| | number = ML072950527 | | | number = ML072950527 |
| | issue date = 10/22/2007 | | | issue date = 10/22/2007 |
| | title = 10/19/2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements | | | title = Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements |
| | author name = Gaddy V | | | author name = Gaddy V |
| | author affiliation = NRC/RGN-IV/DRP/RPB-B | | | author affiliation = NRC/RGN-IV/DRP/RPB-B |
Line 57: |
Line 57: |
| PLE -Periormanca Umlt Exceeded: thC YSIUB llm1ls the number 01 allowed lalluies for any m e n rnonlloredcompanenlwllhoul tumlng the monlloied system Whlle under I1 thls llmlt Is sxcaeeded. Ihe MSPI for the monitored system 15 While. TeBarrllesS Of he SalcUIeted Value of the Index RII PLE Values lor second quarter2007 are 15.5 lhen 50 O B ~ C B ~ L 2 | | PLE -Periormanca Umlt Exceeded: thC YSIUB llm1ls the number 01 allowed lalluies for any m e n rnonlloredcompanenlwllhoul tumlng the monlloied system Whlle under I1 thls llmlt Is sxcaeeded. Ihe MSPI for the monitored system 15 While. TeBarrllesS Of he SalcUIeted Value of the Index RII PLE Values lor second quarter2007 are 15.5 lhen 50 O B ~ C B ~ L 2 |
|
| |
|
| 2Q2007 Callaway Plant NRC Performance Indicator Status Callaway NRC White Industry Cornerstone NRC Performance lndlcaior Threshold Threshold NRC Status AvglMedian Comments 8% 5 INPO PI Index -1ndustlyand Callaway 100 95 90 a5 a0 75 70 | | 2Q2007 Callaway Plant NRC Performance Indicator Status Callaway NRC White Industry Cornerstone NRC Performance lndlcaior Threshold Threshold NRC Status AvglMedian Comments 8% 5 INPO PI Index -1ndustlyand Callaway 100 95 90 a5 a0 75 70 65 60 55 50 45 40 35 O!mter |
| --
| |
| 65 60 55 50 45 40 35 O!mter | |
| +Callaw ay -Best Ouarble -Median -Worst Ouarble g b h i r d Quarter PI = 85.33 --- Proiected Fourth Quarter PI = 97.91 6 3 | | +Callaw ay -Best Ouarble -Median -Worst Ouarble g b h i r d Quarter PI = 85.33 --- Proiected Fourth Quarter PI = 97.91 6 3 |
|
| |
|
Line 66: |
Line 64: |
| I 9 I ? | | I 9 I ? |
| I I | | I I |
| !
| |
| I ibm8 I | | I ibm8 I |
| Top Quartile c280 Hov 05 Mar 06 Jul06 Uov 06 Mar 07 JulO7 Mor 07 | | Top Quartile c280 Hov 05 Mar 06 Jul06 Uov 06 Mar 07 JulO7 Mor 07 e |
| -
| | Goai of <50 I by 1/1/2008 Industry best at 187 4 |
| e Goai of <50 I by 1/1/2008 Industry best at 187 4
| |
|
| |
|
| \ | | \ |
| l80 o o i n JI Cumulative Plant Dose 2007 | | l80 o o i n JI Cumulative Plant Dose 2007 |
| .-2 4000 | | .-2 4000 |
| -
| |
| .-
| |
| -g E 3500 3000 | | -g E 3500 3000 |
| ," 2500 | | ," 2500 |
Line 132: |
Line 126: |
| * Implemented a Daily CARS Leadership Review Meeting Self Identificatisn Goal: Greter Than 90% | | * Implemented a Daily CARS Leadership Review Meeting Self Identificatisn Goal: Greter Than 90% |
| 0 0 | | 0 0 |
| 2 | | 2 m |
| .-
| | ln 0 |
| m ln 0
| |
| m Good h | | m Good h |
| 0 co ln a | | 0 co ln a |
Line 159: |
Line 152: |
| Violations with PI&R Cross Cutting Issues | | Violations with PI&R Cross Cutting Issues |
| :r P.1.a Law Threshold In S | | :r P.1.a Law Threshold In S |
| .-
| |
| 0 | | 0 |
| -.-m0 | | -.-m0 |
| +I | | +I 0 |
| >
| | L a |
| * 0 L
| | Q ES z |
| a Q
| |
| ES z | |
| 4 QRT 06 1 QTR 07 2 QTR 07 3 QRT 07 4 QTR 07 cess and ce are in place. | | 4 QRT 06 1 QTR 07 2 QTR 07 3 QRT 07 4 QTR 07 cess and ce are in place. |
| ue 13 | | ue 13 |
Line 175: |
Line 165: |
| - Replaced a few vent and drain lines based on inspection results 14 | | - Replaced a few vent and drain lines based on inspection results 14 |
|
| |
|
| Small Bore ESW Pipe Replacement Status 4000 3500 3000 2500 | | Small Bore ESW Pipe Replacement Status 4000 3500 3000 2500 g 2000 1500 I000 500 0 |
| -
| |
| g 2000 1500 I000 500 0 | |
| Replacing remainder of small bore piping by the end of Refuel I 6 Replacing majority of buried large bore ESW piping with HDPE material by the end of Cycle 16 (intent is to route and connect in Cycle 16 using a requested LCO extension.) | | Replacing remainder of small bore piping by the end of Refuel I 6 Replacing majority of buried large bore ESW piping with HDPE material by the end of Cycle 16 (intent is to route and connect in Cycle 16 using a requested LCO extension.) |
| Replacing B ESW pump S% 30 15 | | Replacing B ESW pump S% 30 15 |
Line 196: |
Line 184: |
| Human Performance Cross Cutting lsues4QTR06 - | | Human Performance Cross Cutting lsues4QTR06 - |
| 8 -. 3QTRO7 H'2.C 6 -. | | 8 -. 3QTRO7 H'2.C 6 -. |
| -
| |
| 0 H.3.a 55-5 H.4.a E 4 -. H.4.b fib- 4QRT06 1 QTR07 2 QTR07 3QRT07 4QTRQ7 Luke Graessle anager, Regulatory Affairs 36 18 | | 0 H.3.a 55-5 H.4.a E 4 -. H.4.b fib- 4QRT06 1 QTR07 2 QTR07 3QRT07 4QTRQ7 Luke Graessle anager, Regulatory Affairs 36 18 |
