ML20058B310

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/90-22 on 900905-1001 & Notice of Violation
ML20058B310
Person / Time
Site: Waterford 
Issue date: 10/23/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Barkhurst R
ENTERGY OPERATIONS, INC.
Shared Package
ML20058B313 List:
References
NUDOCS 9010300095
Download: ML20058B310 (4)


See also: IR 05000382/1990022

Text

_

..%,,

OCT 2 31990

-

.

,

Docket No.:

50-382/90-22

License No.:

NPF-38

Entergy Operations, Inc.

ATTN:

R. P. Barkhurst

Vice President, Operations

P.O. Box B

Killona, Louisiana 70066

Gentlemen:

This refers to the inspection conducted by Messrs. W. F. Smith and S. D. Butler

-

of this office during the period September 5 through October 1, 1990, of

activities authorized by NRC Operating License NPF-38 for Waterford Steam

Electr .'c Station, Unit 3, and to the discussion of our findings with

Mr. J. R. McGaha and other members of your staf f at the conclusion of the

inspection.

Areas examined during the inspection included onsite followup of events,

monthly maintenance observation, monthly surveillance observation, operational

safety verification, followup of previously identified items, licensee event

report followup, and engineered safety feature system walkdown.

Within these

areas, the inspection consisted of selective examination of procedures and

'

representative records, interviews with personnel, and observations by the

inspectors.

The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2. Title 10, Code of

'

Federal Regulations.- Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

A weakness in the area of postmaintenance testing was identified while the

inspector was observing maintenance on an atmocpheric steam dump valve.

A

surveillance test was specified that was not suitable for the existing plant

conditions (i.e. , a cold shutdown test was specified Phile the plant was at

full power).

Even_though the shift supervisor caught the error before

authorizing the work to start, the resultant delay unnecessarily prolonged the

-safety equipment outage.- Problems continue to be identified in the area of

postmaintenance and postmodification testing.

A Notice of Violation was issued

on August 1, 1990 (NRC Inspection Report 50-382/90-15), citing similar

circumstances for a postmodification test.

Since your corrective actions have

not been fully implemented, an additional Notice of Violation is not being

issued.

Based on discussions with the General Manager, Nuclear Operations, we

understand that the corrective actions for the previous violation will include

,'

imp

ements in the areas of postmaintenance, as well as, ostmodification

RI\\

SR

OPR/

C:DRP h k

RPp

0

'

-

l

SDE

WFS 1

PHH '

TFWes'Mftf

[f/JCollins

k

/

/ /9

$/d/90

\\0/g1/90

() /0/2$/90

/fV

/V.

p%C30009590 ora

Y L(I

o'

  • 0Ck 03000382

,

PDC

i

'

,o

. .

'

.

Entergy Operations, Inc.

-2-

testing. Details on this issue are discussed in paragraph 4.b of the enclosed

report.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 7 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

OflDnalSW By:

i

Thomas P.Gwynn

j

Samuel J. Collins, Director

'

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-382/90-22

,

I

'

cc w/ enclosures:

'

Entergy Operations, Inc.

ATTN: Donald C. Hintz, Executive Vice

President & Chief Operating Officer

l

P.O. Box 31995

'

Jackson, Mississippi 39286

Enterly Operations, Inc.

ATTN: Gerald W, Muench, Vice President

Operations Support

P.O. lox 31995

Jackson, Mississippi

39286

Wise, arter, Child & Caraway

ATIN: Robert B. McGehee, Esq.

P.O. Box 651

Jackson,' Mississippi

39205

.

1

Entergy Operations, Inc.

l

ATTN:

J. R. McGaha, Jr. , General

'

Manager Plant Operations

P.O. Box B

i

Killona, Louisiana 70066

l

.

..

,

-

.

..

..

'..

j

..

-

.

Entergy Operations, Inc.

-3-

Entergy Operations, Inc.

ATTN:

J. G. Dewease, Senior Vice

President, Planning & Assurance

i

P.O. Box 31995

Jackson, Mississippi

39286-1995

.

Entergy Operations, Inc.

ATTN:

L. W. Laughlin, Site

Licensing Support Supervisor

P.O. Box B

K111ona, Louisiana 70066

Monroe & Leman

'

ATTN:

W. Malcolm Stevenson, Esq.

!

201 St. Charles Avenue, Suite 3300

New Orleans, Louisiana 70170-3300

Shaw, Pittman, Potts & Trowbridge

ATTN: Mr. E. Blake

2300 N Street, NW

Washington, D.C.

20037

Chairman

Louisiana Public Service Commission

One A,merican Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Entergy Operations, Inc.

ATTN: _ R. F. Burski, Director

Nuclear Safety

317 Baronne Street

New Orleans, Louisiana 70112

.

Department of Environmental Quality

ATTN: Glenn Miller,- Administrator

Radiation Protection Division

P.O. Box 14690

Baton Rouge, Louisiana 70898

President, Parish Council

,

.St. Charles Parish

Hahnv111e. Louisiana 70057

Mr. William A. Cross

Bethesda Licensing Office

-3 Metro Center

' Suite 610

Bethesda, Maryland 20814

l

,

.

,

~

,

t.

.1

..

c

.

,

3,

Entergy. Operations, Inc.

-4-

p

m

bec to DMB (IE01)

E

E

bec distrib. by RIV:

  • R. D. Martin ~
  • Resident Inspector

,

  • Section Chief (DRP/A)
  • DRP
  • DRSS-FRPS
  • MIS System
  • Project Engineer (DRP/A)

'RSTS Dperator

  • RIV File

'DRS

c

  • D. Wigginton, NRR Project Manager (MS:

13-D-18)

Lisa Shea, RM/ALF

w/766

-

,

t

3

t

,

b

t

c.

- t

-

a

.f

!

'

5

4

s'

W

i

'

f.r

'

i

s a:

,

-

,

<

0

)a

t

'

'

,m.m

, _ -. ' -,, ,,

  1. -

e,,,-

,

,