-mail SE only) i _ .d PDIV-1 RF MSatorius, EDO

'cc w/encls:. See next page *~ KBrockman, RIV GHill(2)

OGC ACRS

. DOCUMENT NAME: G:\PDIV-1\WATERFoRD\ RELA 1615.WPD *sEE PREVIOUS CONCURRENCE To receive com of document, indicate in box: C= Copy w/o enci E= Copy w/enct N=No copy 0FFICE PM/PDIV-1 _

E LA/PDIV-1 .

E OGC* N SC/PDIV-1 E NAME CPete).db LBorry f SUtaL RGramm b DATE- 6/4/99 6/[/99 5/26/99 6/h j 99062'10132 990617 I  ;

i PDR ADOCK 05000382 '

P PM y

[ ;..

June 3,1999 Mr. Charles M. Dugger Vice President Operations Entergy Operations, Inc.

P. O. Box B -

' Kilions, L.A 70066

~

SUBJECT:

EVALUATION OF THE FIRST 10-YEAR INTERVAL INSERVICE INSPECTION RELIEF REQUEST FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. MA1815)

Dear.Mr. Dugger.

By letter dated January 27,1998, Entergy Operations, Inc. (EOl or licensee), submitted a request for relief (RR ISI-001) from inservice inspection requirements of American Society of Mechanical Engineers,Section XI for Waterford Steam Electric Station, Unit 3 (Waterford 3).

On March 22,1999, EOl submitted additional information that was omitted from its original submittal on January 27,'1998. -

The staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided in the submittals. Based on the review of EOl's information and the recommendations from the contractor, the staff concludes that relief may be granted pursuant to Title 10 of the Code of Federal Reaulations. Section 50.55a(g)(6)(i) for RR 1S1-001, Revision 7, Parts A, B, C, D, E, and F for the first 10-year interval. The relief granted is authorized by law and will not endanger l life or property, or the common defense and security, and is otherwise in the public interest. In making this determination, the staff has considered the burden on the licensee if the requirements were imposed on the facility.

The staff's evaluation and conc!usions are contained in Enclosure 1. Enclosure 2 is INEEL's Technical Letter Report.

Sincerely,

/S/

Robeit A. Gramm, Chief, Section 1 6ct Directorate IV & Decommissioning Pro)ision Div of Licensing Project Managementi; Office of Nuclear Reactor Regulation i Docket No. 50-382 i

Enclosures:

As stated (2)

/

cc w/encls: See next page DISTRIBUTION Oocket File S.Richards (coveritr only)

Enclosures:

As stated (2) ' PUBLIC RScholl(e-mail SE only)

PDIV-1 RF MSatorius, EDO cc w/encis: See next page GHill(2) KBrockman, RIV ' '

OGC ACRS

' DOCUMENT NAME: 0:\PDIV-1\WATERFORDWtE 1618.WPD *sEE PREvlous CONCURRENCE To receive co w of document, indicate in box: C= Copy w/o enct E= Copy w/enci N=No copy 0FFCE PM/PDIV-1 ' E LA/PDIh 1 E oGC* SC/PDIV-1 E f#ME - CPatel:db LBerrh sutal RGramm DATE h ' '

5/26/99 K V OFFICIAL RECORD COPY

, ,J',.~.+;. .

.7 ..

Mr. Charles M. Dugger

  • . '2 J ,Vice President Operations Ent:rgy Oper!.tions, Inc.

P. O. Box B Killona, LA 70066

SUBJECT:

, EVALUATION OF THE FIRST 10-YEAR INTERVAL INSERVICE INSPECTION RELIEF REQUEST FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. MA1615)

Dear Mr. Dugger.

. By letter dated January 27,1998, Entergy Operations, Inc. (EOl), submitted a request for reliefs (RR ISl-001) from inservice inspection requirements of American Society of Mechanical .'

Engineers,Section XI for Waterford Steam Electric Station, Unit 3 (Waterford 3). On March 22, 1999, EOl submitted additional information that was omitted from its original submittal on -

January 27,1998.

The staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided in the submittals. Based on the review of EOl's information and the recommendations from the contractor, the staff concludes that relief may be granted pursuant to Title 10 of the Code of i Federal Reaulations._Section 50.55a(g)(6)(i) for RR ISl-001, Revision 7, Parts A, B, C, D, E, and F for the first 10-year interval. The relief granted is authorized by law'and will not endanger )

life or property, or the common defense and security, and is otherwiseJri the public interest. In making this determination, the staff has considered the burden on the' licensee if the requirements were imposed on the facility.

i The staff's evaluation and conclusions are contained in Enclosure 1. Enclosure 2 is INEEL's Technical Letter Report. ,/

Sincerely, Robert A ramm, Chief, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

/

Docket No. 50-382 DISTRIBUTION

. Docket File S.Richards (cover ltr only)

Enclosures:

As stated (2) ' PUBLt . ' CNorsworthy (e-mail SE only)

PDIV-1 RF MSatorius, EDO cc w/encis: See next page GHill(2) KBrockman, RIV

, OGC ACRS

/

DOCUMENT NAME: A:\WATERFRD\ RELA 1615.WPD l

To receive copy of documente indicate in box: C= Copy w/o encl E= Copy w/enci N=No copy l OFFICE PM/PDIV-1 N Lh/PDIV-1; n E O G Q ,. 1A h SC/PDIV-1 E NAME CPatel:db ' LBerry .Ih Nb RGramm '

DATE f/ j f /99 h/ /99 [/ 6 /99 / /99 OFFICIAL RECORD COPY b b M

r .. - a .- - . . ~ . - - . - - - . - . - - -

[. .

' UNITED STATE 8 s* ~ NUCLEAR REGULATORY COMMISSION

  1. WASHINGTON, D.C. 20086 0001

% t*

June 17, 1999

~

Mr. Charles M. Dugger Vice President Operations Entergy Operations, Inc.

P. O. Box B Killona, LA 70066

SUBJECT:

~ EVALUATION OF THE FIRST 10-YEAR INTERVAL INSERVICE INSPECTION RELIEF REQUEST FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. MA1615)

Dear Mr. Dugger.

By letter dated January 27,1998, Entergy Operations, Inc. (EOl or licensee), submitted a request for relief (RR 1S1-001) from inservice inspection requirements of American Society of Mechanical Engineers,Section XI for Waterford Steam Electric Station, Unit 3 (Waterford 3).

On March 22,1999, EOl submitted additional information that was omitted from its original submittal on January 27,1998.

. The staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided in the submittals. Based on the review of EOl's information and the recommendations from the contractor, the staff concludes that relief may be granted pursuant to Title 10 of the Code of Federal Regulations. Section 50.55a(g)(6)(i) for RR 1S1-001, Revision 7, Parts A, B, C, D, E, - l and F for the first 10-year interval. The relief granted is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest. In

. making this determination, the staff has considered the burden on the licensee if the requirements were imposed on the facility.

1 The staff's evaluation and conclusions are contained in Enclosure 1. Enclosure 2 is INEEL's Technical Letter Report.

Sincerely, k de Robert A. Gramm, Chief, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382 '

Enclosures:

As stated (2) cc w/encis: See next page

{

l i

l

_ _ . . , . _ . . . - , _._ _ . _ ~ ~ - _ . - _ _ ~ . . . , _ _ _ . . _ . _ _ . -

~

Waterford Generating Gtation 3 cc:

i Administrator Regional Administrator, Region IV Louisiana Radiation Protection Division U.S. Nusear Regulatry Commission Post Office Box 82135 611 Ryan Plaza Drivt,0uite 1000 Baton Rouge, LA 70884 2135 Arlington, TX 76011 Vice President, Operations' Resident inspectorMfaterford NPS Support Post Office Box 822 Entergy Operations, Inc. Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 f Nuclear Safety & Regulatory Affairs Hahnville, LA 70057 '

Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA 70066 and Chief Operating Officer ,

Entergy Operations, Inc.  !

Wise, Carter, Child & Carawsy P. O. Box 31995 P. O. Box 651 Jackson, MS 39286-1995 f Jackson, MS 39205 Chairman General M& nager Plant Operations Louisiana Public Service Commission Entergy Oper*%ne, Inc. One American Place, Suite 1630  !

P.O.BoxC Baton Rouge, LA 70825-1697  !