|
| |
|
|
---|
Category:- No Document Type Applies
MONTHYEARML24275A0452024-09-24024 September 2024 Procedure Review Form - EOF Notification Package ML24275A0482024-09-24024 September 2024 Procedure Review Form - Callaway, Control Room Notification Flowchart ML24256A0762024-07-25025 July 2024 Review Form - Radiological Emergency Response Plan (RERP) ML24256A0792024-07-0101 July 2024 Review Form - Activation and Operation of the Joint Information Center ML24256A0712024-07-0101 July 2024 Review Form - Emergency Implementing Actions ML24086A3722024-02-13013 February 2024 EIP-ZZ-C0010 Addendum C R013 PRF: Plant Assessment Coordinator (Pac) Checklist ML23341A1902023-12-0707 December 2023 Enclosujustification for Exemption Request from Specific Requirements in 2023 Security Rule ML23354A1132023-10-26026 October 2023 Off-Site Liaison Coordinator Checklist ML23354A1112023-10-26026 October 2023 Logistics Support Coordinator Checklist ML23354A1092023-10-26026 October 2023 Protective Measures Coordinator Checklist ML24002A8132023-07-25025 July 2023 EIP-ZZ-00240 Add E, Rev. 28, Health Physics Coordinator (Hpc) Checklist ML23150A1872023-05-18018 May 2023 Submittal of EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist ML23164A0262023-05-18018 May 2023 Procedure Review Form - Emergency Coordinator (EC) Checklist ML23150A1902023-05-18018 May 2023 Submittal of EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML22153A1922022-06-0202 June 2022 Enclosure 3 - List of Commitments ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21335A4622021-12-0101 December 2021 Enclosure 10: ARCON96-NAI Output Summary Logs ML21335A4632021-12-0101 December 2021 Enclosure 11: ARCON96-NAI Output Cumulative Frequency Distribution Results ML21335A4542021-12-0101 December 2021 Enclosure 2: Full Scope Implementation of Alternative Source Term - Evaluation of Proposed Changes ML21335A4612021-12-0101 December 2021 Enclosure 9: ARCON96-NAI Input Run Specifications ML21335A4642021-12-0101 December 2021 Enclosure 12: PAVAN-NAI Input Meteorological Data and Run Specifications for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary ML21335A4652021-12-0101 December 2021 Enclosure 13: PAVAN-NAI Output for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary ML21335A4662021-12-0101 December 2021 Enclosure 14: Summary of Differences Between ARCON96 and ARCON96-NAI and Between Pavan and PAVAN-NAI Codes ML21090A1892021-03-31031 March 2021 Enclosure 4 - Acronyms and Definitions ULNRC-06604, Enclosure - Callaway Energy Center Form OAR-1 Owner'S Activity Report2020-10-22022 October 2020 Enclosure - Callaway Energy Center Form OAR-1 Owner'S Activity Report ML20080H2382020-03-17017 March 2020 Enclosure - Nuclear Property Insurance NRC Property Rule 10 CFR 50.54(W) Reporting Requirements ML19325D6712019-11-21021 November 2019 Attachment 1 - Callaway Regulatory Commitment Update ML19225D3232019-08-12012 August 2019 Attachment 1 - List of Regulatory Commitments ML19024A4712019-01-23023 January 2019 Attachment 1 - NRC Audit Questions and Responses ML19024A4752019-01-23023 January 2019 Attachment 5 - List of Regulatory Commitments ML17097A5672017-04-0101 April 2017 joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund ULNRC-06349, joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund2017-04-0101 April 2017 joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund ML17362A0642017-02-10010 February 2017 Enclosure 7: Ameren Corporation by - Laws Effective 02/10/2017 ULNRC-06400, Enclosure 7: Ameren Corporation by - Laws Effective 02/10/20172017-02-10010 February 2017 Enclosure 7: Ameren Corporation by - Laws Effective 02/10/2017 ML17097A5662016-12-31031 December 2016 Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits ULNRC-06349, Callaway, Unit 1 - Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits2016-12-31031 December 2016 Callaway, Unit 1 - Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits ML16348A3762016-12-13013 December 2016 Enclosure 3 - 2016 Proxy Statement of Ameren Corporation ULNRC-06341, Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation2016-12-13013 December 2016 Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation ULNRC-06341, Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/20162016-09-30030 September 2016 Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/2016 ML16348A3822016-09-30030 September 2016 Enclosure 8 - 10-Q Filed Period 9/30/2016 ML16348A3812016-06-30030 June 2016 Enclosure 7 - 10-Q Filed Period 6/30/2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/20162016-06-30030 June 2016 Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/2016 ML16348A3802016-03-31031 March 2016 Enclosure 6 - 10-Q Filed Period 3/31/2016 ML16348A3882016-03-31031 March 2016 Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/20162016-03-31031 March 2016 Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 20162016-03-31031 March 2016 Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 ML17097A5682016-03-30030 March 2016 Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement ULNRC-06349, Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement2016-03-30030 March 2016 Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement 2024-09-24
