ML24122A113

From kanterella
Jump to navigation Jump to search
Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report
ML24122A113
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 04/30/2024
From: Witt T
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24122A112 List:
References
ULNRC-06868
Download: ML24122A113 (1)


Text

Aiiieren Callaway Plant MISSOURI April 30, 2024 ULNRC-06868 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 40 CFR 190 10 CFR 72.44(d)(3)

Ladies and Gentlemen:

DOCKET NUMBERS 50-483 AND 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPf-30 2023 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT Please find enclosed the 2023 Annual Radioactive Effluent Release Report for the Callaway Plant (Callaway Energy Center) and its associated independent spent fuel storage facility. This report is submitted in accordance with Section 5.6.3 ofthe Callaway Plant Technical Specifications and Section 5.1.c ofAppendix A to the HI-STORM UMAX Certificate of Compliance.

This letter does not contain new commitments.

Ifthere are any questions, please contact Aaron Enloe at 573-592-9286.

Sincerely, Todd A. Witt Manager, Regulatory Affairs Enclosure

$3 15 Zounty I.oad 459 Steecl.iiiari, II 65077 A..rrierenl\\/lissouri.coiri

ULNRC-06868 April 30, 2024 Page 2 of 3 cc:

Mr. John Monninger Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001

ULNRC-06868 April 30, 2024 Page 3 of 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West freeway, Suite 400 fortWorth,TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya K. C. Scott W. A. Witt J. G. Beck T. A. Witt T. B. Elwood M. Maxwell A. E. Enloe E. A. Kissock E. R. Newcomb NSRB Secretary Mr. Jason Davenport, REP Manager (SEMA)

STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Mr. Aaron Schmidt (DNR)