MONTHYEARML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217H6251999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for MR Kahn,Aj Mclaughlin,De Montgomery & Kr Murphy Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC from 396 Encl.Proprietary Info Withheld ML20217H6341999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for Kh Curran,Lm Gerlach,Rc Weber & Bt Rhodes Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC Form 396 Encl.Proprietary Info Withheld ML20217F4301999-10-14014 October 1999 Responds to 991012 Rai,Based on 991001 Telcon Re Suppl to Request for TS Change to Revise MCPR Safety Limit & Add Approved Siemens Topical Rept for LaSalle County Station, Unit 1 ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217D3191999-10-12012 October 1999 Submits Request for Addl Info Re Licensee 990707 Proposed License Amend to Revise Min Critical Power Ratio.Listed Questions Were Discussed with Util in 991001 Telcon ML20217C1671999-10-0808 October 1999 Provides Suppl to RAI for Approval of Unreviewed Safety Question Re Assessment of Certain safety-related Concrete Block Walls at LaSalle County Station,Units 1 & 2 ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations ML20217A7601999-10-0606 October 1999 Forwards Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 05000373/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl1999-10-0404 October 1999 Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl ML20212M0931999-10-0404 October 1999 Refers to 990922-23 Meeting Conducted by Region II at LaSalle Nuclear Power Station.Purpose of Visit,To Meet with Licensee Risk Mgt Staff to Discuss Util Initiatives in Risk Area & to Establish Dialog Between SRAs & Risk Mgt Staff ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A6201999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix & Insp Plan Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212E7171999-09-22022 September 1999 Forwards RAI Re Requesting Approval of License Amend to Use Different Methodology & Acceptance Criteria for Reassessment of Certain Masonry Walls Subjected to Transient HELB Pressurization Loads ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 05000374/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl1999-09-20020 September 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20212C0591999-09-17017 September 1999 Informs That NRC Reviewed Licensee Justifications for Deviations from NEDO-31558 & Determined That Justifications acceptable.Post-accident Neutron Flux Monitoring Instrumentation Acceptable Alternative to Reg Guide 1.97 A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20212A3581999-09-13013 September 1999 Confirms That Fuel MCPR Data for LaSalle County Station,Unit 1,Cyle 9,sent by Ltr Meets Condition 2,as Stated in 970509 NRC Ltr ML20211Q9911999-09-10010 September 1999 Informs That License SOP-4048-4,for Wp Sly May Be Terminated Due to Individual Retiring ML20212A1141999-09-10010 September 1999 Forwards RAI Re Licensee 990519 Amend Request,Which Proposed to Relocate Chemistry TSs from TS to licensee-controlled Documents.Response Requested by 990930,so That Amend May Be Issued to Support Upcoming Unit 1 Refueling Outage ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217H6341999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for Kh Curran,Lm Gerlach,Rc Weber & Bt Rhodes Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC Form 396 Encl.Proprietary Info Withheld ML20217H6251999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for MR Kahn,Aj Mclaughlin,De Montgomery & Kr Murphy Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC from 396 Encl.Proprietary Info Withheld ML20217F4301999-10-14014 October 1999 Responds to 991012 Rai,Based on 991001 Telcon Re Suppl to Request for TS Change to Revise MCPR Safety Limit & Add Approved Siemens Topical Rept for LaSalle County Station, Unit 1 ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217C1671999-10-0808 October 1999 Provides Suppl to RAI for Approval of Unreviewed Safety Question Re Assessment of Certain safety-related Concrete Block Walls at LaSalle County Station,Units 1 & 2 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee 05000373/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl1999-10-0404 October 1999 Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage 05000374/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl1999-09-20020 September 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20211Q9911999-09-10010 September 1999 Informs That License SOP-4048-4,for Wp Sly May Be Terminated Due to Individual Retiring ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed 05000374/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl1999-09-0303 September 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl ML20211M1151999-08-31031 August 1999 Requests That Following Eleven Individuals Take BWR Gfes of Written Operator Licensing Exam to Be Administered on 991006 ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1831999-08-27027 August 1999 Provides Addl Clarification of Proposed Refueling Practices Under Proposed Core Alterations Definition Re 990813 Application for Amend to TS ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition 05000373/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Listed1999-07-23023 July 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Listed SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210D2601999-07-16016 July 1999 Forwards Revised Byron Unit 1 Cycle 10 COLR in ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA 1999-09-08
[Table view] |
Text
Onnmonwealth Edt9m Compey 1100 Opus Place l
Downers Gnne, IL 60515-5701 i
August 27,1999 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN-456 and STN 50-457 Byron Station, Units I and 2 i
Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN-454 and STN 50-455 Dresden Nuclear Power Station, Units 1,2, and 3 Facility Operating License Nos. DPR-2, DPR-19 and DPR-25 NRC Docket Nos.50-010. 50-237 and 50-249 LaSalle County Nuclear Power Station, Units 1 and 2 Facility Operating Licenses Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Quad Cities Nuclear Power Station, Units I and 2 Facility Operating Licenses Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Zion Nuclear Power Station, Units 1 and 2 Facility Operating Licenses Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304
Subject:
Fitness for Duty Performance Data Reports - January through June,1999 In accordance with 10 CFR 26.71(d), Commonwealth Edison (Comed) Company is providing the compiled fitness-for-duty program performance data for each of our nuclear power stations and the corporate support employees within the scope of the rule for the six month period ending June 30,1999. As required by 10 CFR 26.71(d),
n 4 c.