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23067A1202022-12-29029 December 2022 Site Addendum, Chapter 9, Figures ULNRC-06628, Annual Radiological Environmental Operating Report Errata2021-01-0707 January 2021 Annual Radiological Environmental Operating Report Errata ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ULNRC-05963, Enclosure 2 to ULNRC-05963, Amendment 22, LRA Changes from RAI Responses and Typographical Corrections, Summary Table2013-02-28028 February 2013 Enclosure 2 to ULNRC-05963, Amendment 22, LRA Changes from RAI Responses and Typographical Corrections, Summary Table ULNRC-05928, Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates2012-11-0808 November 2012 Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates ULNRC-05918, Enclosure 2 to ULNRC-05918, Callaway, Unit 1, Amendment 12, LRA Changes from RAI Responses2012-10-15015 October 2012 Enclosure 2 to ULNRC-05918, Callaway, Unit 1, Amendment 12, LRA Changes from RAI Responses ML12271A4742012-08-13013 August 2012 Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March ULNRC-05893, Callaway, Unit 1, Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March2012-08-13013 August 2012 Callaway, Unit 1, Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12096A3692012-04-20020 April 2012 Request for Concurrence with List of Federally Protected Species and Habitats for the Proposed Callaway Plant License Renewal ML1210105572012-04-0909 April 2012 Attachment 3 ML1035103132010-12-16016 December 2010 Draft TS Mark-up Provided by Licensee as Clarification of Mutual Understanding Following NRC-Licensee TS Modification Discussions at 11/18/10 Public Mtg Re CT Extensions for TS 3.3.2 License Amendment Request ML1019004182010-06-28028 June 2010 Quick View Chart ML1016200532010-06-0909 June 2010 Borehole Identification Tables, Callaway Power Plant, Terracon Project No. 09067011T ML12271A4792009-12-31031 December 2009 Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway #2 Water District Pwss Report 3024085 ULNRC-05893, Callaway, Unit 1, Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway 2 Water District Pwss Report 30240852009-12-31031 December 2009 Callaway, Unit 1, Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway #2 Water District Pwss Report 3024085 ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0630502032006-10-25025 October 2006 Callaway, Requests for Relief from ASME Section Xi Code Inservice Examination Requirements ML0426101132004-09-13013 September 2004 Plant Engineering Branch Open Items Interim Safety Basis (URI 2002003-01) 2022-12-29
[Table view] Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000483/20230022024-02-21021 February 2024 Amended Integrated Inspection Report 05000483/2023002 ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) 2024-09-11
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24157A0642024-06-13013 June 2024 Earls 2024 Workshop Presentation ML22249A3292022-09-0606 September 2022 Presentation Information for Planned Pre-Application Meeting ML22174A3472022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21271A6132021-09-28028 September 2021 Enclosure 2: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21211A0712021-07-30030 July 2021 Meeting Slides for Pre-submittal Teleconference to Discuss EP Revision LAR ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21050A2042021-03-31031 March 2021 March 2021 Meeting Slides ML20248H4672020-09-0404 September 2020 Rict & 50.69 LARs - NRC Pre-Submittal Meeting Slides ML20170A2032020-06-24024 June 2020 6/24/2020 - Pre-Submittal Meeting for Callaway Plant License Amendment Request to Defer Steam Generator Eddy Current Testing ML19247B3842019-09-12012 September 2019 GSI-191 / GL 2004-02 Licensing Amendment Request ML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16152A1232016-06-0101 June 2016 Strainer Testing for GSI-191 ML14050A4022014-02-20020 February 2014 License Renewal Public Meeting Slides 2 20 2014 ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12320A3052012-11-15015 November 2012 Licensee Slides for