Text
1
m
.e
" ** %c
UNITED STATES
3
&
NUCLEAR REGULATORY COMMISSION
.
1
7,
a
REGloN IV
611 RYAN PLAZA DRIVE, sulTE 400
4
ARLINGTON, TEXAS 76011-8064
y g
May 3,1999
.
Charles M. Dugger, Vice President
Operations - Waterford 3
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-08 AND NOTICE OF VIOLATION
Dear Mr. Dugger:
This refers to the inspection conducted on April 5-7,1999, at the Waterford Steam Electric
Station, Unit 3 facility. The purpose of the inspection was to follow up on the access
authorization event that your staff reported on March 23,1999. The enclosed report presents
the results of this inspection. A telephonic exit meeting was conducted with members of your
staff on April 22,1999.
Based on the results of this inspection, one apparent violation was identified and is being
considered for escalated enforcement action in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600.
The apparent violation involved the failure to review and consider derogatory access
i
authorization background information as required by the physical security plan and your
i
procedure. As a result, an individual, who would not have been granted access, was
erroneously granted temporary unescorted access for a period of approximately 30 days as
i
discussed in Section S1.1 of the enclosed report. The circumstances surrounding the apparent
violation, the significance of the issue, and the need for lasting and effective corrective action
I
were discussed with members of your staff at the inspection exit meeting on April 7,1999, and
!
the telephonic exit meeting on April 22,1999. As a result, it may not be necessary to conduct a
predecisional enforcement conference in order to enable the NRC to make an enforcement
decision.
In addition, since you identified the violation and based on our understanding of your corrective
actions as discussed in the enclosed report, a civil penalty may not be warranted in accordance
with Section VI.B.2 of the Enforcement Policy. The final decision will be based on your
f
confirming on the license docket that the corrective actions previously described to the staff
have been or are being taken.
6
l
Before the NRC makes its enforcement decision, we are providing you an opportunity to either
j
(1) respond to the apparent violation addressed in this inspection report within 30 days of the
I
date of this letter or (2) request a predecisional enforcement conference. If a conference is
held, it will be open for public observation. The NRC will also issue a press release to
announce the conference. Please contact Ms. Gail M. Good at (817) 860-8215 within 7 days of
,
the date of this letter to notify the NRC of your intended response.
f
9905060138 990503
ADOCK 05000382
i
G
j
,
.-
.
- Entergy Operations, Inc.
-2-
Your response should be clearly marked as a " Response to an Apparent Violation in inspection
' Report 50-382/99-08" and should include for the apparent violation: (1) the reason for the
apparent violation, or, if contested, the basis for disputing the apparent violation; (2) the
corrective steps that have been taken and the results achieved; (3) the corrective steps that will
be taken to avoid further violations; and (4) the date when full compliance will be achieved.
Your response should be submitted under oath or affirmation and may reference or include
previous docketed correspondence, if the correspondence adequately addresses the required
response. If an adequate response is not received within the time specified or an extension of
time has not been granted by the NRC, the NRC will proceed with its enforcement decision or
schedule a predecisional enforcement conference.
In addition, please be advised that the number and characterization of the apparent violation
described in the enclosed inspection report may change as a result of further NRC review. You
will be advised by separate correspondence of the results of our deliberations on this matter.
Based on the results of this inspection, the NRC has also determined that one Severity Level IV
violation of NRC requirements occurred. This violation is being treated as a non-cited violation
(NCV) consistent with Appendix C of the Enforcement Policy. The NCV is described in
Section S3.1 of the subject inspection report. If you contest the violation or severity level of the
NCV, you should provide a response within 30 days of the date of this inspection report with the
basis for your denial to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001 with copies to the Regional Administrator, Region IV; the Director,
Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-
0001; and the NRC Resident inspector at the Waterford-3 facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
Document Room (PDR)._ To the extent possible, your response should not include any personal
privacy, proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
Sinc
y,
rthur T. How , Directo
Division of Re ctor Safety
Docket No.:
50-382
License No.: NPF-38
Enclosure:
NRC Inspection Report No.
50-382/99-08-
j
p
.-
.,
Entergy Operations, Inc.
-3
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.-
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President, Operations Support
- Entergy Operations, Inc.
P.O. Box 31995
-Jackson, Mississippi 39286-1995
W;se, Carter, Child & Caraway
P.O. Box 651 '
' Jackson, Mississippi 39205
General Manager, Plant Operations
- Waterford 3 SES
Entergy Operations, Inc.
P.O. Boy. B
.Killena, Louisiana 70066
Manager - Licensing Manager
. Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Ronald Wascom, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
'
i
'
i
l
i
r-
..
- a
Entergy Operations, Inc.
-4-
1
Parish President
St. Charles Parish
P.O.- Box 302
Hahnville, Louisiana 70057
1
Winston & Strawn
1400 L Street, N.Wi
i
Washington, D.C. : 20005-3502
. -
I
!
F
,
a
9
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL) ..
- E-Mail report to NRR Event Tracking System (IPAS)
' E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE04)
bec distrib. by RIV:
Regional Adrninistrator
Wat-3 Resident inspector
DRP Director .
DRS-PSB
DRS Director
.
MIS System
Branch Chief (DRP/D)
RIV File
J
Project Engineer (DRP/D)
G. F. Sanborn, EO
Branch Chief (DRP/TSS)
W. L. Brown, RC
'J. Lieberman, OE, (MS: '7-H5)
OE:EA File (MS: 7-H5) .
,
,
DOCUMENT NAME: R:\\_WT\\WT908RP.ABE.WPD
-
3
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures 'N" = No copy
RIV:PSB
.5
C:DRS\\PSB
E
C:DRPM
ah EO NT
D:DRS,f)(
- k6 ABEarnest
- nh &
GMGood (MU Phar (e(W/ GFSkiM5th
ATHaWe(l)ll
04A4/99
04/M9
04/899 7 #
04/L999
041/99 '
'
OFFICIAL RE1@D COPY
L
l0
's
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE04)
bec distrib. by RIV:
Regional Administrator
Wat-3 Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/D)
RIV File
Project Engineer (DRP/D)
G. F. Sanborn, EO
1
Branch Chief (DRP/TSS)
W. L. Brown, RC
J. Lieberman, OE, (MS: 7-H5)
OE:EA File (MS: 7-HS)
.
0 GOO 39
-
DOCUMENT NAME: R:\\_.WTTWT908RP.ABE.WPD
p To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N* = No copy
p#'ni/)b
ABE
l -
RIV:PSB
J
C:DRS\\PSB
E
C:DRPA
M EO r[F l
D:DRS,/)(
M30
arnest:nh &
GMGood (M Phar (e(W/ GFSkido%
ATHaMe(l)ll
044h/99
04/f)9
044T99 7//
04/L999
041/99 '
'
'
OFFICIAL RETC$D COPY