March 2, 2006
SUBJECT:
ANNUAL ASSESSMENT LETTER - WATERFORD 3 STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000382/2006001)
Dear Mr. Venable:
On February 8, 2006, the NRC staff completed its performance review of Waterford 3 Steam Electric Station. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.
Overall, Waterford 3 Steam Electric Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).
In addition, as part of the baseline inspection program, NRC will be conducting an inspection using Inspection Procedure 71150, Discrepant or Unreported Performance Indicator Data.
This inspection will be conducted to resolve a potential discrepancy related to reporting safety system unavailability for High Pressure Safety Injection Train B as described in the Assessment Follow-up Letter dated November 4, 2005.
The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.
Entergy Operations, Inc.
-2-In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8147 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
David N. Graves, Chief Project Branch E Division of Reactor Projects Docket: 50-382 License: NPF-38 Enclosure:
Waterford 3 Steam Electric Station Inspection/Activity Plan cc:
Federal Emergency Management Agency ATTN: William E. Peterson, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, TX 76201-3698 Col. Jeff Smith, Deputy Director Louisiana Office of Homeland Security and Emergency Preparedness 7667 Independence Blvd.
P.O. Box 44217 Baton Rouge, LA 70806 Jeffrey P. Meyers, Division Administrator Emergency and Radiological Services Division Louisiana Department of Environmental Quality P.O. Box 4312 Baton Rouge, LA 70821-4312 Albert D. Laque, Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Sheriff Greg Champagne St. Charles Parish Sheriffs Office P.O. Box 7 Hahnville, LA 70057 Rep. Gary L. Smith, Jr.
State of Louisiana, District 56 P.O. Box 189 Norco, LA 70079 Rep. Ernest D. Wooten State of Louisiana, District 105 8018 Highway 23, Suite 214 Belle Chasse, LA 70037 Senator Joel T. Chaisson, II State of Louisiana, District 19
Entergy Operations, Inc.
-3-P.O. Box 1255 Destrehan, LA 70047 Tab Troxler, Director St. Charles Parish Department of Emergency Preparedness P.O. Box 302 Hahnville, LA 70057 Lance Marino, Councilman-at-Large St. Charles Parish Division A 660 Pine Street Norco, LA 70079 Clayton "Snookie" Faucheux, Councilman-at-Large St. Charles Parish Division B 140 North Oak Court P.O. Box 1342 Luling, LA 70070 Desmond J. Hilaire, Councilman St. Charles Parish District 1 P.O. Box 111 Hahnville, LA 70057 Brian A. Fabre, Councilman St. Charles Parish District 2 322 Beaupre Drive Luling, LA 70070 G. Ram Ramchandran, Councilman St. Charles Parish District 3 13 Hermitage Court Destrehan, LA 70047 Derryl Walls, Councilman St. Charles Parish District 4 P.O. Box 721 Des Allemands, LA 70030 April Black, Councilwoman St. Charles Parish District 5 162 Oak Manor Lane St. Rose, LA 70087 Richard Dickie Duhe, Councilman St. Charles Parish District 6 401 Oak Street Norco, LA 70079 Barry Minnich, Councilman St. Charles Parish District 7 337 Wanda Street Luling, LA 70070 Nickie Monica, Parish President St. John the Baptist Parish 1801 West Airline Highway LaPlace, LA 70068 Paul Oncale, Public Safety Director St. John the Baptist Parish 1801 W. Airline Highway LaPlace, LA 70068 Sheriff Wayne Jones St. John the Baptist Parish 1801 W. Airline Highway LaPlace, LA 70068 Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
17265 River Road
Entergy Operations, Inc.
-4-Killona, LA 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Winston & Strawn LLP 1700 K Street, N.W.
Washington, DC 20006-3817 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Entergy Operations, Inc.
