ML20195K141
| ML20195K141 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 06/16/1999 |
| From: | Anthony Mendiola NRC (Affiliation Not Assigned) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20195K146 | List: |
| References | |
| TAC-MA1605, TAC-MA1606, NUDOCS 9906220007 | |
| Download: ML20195K141 (3) | |
Text
n pctog k
UNITED STATES p
g P;
NUCLEAR REGULATORY COMMISSION WASHlWGTON, D.C. 3000H001
- g.
June 16,1999 Mr. Oliver D. Kingsley, President Nuclear Generation Group -
Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove, IL 60515'
SUBJECT:
SAFETY EVALUATION OF RELIEF REQUESTS FOR THE PUMP AND VALVE INSERVICE TESTING (IST) PROGRAM FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA1605 AND MA1606)
Dear Mr. Kingsley:
By a letter dated April 9,1998, Commonwealth Edison Company (the licensee) submitted three relief requests (RV-02B, RV-038, and RV-23A) requesting relief from certain inservice testing requirements of ASME Code Section XI. The staff reviewed the submittal and discussed the relief requests with the licensee on December 31,1998, and March 2,1999. Per discussion with NRC staff, the licensee reevaluated relief requests RV-02B and RV-038. Based on its j
review of industry practices and input from ASME Code experts, the licensee has determined
/[
that relief requests RV-02B and RV-03B are not required. Accordingly, in a letter dated April 29,1999, the licensee withdrew these two relief requests.
The staff has completed its review of the remaining relief request RV-23A and is providing the ff
/
attached safety evaluation.- The staff finds that the proposed functional verification test and high water level alarms in the control room provide reasonable assurance of operational readiness of the affected valves, and compliance with the Code requirements would result in a hardship without a compensating increase in the level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(s)(3)(ii), relief request RV 23A is authorized for the duration of the
' current 10 year IST interval.
The licensee should review NUREG-1482 where the staff discusses new diagnostic methods that have been developed to measure the stroke time or monitor the condition and
.s P*
9906220007 990616 PDR ADOCK 05000254 P
l O. D. Kingsley degradation of Solenoid Operated Valves, review the industry practice, and consider developing new diagnostic methods for use during the next 10-year IST interval. This completes the staff's review and closes TAC Nos. MA1605 and MA1606.
Sincerely, Original Signed By Anthony J. Mendiola, Section Chief, Section 2 Project Directorate lli Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265
Enclosure:
Safety Evaluation cc w/ encl: See next page Distribution 40eshatFNs PUBLIC PDill/2 r/f J. Zwolinski/S. Black C. Thomas /A. Mendiola C. Moore R. Pulsifer OGC, 015B18 ACRS, T2E26 G. Grant, Rlli C. Norsworthy (RCN)
T. Hiltz, EDO -
DOCUMENT NAME:A:\\MA1605RF
- SEE PREVIOUS CONCURRENCE Ta receive a copy of this document, Ind!cht Q f ix: "C" = Copy without enclosures *E" = Copy wit.; enclosures *N" = No copy OFFICE PM:LPD3
& LAVb3.,6 OGC*
SC.LPQs l
NAME RPULS!FER8/
DMCidlRE W SETurK 6MEl9CAO!A _
DATE 06/ // /99 06/ \\l /99 06/04/99 DS/ /l /99 OFFICIAL RECORD COPY i
t O. Kingsley Quad Cities Nuclear Power Station.
Commonwealth Edison Company Units 1 and 2 cc:
Commonwealth Edison Company Vice President - Law and Quad Cities Station Manager Regulatory Affairs 22710 206th Avenue North MidAmerican Energy Company Cordova, Illinois 61242-9740 One River Center Place 106 E. Second Street U.S. Nuclear Regulatory Commission P.O. Box 4350 Quad Cities Resident inspectors Office Davenport, Iowa 52808
. 22712 206th Avenue N.
Cordova, Illinois. 61242 Mr. David Helwig Senior Vice President Chairman Commonwealth Edison Company Rock Island County Board Executive Towers West lli
. of Supervisors 1400 Opus Place, Suite 900 1504 3rd Avenue Downers Grove, Illinois 60515 Rock Island County Office Bldg.
Rock Island, Illinois 61201 -
Mr. Gene H. Stanley PWR Vice President Illinois Department of Nuclear Safety Commonwealth Edison Company Office of Nuclear Facility Safety Executive Towers West 111 1035 Outer Park Drive 1400 Opus Place, Suite 900 Springfield, Illinois 62704 Downers Grove, Illinois 60515 i
Regional Administrator Mr. Christopher Crane U.S. NRC, Region ill BWR Vice President 801 Warrenville Road Commonwealth Edison Company Lisle, Illinois 60532-4351 Executive Towers West til 1400 Opus Place, Suite 900
- William D. Leach Downers Grove, Illinois 60515 Manager-Nuclear MidAmerican Energy Company Commonwealth Edison Company 907 Walnut Street-Site Vice President - Quad Cit'es P.O. Box 657 22710 206th Avenue North Des Moines, Iowa 50303 Cordova, Illinois 61242-9740 Mr. R. M. Krich Commonwealth Edison Company Vice President - Regulatory Services Reg. Affairs Manager-Quad Cities Commonwealth Edison Company 22710 206th Avenue N.
Executive Towers West lil Cordova, Illinois 61242-g740 1400 Opus Place, Suite 500 Downers Grovo, Illinois 60515 Ms. Pamela B. Stroebel Senior Vice President and General Counsel Document Control Desk-Licensing Commonwealth Edison Company Commonwealth Edison Company P.O. Box 767 1400 Opus Place, Suite 400 Chicago, Illinois 60690-0767 Downers Grove, Illinois 60515
~
--