1,j1 g mogk 36c/wh; 4
< q p ) ')
UNITED STATES '
~'
'.g NUCLEAR REGULATORY COMMISSION '
3(
y q
MSHWGM. D. C. 20555
%.V /[
August-16, ~ 1989 a.s i
X
' Docket Nos. 50-254.and 50-265
- Mr. Thomas 1 Kovach Nuclear Licensing Manager Commonwealth Edison. Company
. Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Kovach:
SUBJECT:
WITHDRAWAL OF LICENSE APPLICATION TO AMEND THE QUAD CITIES TECHNICAL SPECIFICATIONS FOR. RESIDUAL HEAT REMOVAL. SERVICE WATER SYSTEM (TAC NOS. 73265 AND 73266)
Re:
(a) Letter from R. Stols and T.E. Murley dated March 31, 1989-
-(b) Letter from R. Stols to T.E. Murley dated August 7, 1989 In reference (a), Commonwealth Edison Company (Ceco) rev.ision of. Appendix A. Technical ~ Specifications (TS) proposed a temporaryto Facilit Licenses DPR-29'and DPR-30 for Quad Cities Units 1 and 2.
The proposed amendment would allow cross-connecting independent. loops of the Residual Heat Removal:(RHR) Service Water System'. This operational provision was' deemed necessary in the event of further degradation of a crack identified in the "B" loop of the Unit 2 RHR Service Water System.
However, subsequent accelerated (weekly) surveillance of RHR Service Water System performance have provided no
- evidence.of further degradation, and the "B" loop continues to meet TS required flow.: Consequently, by reference. (b), CECO has requested that their application be withdrawn.
Based upon this request, we have terminated all task activities associated with reference (a)'and will close it out as a. licensing action. Although, we do recognize that unanticipated circumstances may warrant resubmittal under exigent or emergency conditions.
Sincerely, f f-Thierry 11. Ross, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects DFo/
l$R*28888!sggg,p
,),
q I*
m f
. c. v y.
N
'Mr. Thomas 11. Kovach Quad Cities Nuclear. Power Station Commonwealth. Edison Company Units 1 and 2 cc:
Mr. Stephen E. Shelten Vice President.
Iowa-Illinois Gas and Electric Company P. O. Box 4350 -
Davenport, Iowa S2808
' Michael !. Miller, Esq.
Sidley and Austin One'First National Plaza Chicago, Illinois 60603 Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North
'Cordova, Illinois 61242 Disident Inspector U. S. Nuclear Regulatory Commission 22712s206th Avenue North Cordova,. Illinois 61242-Chairman Rock' Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, Illinois 61201 Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 ~ 0 uter. Park Drive, Springfield, Illinois 62704 Regional Administrator, Region III U. S.~ Nuclear Regulatory Comission
'799 Roosevelt Road, Bldg. f4 Glen Ellyn, Illinois 60137 l
L l
l L-
j.:
,y, August 16, 1989
' Docket Nos. 50-254 and 50-265 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company Post Office Box 767 Chicago,. Illinois 60690
Dear Mr. Kovach:
SUBJECT:
WITHDRAWAL OF LICENSE APPLICATION TO AMEND THE QUA0 CITIES TECHNICAL SPECIFICATIONS FOR RESIDUAL HEAT REMOVAL SERVICE WATER SYSTEM (TAC N05. 73265 AND 73266)
Re:
(a) Letter from R. Stols and T.E. Murley dated March 31, 1989 (b) Letter from R. Stols to T.E. Murley dated August 7, 1989 In reference (a), Commonwealth Edison Company (Ceco) revision of Appendix A, Technical Specifications (TS) proposed a temporary to Facility Operating Licenses DPR-29 and DPR-30 for Quad Cities Units 1 and 2.
The proposed amendment would allow cross-connecting independent loops of the Residual Heat' Removal (RHR) Service Water System. This operational provision was deemed necessary in the event of further degradation of a crack identified in the "B" loop of the Unit 2 RHR Service Water System. However, subsequent accelerated (weekly)surveillancesofRHRServiceWaterSystemperformancehaveprovidedno evidence of further degradation, and the "B" loop continues to meet TS required flow. Consequently, by reference (b), CECO has requested that their application be withdrawn.
Based upon this request, we have terminated all task activities associated with reference (a) and will close it out as a licensing action. Although, we do recognize that unanticipated circumstances may warrant resubmittal under exigent or emergency conditions.
Sincerely, j
/ h Thierry M. Ross, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION Docket file ~
NRC & Local PDRs MVirgilio OGC EJordan BGrimes ACRS(10)
LLuther TRoss PShemanski PDIII-2I PDIII-2 fPDIII-2
. TRoss: bn LLuthe M y s PShemanski j
8/ /g/89
-8//4 /89 8/t6/89 l'.
)
_ _ _ _ __ _-_ _a