Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013
ML24290A190
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/21/2024
From: Vincent Gaddy
NRC/RGN-IV/DORS/EB1
To: Diya F
Ameren Missouri
References
IR 2024013
Preceding documents:
Download: ML24290A190 (9)


Text

October 21, 2024

SUBJECT:

CALLAWAY PLANT - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000483/2024013

Dear Fadi Diya:

On October 3, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant and discussed the results of this inspection with Kent Scott, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number: 05000483

License Number: NPF-30

Report Number: 05000483/2024013

Enterprise Identifier: I-2024-013-0006

Licensee: Ameren Missouri

Facility: Callaway Plant

Location: Steedman, MO

Inspection Dates: September 16, 2024 to October 3, 2024

Inspectors: R. Kumana, Senior Reactor Inspector D. Reinert, Senior Reactor Inspector F. Thomas, Reactor Inspector

Approved By: Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication

(1) Material Item 7763217 - O-ring for Diesel Generator A Cylinder Liner
(2) Material Item 7636075 - Swagelok Check Valve for Containment Air Cooler A & C Air Accumulator
(3) Material Item 7671393 - Lever Switch for Turbine-Driven Auxiliary Feedwater Steam Supply Valve
(4) Material Item 7683184 - Gasket for Component Cooling Water Containment Bypass Isolation Valve
(5) Material Item 7765169 - Manometer Fluid for Diesel Generator Turbocharger Inlet Pressure Indication
(6) Material Item 7624159 - Electrolytic Capacitor for Engineered Safety Features Power Supply
(7) Material Item 7717682 - Circuit Breaker for Ultimate Heat Sink Cooling Tower Fan
(8) Material Item 7655036 - Adhesive Coating for Diesel Generator Fuel Oil Storage Tank
(9) Material Item 7675793 - Struthers-Dunn Time Delay Relay for Motor-Driven Auxiliary Feedwater Permissive Timer
(10) Material Item 7731759 - Thermostatic Expansion Valve for Control Room Air Conditioning Unit
(11) Material Item 6310111 - Glass Tube Fuse for Control Building Ventilation Isolation
(12) Material Item 7716789 - Volume Booster Relay for Diesel Generator A Lube Oil Pressure Indication
(13) Material Item 7647260 - Current to Pressure Transducer for Turbine-Driven Auxiliary Feedwater Air-Operated Control Valve
(14) RFR 230145 - 10 CFR 50.69 Alternative Treatment Procurement for Control Room and Electrical Equipment Room Air Conditioning Units Sequence Timer
(15) Commercial Grade Dedication of Fuel Oil used in Safety-Related Emergency Diesel Generators

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 3, 2024, the inspectors presented the design basis assurance inspection (programs) inspection results to Kent Scott, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.03 Corrective Action Condition Report 201505332, 201605969, 201902018, 201902623,

Documents (CR-) 202004206, 202005077, 201805580, 202102723,

201902461, 201902332, 202106111, 202305242

Corrective Action Condition Report 202405967, 202405968, 202406013, 202406038,

Documents (CR-) 202406027, 202406044, 202406138, 202406216,

Resulting from 202406223, 202406277, 202406286, 202406324

Inspection

Drawings E-094-0062 Tabulation Chart SA066C 04

Engineering 11685 Change Jacket Water O-rings from Buna-N to Viton 0

Changes 160180 Replacement IP Transducer 0

Engineering RFR 008793A Safety Classification of KJ System Pressure Transmitters12/13/1990

Evaluations RFR 020223A Improved Housing Screws for Volume Boosters 11/22/1999

Miscellaneous 10466-J-601B Design Specification for Atmospheric Relief Valves 6

24136 NUPIC Joint Audit of Parker Hannifin Corp (O-Ring Div) 7/27/2016

Lexington KY

24808 NUPIC Joint Audit of Parker Hannifin Corp (O-Ring Div) 8/28/2019

Lexington KY

282 NUPIC Joint Audit of Parker Hannifin Corp (O-Ring Div) 08/18/2022

Lexington KY

A210.0083 Valve Retest Manual 64

E-093-00043 Instruction Manual for Auxiliary Relay Rack 8

J-601A-00129 Nuclear Service Control Valves 95

J-601B-00074 IM Atmosphere Relief Valve 55

LC103 Manual LC103 ReZolver ' Capacitor & Inductor Analyzer, 0

Operation and Application Manual

M-018-00318 Seismic Calculations for the Emergency Diesel 09/30/1981

Generating Units

M-622.1-00061 Package Air Conditioning Units 74

Procedures 10503169.500 Primary & Secondary Power Supply & Card Frame Fuse 7

Replacement

14508852.500 SB148B Upper and Lower Power Supply Replacement 7

17502698.500 Calibrate Relay AL62RP330TDDAL1 for DPAL01A 0

Inspection Type Designation Description or Title Revision or

Procedure Date

18503144.910 PMT Functional Check of 'A' UHS Fan 0

23001449.450 Fabricate New Timer from Old Timers 1

APA-ZZ-00400 Procurement of Parts, Supplies, Materials, and Services54

APA-ZZ-00500 Non-Conforming Materials Report 24

Appendix 2

APA-ZZ-00500 Corrective Action Program 80

APA-ZZ-00500 Operability And Functionality Determinations 33

Appendix 1

APA-ZZ-00500 Operability Determinations 40

Appendix 1

APA-ZZ-00600 Design Change Control 57

APA-ZZ-05069 10 CFR 50.69 Alternative Treatment Requirements 002

Appendix 4

CSP-ZZ-07350 Diesel Fuel Oil Testing Program 33

CTP-JE-01230 Diesel Fuel Oil Sampling 56

EDP-ZZ-04015 Evaluating and Processing Requests for Resolution (RFR)70

EDP-ZZ-04026 10 CFR Part 21 Evaluations 16

MPE-ZZ-QY045 Inspection, Test and Calibration of Miscellaneous 005

Protective Control and Time Delay Relays

MPE-ZZ-QY300 Test and Calibration of Time Delay and Control Relays 019

MPE-ZZ-QY300 Generic Test and Calibration of Time Delay and Control 002

Addendum C Relays

MPE-ZZ-QY300, Test and Calibration of Struthers-Dunn/MSD Inc. Time 000

Addendum A Delay and Control Relays

ODP-ZZ-00001 Operations Department - Code of Conduct 105

QCP-ZZ-03003 Material Receipt Inspection 39

WDP-ZZ-00010 Identification, Control, Storage, and Disposition of Shelf-23

Life Items

WDP-ZZ-00010 Generic And Specific Shelf-Life Items List 8

Appendix A

WEP-ZZ-00001 Commercial Grade Evaluation 16

WEP-ZZ-00007 Procurement Level Assignment 18

WEP-ZZ-00019 Sampling Plan Utilization for Commercial Grade Item 4

Inspection Type Designation Description or Title Revision or

Procedure Date

Acceptance

WSP-ZZ-00002 Storeroom Storage and Control 34

ZDP-ZZ-00001 Supply Services Functional Department Procedure 19

Shipping Records Purchase Order 93708, 485251, 755320, 852099, 856242, 871272,

(PO-) 988238, 1011239, 1020137, 1023155, 859372, 913059,

977951, 791933, 734133

Work Orders 10512212, 19001334, 19511352, 21004074, 1800006,

17003498, 22003472, 17005824, 23002608

7