-5-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (MCH)
Branch Chief, DRP/E (DNG)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
V. Dricks, PAO (VLD)
W. Maier, RSLO (WAM)
C. Gordon (CJG)
DRS Branch Chiefs (JAC, ATG, LJS, MPS1)
T. Bergman, Chief, TRPS, OEDO (TAB)
S. Richards, Deputy Director, DIRS, NRR (SAR)
C. Holden, Deputy Director, DORL, NRR (CFH)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, LPLG, DORL, NRR (DXT)
M. Fields, NRR Project Manager for Waterford (MBF1)
RidsNrrDirslpab SUNSI Review Completed: _dng__ ADAMS: : Yes G No Initials: _dng__
- Publicly Available G Non-Publicly Available G Sensitive
- Non-Sensitive S:\\DRP\\DRPDIR\\EOC 05\\Assessment Letters\\WAT.wpd RIV:C:DRP/E D:DRS D:DRP C:DRP/E sign DNGraves;mjs DDChamberlain ATHowell III DNGraves VGGaddy for RJCaniano for
/RA/
/RA/
2/23/06 2/23/06 2/27/06 2/24/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Waterford Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2006 08:33:25 Report 22
EB2-52B
- W3 PIR INSPECTION Baseline Inspections 03/06/2006 03/10/2006
71152B IP Identification and Resolution of Problems Baseline Inspections 03/20/2006 03/24/2006
71152B IP Identification and Resolution of Problems
WAT71150
- DISCREPANT PI INSPECTION Baseline Inspections 03/06/2006 03/10/2006
71150 IP Discrepant or Unreported Performance Indicator Data
EB1-2/17
- 50.59 & PERMANENT PLANT MODS Baseline Inspections 06/05/2006 06/09/2006
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/05/2006 06/09/2006
7111117B IP Permanent Plant Modifications
RP-ORS
- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 06/19/2006 06/23/2006
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/19/2006 06/23/2006
7112102 IP ALARA Planning and Controls Baseline Inspections 06/19/2006 06/23/2006
71151 IP Performance Indicator Verification
OB-EP EX
- EMERG PREPAREDNESS EXERCISE Baseline Inspections 06/26/2006 06/30/2006
7111401 IP Exercise Evaluation Baseline Inspections 06/26/2006 06/30/2006
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/26/2006 06/30/2006
71151 IP Performance Indicator Verification
BRQ SIM
- BIENNIAL RQ SIM ONLY Baseline Inspections 07/17/2006 07/21/2006
7111111B IP Licensed Operator Requalification Program
EB2-05T
- TRIENNIAL FIRE PROTECTION Baseline Inspections 08/07/2006 08/11/2006
7111105T IP Fire Protection [Triennial]
Baseline Inspections 08/21/2006 08/25/2006
7111105T IP Fire Protection [Triennial]
EB2-07B
- HX PERFORMANCE Baseline Inspections 08/14/2006 08/21/2006
7111107B IP Heat Sink Performance
EB1-08P
- ISI Baseline Inspections 10/09/2006 10/13/2006
7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 10/23/2006 10/27/2006
7111108P IP Inservice Inspection Activities - PWR
RP-ORS
- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 10/16/2006 10/20/2006
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/16/2006 10/20/2006
7112102 IP ALARA Planning and Controls Baseline Inspections 10/16/2006 10/20/2006
71151 IP Performance Indicator Verification
EXAM
- INITIAL EXAM Not Applicable 10/16/2006 10/20/2006
X02295 WAT INITIAL EXAM (08/06)
OB-INIT
- INITIAL EXAM Not Applicable 10/16/2006 10/20/2006
X02295 WAT INITIAL EXAM (08/06)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Waterford Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2006 08:33:25 Report 22
EXAM
- INITIAL EXAM Not Applicable 11/13/2006 11/17/2006
X02295 WAT INITIAL EXAM (08/06)
OB-INIT
- INITIAL EXAM Not Applicable 11/13/2006 11/17/2006
X02295 WAT INITIAL EXAM (08/06)
EP2
- EMERG PREPAREDNESS PROGRAM INSPECTION Baseline Inspections 12/18/2006 12/22/2006
7111402 IP Alert and Notification System Testing Baseline Inspections 12/18/2006 12/22/2006
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 12/18/2006 12/22/2006
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/18/2006 12/22/2006
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 12/18/2006 12/22/2006
71151 IP Performance Indicator Verification
RP TEAM
- RADIATION SAFETY TEAM Baseline Inspections 02/12/2007 02/16/2007
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/12/2007 02/16/2007
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 02/12/2007 02/16/2007
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/12/2007 02/16/2007
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program
EB1-21
- CDB Baseline Inspections 03/05/2007 03/09/2007
7111121 IP Component Design Bases Inspection Baseline Inspections 03/19/2007 03/30/2007
7111121 IP Component Design Bases Inspection
EB2-12B
- MAINTENANCE RULE INPECTION Baseline Inspections 03/05/2007 03/09/2007
7111112B IP Maintenance Effectiveness
RP-ORS
- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 04/30/2007 05/04/2007
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/30/2007 05/04/2007
7112102 IP ALARA Planning and Controls Baseline Inspections 04/30/2007 05/04/2007
71151 IP Performance Indicator Verification
REQUAL
- BIENNIAL REQUALIFICATION Baseline Inspections 09/03/2007 09/07/2007
7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.