November 15, 2012 Public Meeting to Discuss License Amendment to Use Reg Guide 1.6 Revision 1 ML12241A2912012-08-29029 August 2012 UHS Meeting Slides August 29, 2012 ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1115304052011-05-26026 May 2011 Licensee Slide'S from 5/26/11 Pre-Application Meeting ML1008804082010-03-25025 March 2010 Licensee Slides Pre-LAR Submittal Telecon ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0932104872009-11-17017 November 2009 Summary of Regulatory Conference with Ameren Ue Regarding Callaway Plant ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0916002532009-06-0808 June 2009 Summary of Annual Performance Assessment Meeting with Amerenue for Callaway Plant ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0904400462009-01-13013 January 2009 Public Scoping Meeting Presentation Slides ML0815404352008-06-0202 June 2008 Summary of Meeting to Discuss Annual Safety Performance Assessment for Callaway for 2007 ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0716000102007-06-0707 June 2007 Summary of Meeting with Union Electric Co Re Callaway Annual Performance Assessment ML0628602302006-10-12012 October 2006 Handout for Meeting with Nuclear Energy Institute (NEI) to Discuss Concerns Related to Operability Determination of Main Steam and Feedwater Isolation Valves with Dual Actuator Trains ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0613001302006-05-0909 May 2006 Meeting Summary of 05/04/2006 end-of-cycle Performance Assessment ML0520804072005-07-27027 July 2005 Summary of Meeting with Union Electric Company Concerning Callaway Plant ML0330402882003-10-30030 October 2003 Meeting Handout Materials Regarding STARS-IRAG/NRC Meeting to Discuss Topics Taken from the June 10.11, 2003, Workshop ML0319206482003-06-10010 June 2003 Meeting Handouts for STARS-IRAG/NRC Workshop to Discuss Selected Topics Listed in the Agenda Attached to Meeting Notice ML0310604602003-04-15015 April 2003 Meeting Handout to Discuss Licensee'S Program to Replace the Steam Generators at Callaway ML0231200242002-11-0707 November 2002 Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group ML0208705662002-04-15015 April 2002 Meetingsummary with Stars and the NRC to Inform the NRC About Current Stars Activities ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary 2024-06-13
[Table view] Category:Meeting Summary
MONTHYEARML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML22259A1192022-10-12012 October 2022 Summary of Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome Gaia Fuel Assemblies in Its Core Reload Quantities for Callaway Plant, Unit No. 1 ML22181A0012022-07-22022 July 2022 Summary of June 29, 2022, Public Meeting - Union Electric Company, Dba Ameren Missouri to Discuss Upcoming License Amendment Request to Revise Technical Specifications to Reflect Revised Spent Fuel Pool Criticality Safety Analysis ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22089A2292022-04-0606 April 2022 February 28, 2022, Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21308A0742021-11-17017 November 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21243A0042021-09-0707 September 2021 Summary of Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Revise the Emergency Plan ML21216A2002021-08-11011 August 2021 Summary of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission 2020 Annual Assessment of Callaway Plant Docket No. 50-483 ML21168A0022021-07-0101 July 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21103A0032021-04-16016 April 2021 Summary of March 15, 2021, Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Implement Alternative Source ML20280A5632020-10-21021 October 2020 Summary of Teleconference Meeting with Union Electric Company (Dba Ameren Missouri) for Callaway Plant, Unit 1, on Pre-Application for LARs on TSTF-439, TSTF-505, and Title 10 CFR 50.69 Categorization Program (EPID L-2020-LRM-0072 ML20189A1992020-07-13013 July 2020 Summary of (COVID-19) Presubmittal Public Teleconference W/Union Electric Company Postponement of Steam Generator Eddy Current Testing, by One Refueling Outage, for Callaway Plant, Unit No. 1 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19268A9772019-10-16016 October 2019 Summary of 9/12/2019 Meeting with Union Electric Company Related to Closure of Generic Letter 2004-02 for Callaway Plant, Unit 1 ML18215A3752018-08-21021 August 2018 Summary of Pre-Submittal Meeting with Union Electric Company to Discuss an Alternate Source Term License Amendment Request ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16165A0042016-06-23023 June 2016 Summary of 6/1/2016 Public Meeting with Union Electric Company