Text
_
..%,,
OCT 2 31990
-
.
,
Docket No.:
50-382/90-22
License No.:
Entergy Operations, Inc.
ATTN:
R. P. Barkhurst
Vice President, Operations
P.O. Box B
Killona, Louisiana 70066
Gentlemen:
This refers to the inspection conducted by Messrs. W. F. Smith and S. D. Butler
-
of this office during the period September 5 through October 1, 1990, of
activities authorized by NRC Operating License NPF-38 for Waterford Steam
Electr .'c Station, Unit 3, and to the discussion of our findings with
Mr. J. R. McGaha and other members of your staf f at the conclusion of the
inspection.
Areas examined during the inspection included onsite followup of events,
monthly maintenance observation, monthly surveillance observation, operational
safety verification, followup of previously identified items, licensee event
report followup, and engineered safety feature system walkdown.
Within these
areas, the inspection consisted of selective examination of procedures and
'
representative records, interviews with personnel, and observations by the
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2. Title 10, Code of
'
Federal Regulations.- Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
A weakness in the area of postmaintenance testing was identified while the
inspector was observing maintenance on an atmocpheric steam dump valve.
A
surveillance test was specified that was not suitable for the existing plant
conditions (i.e. , a cold shutdown test was specified Phile the plant was at
full power).
Even_though the shift supervisor caught the error before
authorizing the work to start, the resultant delay unnecessarily prolonged the
-safety equipment outage.- Problems continue to be identified in the area of
postmaintenance and postmodification testing.
A Notice of Violation was issued
on August 1, 1990 (NRC Inspection Report 50-382/90-15), citing similar
circumstances for a postmodification test.
Since your corrective actions have
not been fully implemented, an additional Notice of Violation is not being
issued.
Based on discussions with the General Manager, Nuclear Operations, we
understand that the corrective actions for the previous violation will include
,'
imp
ements in the areas of postmaintenance, as well as, ostmodification
RI\\
SR
OPR/
C:DRP h k
- RPp
0
'
-
l
WFS 1
PHH '
TFWes'Mftf
[f/JCollins
k
/
/ /9
$/d/90
\\0/g1/90
() /0/2$/90
/fV
/V.
p%C30009590 ora
Y L(I
o'
- 0Ck 03000382
,
i
'
,o
. .
'
.
Entergy Operations, Inc.
-2-
testing. Details on this issue are discussed in paragraph 4.b of the enclosed
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 7 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
OflDnalSW By:
i
Thomas P.Gwynn
j
Samuel J. Collins, Director
'
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/90-22
,
I
'
cc w/ enclosures:
'
Entergy Operations, Inc.
ATTN: Donald C. Hintz, Executive Vice
President & Chief Operating Officer
l
P.O. Box 31995
'
Jackson, Mississippi 39286
Enterly Operations, Inc.
ATTN: Gerald W, Muench, Vice President
Operations Support
P.O. lox 31995
Jackson, Mississippi
39286
Wise, arter, Child & Caraway
ATIN: Robert B. McGehee, Esq.
P.O. Box 651
Jackson,' Mississippi
39205
.
1
Entergy Operations, Inc.
l
ATTN:
J. R. McGaha, Jr. , General
'
Manager Plant Operations
P.O. Box B
i
Killona, Louisiana 70066
l
.
..
,
-
.
..
..
'..
j
..
-
.
Entergy Operations, Inc.
-3-
Entergy Operations, Inc.
ATTN:
J. G. Dewease, Senior Vice
President, Planning & Assurance
i
P.O. Box 31995
Jackson, Mississippi
39286-1995
.
Entergy Operations, Inc.
ATTN:
L. W. Laughlin, Site
Licensing Support Supervisor
P.O. Box B
K111ona, Louisiana 70066
Monroe & Leman
'
ATTN:
W. Malcolm Stevenson, Esq.
!
201 St. Charles Avenue, Suite 3300
New Orleans, Louisiana 70170-3300
Shaw, Pittman, Potts & Trowbridge
ATTN: Mr. E. Blake
2300 N Street, NW
Washington, D.C.
20037
Chairman
Louisiana Public Service Commission
One A,merican Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Entergy Operations, Inc.
ATTN: _ R. F. Burski, Director
Nuclear Safety
317 Baronne Street
New Orleans, Louisiana 70112
.
Department of Environmental Quality
ATTN: Glenn Miller,- Administrator
Radiation Protection Division
P.O. Box 14690
Baton Rouge, Louisiana 70898
President, Parish Council
,
.St. Charles Parish
Hahnv111e. Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
-3 Metro Center
' Suite 610
Bethesda, Maryland 20814
l
,
.
,
~
- ,
t.
.1
..
c
.
,
3,
Entergy. Operations, Inc.
-4-
p
m
bec to DMB (IE01)
E
E
bec distrib. by RIV:
- R. D. Martin ~
- Resident Inspector
,
- Section Chief (DRP/A)
- DRP
- DRSS-FRPS
- MIS System
- Project Engineer (DRP/A)
'RSTS Dperator
- RIV File
'DRS
c
- D. Wigginton, NRR Project Manager (MS:
13-D-18)
Lisa Shea, RM/ALF
w/766
-
,
t
3
t
,
b
t
c.
- t
-
a
.f
!
'
5
4
s'
W
i
'
f.r
'
i
s a:
,
-
,
<
0
)a
t
'
'
,m.m
, _ -. ' -,, ,,
- -
e,,,-
,
,