| number = ML20203A824
| number = ML20207F012
| issue date = 07/11/1986
| issue date = 12/23/1986
| title = Ack Receipt of 860630 Ltr Informing NRC of Steps Taken to Correct Violations & Proposed Imposition of Civil Penalty in Amount of $50,000 Based on Insp Repts 50-321/86-06 & 50-366/86-06
| title = Ack Receipt of 860630 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06.Civil Penalty Should Remain as Presented in Notice of Violation.Encl Withheld (Ref 10CFR2.790 & 73.21)
| author name = Grace J
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 2776N, EA-86-069, EA-86-69, NUDOCS 8607170334
| document report number = EA-86-069, EA-86-69, NUDOCS 8701050369
| package number = ML20203A828
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 2
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_ __ _ __ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______ ____ _________  _ _ _ _ _ - _ _ _ - _ _ _ _ .
  -.
. DEC 231986
 
;
Docket Nos. 50-321, 50-366 License Nos. OPR-57, NPF-5 EA 86-69 l
Georgia Power Company ATTN: Mr. J. H. Miller, J President P. O. Box 4545 Atlanta, GA 30302
.
!  Gentlemen:
SUBJECT:  NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06 Thank you for your response of June 30, 1986, to our Notice of Violation and Proposed Imposition of Civil Penalty issued on May 28, 1986, concerning licensed activities conducted at your Hatch facility. We have evaluated your responses to violations I, II.A, and II.C and found that they meet the requirements of 10 CFR 2.210. We will examine the implementation of your corrective actions during future inspection Af ter careful consideration of the basis of yeur request that the proposed civil penalty for Violation I be mitigated, we have concluded, for the reasons presented in the enclosure to this letter, that the civil penalty should remain as presented in the Notice of Violatio A detailed review of information presented in your request for reduction of the Severity Level for violations II.A and II.C has been determined not to be of sufficient basis to warrant reductio Your btsis for dental of Violation !!.B is that a functional test was performed on all intrusion alarms. Your are requested to provide the basis for your statement and any documentation of the functional test to this office for review and further evaluation of violation II.B in a supplemental response. For the reasons presented in the enclosure to this letter, your stated bases for denial of violations II.D and II.E are not considered to be adequate justification for withdrawal of these violations. Therefore, in accordance with 10 CFR 2.210(a),
please submit to this office within 30 days of the date of this letter your supplemental response for violation II.B and a written statement describing steps which have been taken to correct violations II.D and II.E. the results achieved, corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieve In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter will ng be placed in the NRC Public Document Roo ['[GINr cenu g, ADOCK 0500  ,
t ,
ifDR
        -
        'EGUARDS INFORMATION 3-0 y *N
 
..
, Georgia Power Company  2 DEC 231986 The responses directed by this letter are not subject to the clearance procedure of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51
 
Sincerely, J. Nelson Grace Regional Administrator Enclosures:
1. Staff Assessment of Licensee Response (SafeguardsInformation) Revised Citation (SafeguardsInformation)
cc w/ enc 1:
J. P. O'Peilly, Senior Vice President Nuclear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Sites Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bec w/ enc 1:
IE File NMSS/SGPL NRR/DL/SSPB bcc w/o encl:
NRC Resident Inspector State of Georgia
    '
R11 ' RI RI! RII J5tdhb
  #
alk r f,$nkiNs it
, 12p:/86 [1243/86 12/a3/86 124}/86
      * ' G 03tlM COH1 Ain;
  :,AFEGUARDS INFORMATION  < l37ggggrgrjca
      'M 38 DECONTRCLLED.
}}
}}

Revision as of 06:27, 27 December 2020

Ack Receipt of 860630 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06.Civil Penalty Should Remain as Presented in Notice of Violation.Encl Withheld (Ref 10CFR2.790 & 73.21)
ML20207F012
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/23/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
EA-86-069, EA-86-69, NUDOCS 8701050369
Download: ML20207F012 (2)


Text

_ __ _ __ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______ ____ _________ _ _ _ _ _ - _ _ _ - _ _ _ _ .

-.

. DEC 231986

Docket Nos. 50-321, 50-366 License Nos. OPR-57, NPF-5 EA 86-69 l

Georgia Power Company ATTN: Mr. J. H. Miller, J President P. O. Box 4545 Atlanta, GA 30302

.

! Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06 Thank you for your response of June 30, 1986, to our Notice of Violation and Proposed Imposition of Civil Penalty issued on May 28, 1986, concerning licensed activities conducted at your Hatch facility. We have evaluated your responses to violations I, II.A, and II.C and found that they meet the requirements of 10 CFR 2.210. We will examine the implementation of your corrective actions during future inspection Af ter careful consideration of the basis of yeur request that the proposed civil penalty for Violation I be mitigated, we have concluded, for the reasons presented in the enclosure to this letter, that the civil penalty should remain as presented in the Notice of Violatio A detailed review of information presented in your request for reduction of the Severity Level for violations II.A and II.C has been determined not to be of sufficient basis to warrant reductio Your btsis for dental of Violation !!.B is that a functional test was performed on all intrusion alarms. Your are requested to provide the basis for your statement and any documentation of the functional test to this office for review and further evaluation of violation II.B in a supplemental response. For the reasons presented in the enclosure to this letter, your stated bases for denial of violations II.D and II.E are not considered to be adequate justification for withdrawal of these violations. Therefore, in accordance with 10 CFR 2.210(a),

please submit to this office within 30 days of the date of this letter your supplemental response for violation II.B and a written statement describing steps which have been taken to correct violations II.D and II.E. the results achieved, corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieve In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter will ng be placed in the NRC Public Document Roo ['[GINr cenu g, ADOCK 0500 ,

t ,

ifDR

-

'EGUARDS INFORMATION 3-0 y *N

..

, Georgia Power Company 2 DEC 231986 The responses directed by this letter are not subject to the clearance procedure of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51

Sincerely, J. Nelson Grace Regional Administrator Enclosures:

1. Staff Assessment of Licensee Response (SafeguardsInformation) Revised Citation (SafeguardsInformation)

cc w/ enc 1:

J. P. O'Peilly, Senior Vice President Nuclear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Sites Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bec w/ enc 1:

IE File NMSS/SGPL NRR/DL/SSPB bcc w/o encl:

NRC Resident Inspector State of Georgia

'

R11 ' RI RI! RII J5tdhb

alk r f,$nkiNs it

, 12p:/86 [1243/86 12/a3/86 124}/86

  • ' G 03tlM COH1 Ain;
,AFEGUARDS INFORMATION < l37ggggrgrjca

'M 38 DECONTRCLLED.