to Discuss Generic Safety Issue 191 and Callaway Plant Unit 1's Debris Testing Plan ML14281A3652015-02-23023 February 2015 May 2, 2014, Summary of Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14223A6022014-08-20020 August 2014 Summary of Telephone Conference Call Held on December 18, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) ML14223A5322014-08-20020 August 2014 November 26, 2013, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal A ML14177A5952014-07-0808 July 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plant, Un ML14175B4992014-07-0808 July 2014 Summary of Telephone Conference Calls Held on October 2 and 3, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plan ML14169A6372014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 28, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Pertaining to the Callaway Plant, Unit 1, LRA ML14169A6042014-07-0303 July 2014 April 30, 2014, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14125A1992014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 9, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708) ML14169A4412014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 21, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708 ML14121A5532014-06-18018 June 2014 November 25, 2013, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14093B3382014-04-14014 April 2014 01/30/2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14087A2102014-04-0808 April 2014 Summary of 3/25/14 Verbal Relief Telephone Conference, Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14070A0782014-04-0707 April 2014 02/27/2014 & 03/04/2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, License Renewal Application RAI Set 31 ML14080A5442014-03-31031 March 2014 February 20, 2014, Summary of Meeting Held Between U.S. Nuclear Regulatory Commission Staff and Union Electric Company Representatives to Discuss the Callaway Plant, Unit 1, License Renewal Application ML14035A5752014-03-25025 March 2014 January 28, 2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, LRA ML13246A3072013-09-0909 September 2013 Memorandum to File - Verbal Authorization of Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13126A3202013-05-0707 May 2013 Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval. ML13067A3162013-04-0101 April 2013 August 23, 2012, Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway Plant, Unit 1, License ML13029A0162013-02-12012 February 2013 Summary of Telephone Conference Call Held on January 22, 2013, Between the U.S. Nuclear Regulatory Commission ML13029A6592013-02-12012 February 2013 Summary of Telephone Conference Call Held on December 6, 2012, Between the NRC and Union Electric Company, Concerning Request for Additional Information Pertaining to the Callaway Plant Unit 1, LRA ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12321A1992012-11-29029 November 2012 9/27/12 - Summary of Telephone Conference Call Held Between the NRC and Union Electric Company (Ameren Missouri), Concerning RAIs Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML12321A1882012-11-20020 November 2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12262A3112012-10-0202 October 2012 Summary of Telephone Conference Call Held on September 14, 2012, Between NRC and Union Electric Company, Concerning the SAMA RAI for the Callaway Plant, Unit 1, LRA ML12243A3922012-09-18018 September 2012 Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12243A3762012-09-18018 September 2012 8/29/2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12244A4292012-09-18018 September 2012 Summary of Telephone Conference Call Held on August 29, 2012, Between the U.S. Nuclear Regulatory Commission and Union Electric Company, Concerning the Request for Additional Information Pertaining to the Callaway Plant, Unit 1, License Ren ML1116002282011-06-21021 June 2011 Summary of Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Proposed Request to Adopt Risk-informed, Performance-based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1104001662011-02-22022 February 2011 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1034701472010-12-16016 December 2010 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Related to Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1008804162010-03-31031 March 2010 Meeting Summary of Conference Call with Union Electric Company to Discuss Proposed Application for Relocation of Surveillance Frequencies from Callaway Plant Technical Specifications (Risk-Managed TS Initiative 5b) 2024-01-12