4 C t
9908310165 990827 q{
g DR ADOCK 050 0
f l
A Unicom Company
1
' August 27,1999 U.S. Nuclear Regulatory Commission Page 2 management actions and reported events are also provided as attachments. The information is being provided as required within 60 days of June 30,1999, i.e., by August 29,1999. This performance data is reported on the January 1992 revised Fitness.
For Duty (FFD) Performance Data Form developed by Nuclear Management and Resources Council (NUMARC).
Please direct any questions regarding this matter to Ms. Marcia Lesniak at 630/663-6484.
Respectfully, i
R. M. Kri Vice President - Regulatory Services Attachments cc:
Regional Administrator - NRC Region III NRC Senior Resident inspector - Braidwood Station NRC Senior Resident Inspector - Byron Station NRC Senior Resident Inspector - Dresden Nuclear Power Station
' NRC Senior Resident Inspector - LaSalle County Nuclear Power Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Senior Resident inspector - Zion Nuclear Power Station l
GANLAMLLsTA\\Ffd99-05Ax
bec:
Project Managers-NRR Office of Nuclear Facility Safety -IDNS Manager of Energy Practice - Winston and Strawn Directors, Licensing and Compliance - Comed Vice President, Regulatory Services - Comed Comed Document Control Desk Licensing (Hard Copy)
Comed Document Control Desk Licensing (Electronic Copy)
J. C. Papaleo i
l G:\\NIA\\ALLSTA\\Ffd9945. doc
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 Comed. a Unicom Company June 30,1999 Company Six Months Ending BRAIDWOOD NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC)
.04 Testing Results Licensee Long -Term Short -Term Contractor Employees Contractor Av: rage with 944 103 423 Un:scorted Access Number Number Number Number Number Number -
Categories Tested Positive Tested Positive Tested Positive 61 1
49 2
926 9
Pro-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 3
1 0
0 3
1 238 0
26 0
110 0
Rtndom 2
0 0
0 27 0
Follow-up 6
0 0
0 17 1
Oth:r Pts-Employment 7
0 0
0 0
0 317 2
75 2
1083 11
N O
IT A
TS R
t s
E e
r W
T e
t a
O o
0 0
0 0
t e
P T
ar sg R
la s
t r s
t A
u l
s o E
f u
eTl e /m e
s L
R.
e CU ss ivg r
t n
N o
ei it l
s0 t a o0 h
D o
1 1
4 6
t t P1 a
r O
c od l
p O
A ee W
rh ot D
e t i, IA in r
m d
e/
R i
d g 4
l r
B c
n y
0 0
0 0
o c
0 S
n In 5 E
e f
5
. o h
C l
C P
N He A
Tv e
T s
ot rl S
e f n B
n dlog ld e
i U
m o
n S
a 0
0 0
0 hi h
t st s
r C
e es e
h r
er IF I
p h e vh oT t r C
m o
b e
s E
A vm a 'n P
it r
iss o o S
o d' s
t R
se pE adi a
0 0
0 0
im sE O
t
/m o sh t
F ip S
O gC el t
T nr Ta o
e S
0f ew v
E e
5 d in t
T n
an io s
i d )a om E
a 1
1 2
4 V
c el Pm o
T nm ll o t
I I
C.
e/
AC g
S mn O
a 4
4 le0 P
n p0 a
1 D
u 0
0 im(
E j
i l
r Oe M
a v
Ce R
M 5
5 El I
s F
Cd N
e w O
s 0i lo
,i f
C e
9 clo e
9 ef F
y 1 ps o
s a O
lp Ce 1
N r
m eRv W
E nr ms bNo s
r r
b O
e et e o mSa o
c Tt eU D
e T-c d
a a
v K
s ee r
t r o
A n
gt r t t
h r e
n n on Nt E
c o o h o r po R
i LC SC n o L
B Of er
BRAIDWOOD NUCLEAR POWER STATION Manaaement Actions and Sanctions Fifteen positive tests resulted in the denial or revocation of unescorted access. Due to pre-access testing for the Braidwood Station, Dresden Nuclear Power Station and LaSalle County Station being performed at a centralized location, six of the twelve positive pre-access tests conducted at Braidwood Station were for the Dresden Nuclear Power Station and LaSalle County Station.
