ML20207G344

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/99-09 on 990411-0522 & Notice of Violation.One Violation Identified & Being Treated as Noncited Violation C
ML20207G344
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/03/1999
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20207G350 List:
References
50-382-99-09, 50-382-99-9, NUDOCS 9906110118
Download: ML20207G344 (5)


See also: IR 05000382/1999009

Text

e

t.ma mach UNITED STATE 3

.

    • , NUCLEAR REGULATORY COMMISSION

$ o REGION IV

o,

'

611 RYAN PLAZA DRIVE, SUITE 400

4 8 ARLINGTON, TEXAS 76011-8064

.....

JUN - 31999

Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-09 AND NOTICE OF VIOLATION

Dear Mr. Dugger:

This refers to the inspection conducted on April 11 through May 22,1999, at the Waterford

Steam Electric Station, Unit 3, facility. The enclosed report presents the results of this

inspection.

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred. The violation is being treated as a noncited violation (NCV), consistent

with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection

report. If you contest the violation or severity level of the NCV, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement,

United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely

I

P. . Harrell, Chief

Pr 'ect Branch D

Div ion of Reactor Projects

Docket No.: 50-382

License No.: NPF-38

Enclosure:

NRC Inspection Report No.

50-382/99-09

9906110118 990603

PDR

G ADOCK 05000392

PDR

L_.

.

.

Entergy Operations, Inc. -2-

cc w/ enclosure:

Executive Vice President and l

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations

Watedord 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager- Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director, Nuclear Safety &

Rogulatory Affairs

Watedord 3 SES

Entergy Operations, Inc. '

P.O. Box B

Killona, Louisiana 70066

Ronald Wascom, Administrator

i

Louisiana Radiation Protection Division

l

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

h,

.

Entergy Operations, Inc. -3-

l Parish President

! St. Charles Parish

l P.O. Box 302

Hahnville, Louisiana 70057

Winston & Strawn .

l- 1400 L Street, N.W.

. Washington, D.C. . 20005-3502

)

l

l

!

i

1

I

I

l

L

1

1

? I

b

Entergy Operations, Inc. -4-  !

L

JUN - 31999

'

E-Mail report to T. Frye (TJF)

l E-Mail report to D. Lange (DJL) -

l E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01) l

l

bec distrib. by RIV:

i Regional Administrator Resident inspector

'

DRP Director DRS-PSB l

DRS Director MIS System j

Branch Chief (DRP/D) RIV File

Project Engineer (DRP/D)

l

Branch Chief (DRPriiSS)

I

l

I

\

\

DOCUMENT j NA E: R:\_WAT\WT909RP.TRF

To receive cpgry $ c!sment, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:% //,s.Ak RIV:S A J,M C:DRP)G j iA l l

JMleetoW@

f TRFfth M (/ PHHakeW/

5/25/99 /5(Mh 6/$/9% 1 6/'h /9 F [ ;

(/ ~ \, '

/ \ OFFICIAL RKORD COPY

l

110041

f .

l

'

Entergy Operations, Inc. -4-

JUN - 31999

l E-Mail report to T. Frye (TJF)

l E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

I

bec to DCD (IE01) l

l

! bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

i DRS Director MIS System

j Branch Chief (DRP/D) RIV File

l Project Engineer (DRP/D)

l Branch Chief (DRPffSS)

! .

i

l

l

i

-

l

{ I

l

)

l

l

I

l

!

l l

l DOCUMENT SA E: R:\_WABWT909RP.TRF

To receive c $ cyment, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:Vs //,Jk RIV:S A .) C:DRP)Q jA l l

JM(eetoML TRF(rhtjblFT(/ PHHakeh #

5/25/99 /5(Mh 6/6/9K T 6/% /9F[ >

(/ ' \, ' / \ OFFICIAL RpORD COPY

l

L