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24157A0642024-06-13013 June 2024 Earls 2024 Workshop Presentation ML22249A3292022-09-0606 September 2022 Presentation Information for Planned Pre-Application Meeting ML22174A3472022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21271A6132021-09-28028 September 2021 Enclosure 2: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21211A6012021-07-30030 July 2021 Annual Assessment Meeting (Public) ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML20248H4672020-09-0404 September 2020 Rict & 50.69 LARs - NRC Pre-Submittal Meeting Slides ML20170A2032020-06-24024 June 2020 6/24/2020 - Pre-Submittal Meeting for Callaway Plant License Amendment Request to Defer Steam Generator Eddy Current Testing ML19247B3842019-09-12012 September 2019 GSI-191 / GL 2004-02 Licensing Amendment Request ML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16152A1232016-06-0101 June 2016 Strainer Testing for GSI-191 ML14050A4022014-02-20020 February 2014 License Renewal Public Meeting Slides 2 20 2014 ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12320A3052012-11-15015 November 2012 Licensee Slides for November 15, 2012 Public Meeting to Discuss License Amendment to Use Reg Guide 1.6 Revision 1 ML12241A2912012-08-29029 August 2012 UHS Meeting Slides August 29, 2012 ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 ML12096A3942012-03-14014 March 2012 Enclosure 5: Callaway Public Meeting Slides ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1115304052011-05-26026 May 2011 Licensee Slide'S from 5/26/11 Pre-Application Meeting ML1008804082010-03-25025 March 2010 Licensee Slides Pre-LAR Submittal Telecon ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0932104872009-11-17017 November 2009 Summary of Regulatory Conference with Ameren Ue Regarding Callaway Plant ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0904400462009-01-13013 January 2009 Public Scoping Meeting Presentation Slides ML0815404352008-06-0202 June 2008 Summary of Meeting to Discuss Annual Safety Performance Assessment for Callaway for 2007 ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0628602302006-10-12012 October 2006 Handout for Meeting with Nuclear Energy Institute (NEI) to Discuss Concerns Related to Operability Determination of Main Steam and Feedwater Isolation Valves with Dual Actuator Trains ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0611002222006-04-18018 April 2006 Summary of Meeting with Union Electric Company Regarding Callaway Plant, Which Discussed Recent Plant Performance and Various Topics ML0533202252005-12-0101 December 2005 Ri Schedule 05- Mcmurtray; Lessons Learned from Security-Based Table Top Drills ML0520804072005-07-27027 July 2005 Summary of Meeting with Union Electric Company Concerning Callaway Plant ML0430903882004-11-0404 November 2004 Docket No. 50-483 - Licensee'S Slides for Meeting Held on November 4, 2004, to Discuss Its Application on the Steam Generators Replacement in Fall 2005 (Tac No. MC4437) ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0408501912004-03-23023 March 2004 Docket No. 50-483 - Slides from Meeting Held on March 23, 2004, to Discuss Licensee'S License Amendment Request Application Dated December 17, 2003 ML0316806212003-07-17017 July 2003 Licensee'S Handouts, Slides and Viewgraphs, 53 Pages, S107210 ML0316806062003-07-17017 July 2003 NRC Handout, Slides and Viewgraphs, 103 Pages, S107211 ML0211402982002-04-24024 April 2002 Annual Performance Assessment Meeting for Callaway Plant ML0206503632002-03-0606 March 2002 02-27-02 Callaway/Ameren Ue Meeting Summary 2024-06-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY C O M M I S S I O N REGION IV 611 R Y A N P L A Z A D R I V E , S U I T E 400 A R L I N G T O N , T E X A S 7 6 0 1 1-4005 October 22, 2007 Charles D. Naslund, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
MEETING
SUMMARY
CONCERNING CALLAWAY PLANT PUBLIC MEETING ON OCTOBER 19, 2007
Dear Mr. Naslund:
This refers to the public meeting conducted at the NRC Region IV office in Arlington, Texas, on October 19, 2007. At this meeting, NRC and AmerenUE management discussed various topics, including: essential service water; the current problem identification and resolution crosscutting issue; recent human performance improvements; circumstances leading to the September 6, 2007, emergency declaration; and, safety culture.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document management system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincere1y ,
Vincent G. Gaddy, Project Branch B Division of Reactor Projects Docket: 50-483 License: NPF-30
Enclosures:
- 1. Attendance List
- 2. Presentation Slides
Union Electric Company John ONeill, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.
