ML20205J878
| ML20205J878 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/05/1999 |
| From: | Harrell P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20205J881 | List: |
| References | |
| 50-382-99-02, 50-382-99-2, NUDOCS 9904120227 | |
| Download: ML20205J878 (5) | |
See also: IR 05000382/1999002
Text
s
ep " "'*ue
UNITED STATES
y
\\
NUCLEAR REGULATORY COMMISSION
,
5
d
E
REGloN IV
611 HYAN PLAZA DRIVE, sulTE 400
,, ,,
ARLINGTON, TEXAS 76011-8064
APR
5 1999
Charles M. Dugger, Vice President
Operations - Waterford 3
Entergy Operations, Inc.
P.O. Box B
1
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-02
l
Dear Mr. Dugger:
)
1
Froin January 17 through February 27,1999, an inspection was conducted at your Waterford
Steam Electric Station, Unit 3, reactor facility. The enclosed report presents the scope and
results of that inspection.
t
During the 6-week period covered by this inspection, your conduct of activities at Waterford 3
was generally characterized by safety-conscious operations, sound engineering and
maintenance practices, and careful radiological controls.
Based on the results of this inspection, the NRC has determined that six violations occurred.
These violations involved the failure to: (1) protect redundant trains of the static uninterruptible
power supplies, (2) correct inaccurate information in the Updated Safety Analysis Report,
(3) perform adequate calculations to ensure containment building instrumentation was
adequately protected, (4) meet the Technical Specification allowed outage time for inoperable
hydrogen analyzers, (5) meet the Technical Specification allowed outage time for inoperable
feedwater isolation valves, and (6) provide adequate security lighting for temporary structures
inside the protected area. These violations are being treated as noncited violations (NCV)
consistent with Appendix C of the Enforcement Policy. The NCVs are described in the subject
inspection report. If you contest the violations or severity level of the NCVs, you should provide
a response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-
>
0001, with copies to the Regional Administrator, Region IV, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC *ublic Document Room.
.
9904120227 990405
ADOCK 05000382
G
pog
=
.,
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
7
. Harrell, Chief
Project Branch D
Division of Reactor Projects
Docket No.:
50-382
License No.: NPF-38
Enclosure:
NRC Inspection Report
50-382/99-02
cc w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississhpl 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
'
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
,
P.O. Box 651
1
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 7006ti
Manager - Licensing Manager
I
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066 '
I
'.
-
l. -
- ..
Entergy Operations, Inc.
-3-
I
I
Chairman .
..
_
.
{
l
l.
Louisiana Public Service Commission
- One American Place, Suite 1630
j
Baton Rouge, Louisiana 70825-1697
{
l.
Director, Nuclear Safety &
f
Regulatory Affairs .
'
-
- Waterford 3 SES 1
{
Entergy Operations, Inc.
. P.O. Box B '
Killona, Louisiana 70066
)
William H. Spell. Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
l
Parish President
i
St. Charles Parish
P.O. Box 302 -
Hahnville, Louisiana 70057
.
Winston & Strawn
1400 L Street, N.W.
. Washington, D.C. 20005-3502
t-
l
l
'?
$
APR
5 a:9
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
- Regional Administrator
Resident inspector
DRP Director
DRS-PSB
{
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
i
\\
k \\
l
1200U
DOCUMENT
ME: R:\\__WAT\\WT902RP.TRF
To receive copy L ocument, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosurqs *N" = No copy
RIV/fDnN DRS:MJDRS:EMB l
PE:DRP/D
l
RIV:S8l A
C:DRP/D
,
JMkeN @{& MF/funkagr RLNeas @ GWJohnstM TRP'arMM PHffrrig
'
,
3/11/9$7 4/ l'/97 Y
4/ l /99
4/ l /99
U
4/ 4S
T
4/6 W//
"\\
/
OFFICIAL RECORD COPY
I
[{
J
.
.
APR
S fggg
Entergy Operations, Inc.
-4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL) .
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Ch;ef (DRP/TSS)
l
l
!
!
,
DOCUMENT
ME: R:\\_WAEWT902RP.TRF
To receive copy 9g0 ocument, Indicate in tiox: "C" = Copy without enclosures "E" = Copy with en
RIV;All' nE DRS:MdDRS:EMB
PE:DRP/D
RIV:S 81 P
C:DRP/D l
JMkeet@ @a MFfunkaffr RLNeas @ GWJohnstM TRFIarMM PH$rrW
3/11/9MA" 4/ I /9 7 T
4/I /99
4/ l /99
U
4/6dl5 7
4/ 6 W //
,
\\
/
OFFICIAL RECORD COPY
I
//{