Text
.
s.
August'13, 1999
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
' ATTN: Regulatory Services
Executive Towers West lli
1400 Opus Place, Suite 500
Downers Grove, IL 60515 -
SUBJECT:
NRC INSPECTION REPORT 50-254/99012(DRS); 50-265/99012(DRS)
' Dear Mr. Kingsley:
On July 16,1999, the NRC completed the baseline problem identification and resolution
inspection of your Quad Cities Nuclear Generating Plant, Units 1 and 2. The results of this
inspection were discussed on July 16,1999, with Mr. J. P. Dimmette, Jr., and other members of
your staff.
The inspection was an examination of activities conducted under your license as they relate to
1
identification and resolution of problems and compliance with the Commission's rules and
regulations and with the conditions of your license. Within these areas, the inspection consisted
of a selected examination of procedures and representative records, observation of activities,
and interviews with personnel. Specifically, this inspection focused on the adequacy and -
- implementation of the Quad Cities corrective action program.
Although no safety significant problems were identified, the NRC inspectors identifed several
issues which were characterized as having low risk significance. These issues were
documented and were entered into the plant corrective action program. Of the three issues
identified, two were determined to be violations of NRC requirements, but because of the low
safety significance the violations are not cited. if you contest these non-cited violations, you
should provide a response within 30 days of the date of this inspection report. with the basis
- for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region lil; the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-001.
,
,
i
9908190205 990813
ADOCK 05000254
G
-
-
_
.
-
,
.
,.
L
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules and Practices," a copy of this letter, the
enclosure, and the response (if provided) will be placed in the NRC Public Document Room
(PDR).~-
We will gladly discuss any questions you have concerning the inspection.
Sincerely,
Original /s/ Ronald Gardner for
John M. Jacobson, Chief
Mechanical Engineering Branch
Division of Reactor Safety
Docket Nos. 50-254; 50-265
Enclosure:
Inspection Report 50-254/99012(DRS);
50-265/99012(DRS)
j
cc w/ encl:
D. Helwig, Senior Vice President, Nuclear Services
C. Crane, Senior Vice President, Nuclear Operations
H. Stanley, Vice President, Nuclear Operations
R. Krich, Vice President, Regulatory Services
DCD - Licensing
J.' Dimmette, Jr., Site Vice President .
G. Bames, Quad Cities Station Manager
C. Peterson, Regulatory Affairs Manager
M. Aguilar, Assistant Attomey General
State Liaison Officer, State of Illinois
State Liaison Officer, State of Iowa
Chairman, Illinois Commerce Commission
W. Leech, Manager of Nuclear
MidAmerican Energy Company
See Attached Distnbution
DOCUMENT NAME: G:DRS\\QUA99012.WPD
v.
.
.e m.
_ men.m m w c .c o m e .n.ee- - r c . . ~ u.nm. .
,e. m e .
OFFICE
Rll!
_,,lj
Rlli
6
Rlli
l
_,,
l>
NAME.
AWalkerW/M 'MRing M/L.-
JJacobson h (
,
'
DATE-
08//J/99
08//799
08/P/99
OFFFCIAL RECORD COPY
I
.
o.
.
O. Kingsley
-3-
Distribution:
AJM (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Dyer, Rill w/enci
. J. Caldwell, Rlll w/enci
B. Clayton, Rill w/ encl
SRI Quad Cities w/enci
DRP w/enci
DRS w/ enc!
DRS Branch Chiefs
Rlll PRR w/enci
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
,
190021