Washington, DC 20037 Scott A. Maglio, Assistant Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governors Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360 H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P. 0. Box 176 Jefferson City, MO 65102-0176 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 41 1 Burlington, KS 66839 Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street Fulton, MO 65251 Les H. Kanuckel, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251
Union Electric Company Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-01 16 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Luke H. Graessle, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Thomas B. Elwood, Supervising Engineer Regulatory Affairs/Licensing AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood, P.O. Box 570 Jefferson City, MO 65102 Technical Services Branch Chief FEMA Region VI1 2323 Grand Boulevard, Suite 900 Kansas City, MO 64108-2670
ENCLOSURE 1 ATTENDANCE SHEET - CALLAWAY PUBLIC MEETING (10/19/07)
PAGE IOF
ENCLOSURE 2 October 19, 2007 1
Chuck Naslund Senior Vice President and Chief Nuclear Officer 1
Introduction
- Chuck Naslund Pi&R Cross Cutting Issue
- Adam Heflin ESW Update
- Tim Herrmann Human Performance - Procedure Use and Adherence
- Fadi Diya PRA improvements and Actions to Meet RG 1.200
- Luke Graessle Safety Culture Update
- Chuck Naslund
%2 3 2Q2007 Callaway Plant NRC ance Indicator Status
.MSPI.
PLE -Periormanca Umlt Exceeded: thC YSIUB llm1ls the number 01 allowed lalluies for any m e n rnonlloredcompanenlwllhoul tumlng the monlloied system Whlle under I1 thls llmlt Is sxcaeeded. Ihe MSPI for the monitored system 15 While. TeBarrllesS Of he SalcUIeted Value of the Index RII PLE Values lor second quarter2007 are 15.5 lhen 50 O B ~ C B ~ L 2
2Q2007 Callaway Plant NRC Performance Indicator Status Callaway NRC White Industry Cornerstone NRC Performance lndlcaior Threshold Threshold NRC Status AvglMedian Comments 8% 5 INPO PI Index -1ndustlyand Callaway 100 95 90 a5 a0 75 70 65 60 55 50 45 40 35 O!mter
+Callaw ay -Best Ouarble -Median -Worst Ouarble g b h i r d Quarter PI = 85.33 --- Proiected Fourth Quarter PI = 97.91 6 3
Goal - End of Year 2007: <=I5 Corrective Maintenance Jobs Good I 0 DecOd AprOG AugO6 Dec06 Apr07 AugO7 DecO7 ests Good
>O 0
I 9 I ?
I I
I ibm8 I
Top Quartile c280 Hov 05 Mar 06 Jul06 Uov 06 Mar 07 JulO7 Mor 07 e
Goai of <50 I by 1/1/2008 Industry best at 187 4
\
l80 o o i n JI Cumulative Plant Dose 2007
.-2 4000
-g E 3500 3000
," 2500
=r al 2000 a 1500 s
1000 500 0
1 2 3 4 5 6 7 B 9 D~~QU6~W8U2021ZL21242525~25~3031323334353631334041~243W~5CS414~39~519 Week
+Olmrula$e bse -bse(hal -Tap cede W r l m c e 5
ustry Perfor Industrial Safety Accident Rate 18 hbnth Period 0.4 0.3 0.2 0 .I 0
m m Z T m m m 9
N 0
9 m
0 2
0 9
LrJ 0 2 0
9 6
N 0 N 0 N 0 N 0 N 0 cu 0
Year.Last Month Of Quarter
&I% 11 Unplanned Automatic Scrams 24 Month Period 2
1.5 1
0.5 m m m m m m 9 9 9 9 9 9 N
0 m 0
d 0
Ul 0
(D 0 .0 r
N 0 N 0 N 0 N 0 N 0 N 0
Year.Last Month OfQuarter 3"
6
Chemistry Performance Indicator 18 Month Period I-!I I , I 1 I I I -T17t7-r'l-m m m m o
N 4O m 9 0
o m
o.
