ML20235E823

From kanterella
Jump to navigation Jump to search
Grants Util 720414 Permission to Perform 25% Power Startup Test as Shown in Fsar,Amend 13,Section 13,Page 13.19-4 at 18 to 20% Power.Util Requested to Submit Appropriate Changes to Section 13 of FSAR
ML20235E823
Person / Time
Site: Quad Cities, 05000000
Issue date: 04/26/1972
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Butterfield L
COMMONWEALTH EDISON CO.
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709280285
Download: ML20235E823 (2)


Text

_ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~y- -

l

, ., i

",-},..~

l l

APR 2 61972 l

I

Doaket moe. 50-254 and 50-26 l

. l r

L rWth Idison Company ATTNa Mr. L. Dc Butterfield, Jr. i

) Encinar Licensing Administrator i J P. O., Box 767 Chicago, Illinois 60690 T:

I Centlement Tour letter dated April 14, 1972, requested permission to perform the t

25% power startup tests as shown in the Final Safety Analysis Report (FSAR), Amendment 13, Section 13, page 13.19-4 at 18 to 201 power.

t The part of the test program presented La your request is the same as that presented in Section 13 of Amendment 13 to the PSAR except that the test power level is changed from 25% to 18-20% of plant rated power. The test progran in Amandment 13 has been reviewed previously and found acamptable. We have reviewed the offsets of performing the 25% power level tests at the proposed lower power level and have concluded that this ch2nge will not significantly influence the valid-ity of the test results. It also is eencluded that performance of the specific tests at 18-20% plant rated power does not present signifi-cant hazards considerations est described or implicit la the Safety Analysis Report, requires no change in the Quad-Cities Technical Specifications, and that there is reasonable assurance that the health and safety of the public will not be endangered.

r Accordingly, pursuant'te Section 50.59 el 10 CFR Part 50, you are hereby authorised to change the startup test program for Quad-Cities i

8709280285 870921 PDR FDIA MENZ87-111 PDR g,

.2j]

, l r p -

Commonwealth Edison Company i APR 2 619~/2 r ,

l Ilmits l' and 2, submitted in Amendment 13 of Section 13 of the FSAR, by performing the 25% power tests itemized in the FSAR at 20% rated power. Please submit appropriate changes to Section 13 of the FSAR within 60 days after receipt of this authorization.

sincere.ly,

{

I j

F Donald J. Skovbolt l Assistaat Director for paaetor Operations Division of Reactor Licensing cc John W. Rowe, Esquire Isham, Lincoln & Beale Counselors at Law i One First National Plaza Distribution i Chicago, Illinois 60670 WDooly, DR 4

Compliance (3) i Mr. Charles Whitmore HShapar, OGC President and Qiairman NDube, DRL (5)

I Iowa-Illinois Gas and JRBuchanan, ORNL Electric Company PDR 206 East Second Avenue - Local PDR Davenport, Iowa 52801 A 6cket File DRL Reading Branch Reading ACRS (16)

DJSkovholt, DRL DLZiemann, DRL JIRiesland, DRL

[ TJCarter, DRL RMDiggs, DRL RBoyd, DRL RDeYoung, DRL RTedesco, DRL RVollmer, DRL omc> DRL, DRL cyg , DRL D_RL ,_, _

&I 4 ,,,

l

., ggs Q{'

, ,, . , and:s.lh_ _ DLZiemagg, . ,,pJ .yholt,,, _- f -

om > $/,,2 6/,72,,, ,

4/26/72 .,4 /g[/ 7,2,,, . ,,_4] /,72_ ,

Feem ABC-Sls (Rev.9 53) ABCM 0240

  • u. s oovsawm Pawtwo orect mt. dis ae s

. }

1