m u) 9 P-0 0 0 0 0 N
0 N N o N N N O
Year.Last Month Of Quarter g% 13 Radiation Exposure 18 hhnthPeriod 2001 0
m m m m m m 9 9 9 9 9 9 g m o
0 N 8 8 N N 0
Year. Last Month OfQuarter 8% 14 7
ry Perfor INPO Screened Events-Human Performance Two Year Rolling Average
~ m w m ~ m a m ~ m w m ~ m w m ~ m w Y99970.99-9997999-99 m u w w w h r n m m o ~ ~ ~ m u w ~ w ~
m m m m m m m m m o o o o o o o o o o m m m m a m m m m o o o o o o o o o o r r r r r r - r r N N N N N N N N "
Yearbst Month Of Quarter Adam Heflin resident, Nuclear 16 8
0 Letter received March 2, 2007 e
There were 14 findings related to Problem Identificat ion and Resolution 0
Root Cause pointed at oversight and behaviors
- Benchmarking and process improvements were already in place e We are getting the right results now
!g% 17 awiors current lace 0 Lower and broader identification threshold is clear and being implemented 0 Extensive training on Operability Determinations and RIS 2005-20 h a s resulted in consistently accurate high quality Operability Determinations owned by the shift managers m Management engagement in establishing corrective actions and proper close out of issues is required and occurring 0 Senior leadership established expectations for managers, superintendents and supervisors and the team is holding e a c h other accountable to meetina exDectations I
18 9
versight in place e Established the plant director as the CAR5 Chairman 0 Improved root cause team support and management engagement with the team e Retrained and requalified all CAWB members to improve knowledge of CAP fundamentals and CARB oversight expectations
- Implemented a Daily CARS Leadership Review Meeting Self Identificatisn Goal: Greter Than 90%
0 0
2 m
ln 0
m Good h
0 co ln a
(D Octo6 Dee06 Mar07 Jun07 Sep07 Dee07 10
CAR Ge 7000 6000 5000 4000 3000 Good 2000 1000 0
Adverse Conditio Goal: Less than 450 by EOY 2007 11
SCAQ (Sig I) CARS wlo Recurrence Goal: 100%
0 0
v 0
m e,
4 0 0 u w rn 0
r--
0 10 Jan07 Mar07 May07 JulO7 Sep 07 Quality of Cause Analysis Goal: Greater Than or Equal to 90 Good In 0
0.
U
@ - $ , i . , . . . /
AprO? Jun07 AugO? Octo? DecO?
--El-- Sig 3 Qual&
+Sig 112 Approved at CARB first time Sk,4 Qual&
12
Violations with PI&R Cross Cutting Issues
- r P.1.a Law Threshold In S
0
-.-m0
+I 0
L a
Q ES z
4 QRT 06 1 QTR 07 2 QTR 07 3 QRT 07 4 QTR 07 cess and ce are in place.
ue 13
Tim Herrmann Vice President, Engineering 21 ccomplishments e Planned replacement of small bore pipe 9 Inspected portions of 30, 8 and 6 diameter pipe
- Replaced portions of 30, 8 and 6 diameter pipe based on inspection results
- Repaired portions of 30 diameter pipe using internal base metal repairs and external weld overlay repairs Q Inspected a sample of vent and drain lines
- Replaced a few vent and drain lines based on inspection results 14
Small Bore ESW Pipe Replacement Status 4000 3500 3000 2500 g 2000 1500 I000 500 0
Replacing remainder of small bore piping by the end of Refuel I 6 Replacing majority of buried large bore ESW piping with HDPE material by the end of Cycle 16 (intent is to route and connect in Cycle 16 using a requested LCO extension.)
Replacing B ESW pump S% 30 15
Q The scope of the inspection program is based on:
-What has not been inspected
- Pipe that will not be replaced by the end of Refuel 16
- Monitoring repaired pits
- Monitoring non-repaired pits Future replacements will be driven by the inspection program 0 Overall reliability of the ESW System has improved:
- Reduction in frequency of small bore leaks (over 2 years since last leak)
- No structural concerns for the pipe degradation found in ESW System
- Piping replacement has increased flow margin to ESW System heat loads and reduced probability of through-wall leakage Additional pipe replacement will further increase flow margin and reduced probability of through-wail leakage 32 16
Fadi Diya Plant Director 33 e Continuing the Use and Reinforcement of Human Performance Event Prevention Tools a Continuing the Use of Coaching Observations:
- Over 1100 Documented Observations Per Month Consequential Error Rate at 0.069 Per 10,000 Hours Worked 17
Violations with Human Performance Cross Cutting Issues 9
Human Performance Cross Cutting lsues4QTR06 -
8 -. 3QTRO7 H'2.C 6 -.
0 H.3.a 55-5 H.4.a E 4 -. H.4.b fib- 4QRT06 1 QTR07 2 QTR07 3QRT07 4QTRQ7 Luke Graessle anager, Regulatory Affairs 36 18
Q Training & Qualification of new PRA Engineers PRA Model Upgrade to RG 1.200 Future Projects 37 Chuck Naslund Senior Vice President and Chief Nuclear Officer 19
39 20