Events Reported A 200 ml bottle of Whiskey was found unattended in the Auxiliary Building, a vital area, with approximately one teaspoon ofliquid on January 29,1999. A 24-hour reportable event notification was made to the NRC Operations Center on January 29,1999 in accordance with 10CFR26.73(a)(2)(iii).
A For Cause test was conducted on a short-term contractor supervisor on April 29,1999 that resulted in a positive alcohol test and in the denial and revocation of unescorted access. A 24-hour reportable event notification was made to the NRC Operations Center on April 29, 1999 in accordance with 10CFR26.73(a)(2).
l 1
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 Comed. a Unicom Company June 30,1999 Company Six Months Ending BYRON NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC)
.04 Tcsting Results Licensee Long -Term Short -Term Contractor Employees -
Contractor Av: rage with 906 93 147 Unescorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive Tested Positive 54 0
7 0
863 11 Pr:-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 1
0 0
0 1
0 233 0
24 0
80 0
R:ndom 0
0 0
0 14 0
Follow-up 9
0 0
0 23 2
Oth:r Pra-Employment 0
0 0
0 0
0 297 0
31 0
981 13
N O
IT ts A
e T
T 0
0 0
0 S
o R
T y
E la W
s s
[*
t u
O f
u l
P e
s
'd' R
e R
r y*
t A
ss l
E o
ei
[g L
h t a C
o 0
0 4
4 t t a r
c od U
l N
A pee rh N
ot O
e t
l, n
r m
R id e/
3 Y
d g il B
c r
n y
0 0
0 0
o 0 c
n S
n 5
7 I
E e
.fo h
Cl C
P N
He A
Tve T
s ot rl S
e f n ld B
n d e o
i U
m og h
l S
a 0
0 0
0 rn hi s
C e
st e
t es r
h r
eh IF p
h e vT I
t r o
C m
e o s
b 'n E
A vm a
P r o i
S it s s
os o d' id R
s t
e pE aE O
m s
ta 0
0 0
0 i
t h F
mo i
slt p
/
S O
gC ea T
nr Te S
0f e w o
v n E
e 5 d i o T
n an tism i
E a
0 0
2 2
d )a om V
c el Po o
e /m ll C t
IT C
n g
A IS mn O
a:
3 3
e0 P
n lp0 a
E i
0 0
im(
D u
1 j
l r
M a
Oev R
M 7
7 Ce.
El IF s
Cd N
e w
,io O
0f l
iclo C
e 9
e 9ef F
y 1 ps o
,s a O
lp 1 Ce N
m ms ms bNo rRv W
E e
r r r
r b
O eo e o mSa e
Tt Tt eU D
e c
c d
K s
- a a
v
^
o ee r
t r A
n gt r t t
h r e
n n on Nt o E.
c o o h o r p R
L LC SC n o i
B Of er
BYRON NUCLEAR POWER STATION l
Manaaement Actions and Sanctions Thirteen positive tests resulted in the denial or revocation of unescorted access. One short-term contractor was denied unescorted access for having alcohol on the property in his vehicle because of the Fitness For Duty policy requirement of no alcohol on Comed property.
Events Reported There were no 24-hour reportable events during this reporting period.
I l
I i
i.
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 l
I Comed. a Unicom Company June 30,1999 Company Six Months Ending DRESDEN NUCLEAR POWER STATION l
Location l
l Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC)
.04 Tcsting Results.
Licensee Long -Term Short -Term Contractor Employees.
Contractor Av rage with 908 99 613 Un:scorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive Tested Positive 44 0
12 0
1530 19 Prs-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 2
0 0
0 2
1 236 0
25 0
158 0
3 ilandom 6
0 0
0 21 1
Follow-up 0
0 0
0 23 1
Oth;r Prs-Employment 10 0
0 0
0 0
TcW 298 0
37 0
1734 22
N O
I T
- A T
t s
S e
R T
r e
E o
t 0
0 1
1 a
W T
ta e l
r O
as s
sg P
t t
u s
r f
lu e o R
e s
Ti A
R e
m r
E e/
t L
ss ivg C
o ei it n l
U h
t a s0 o0 o
0 0
3 3
t t r
a N
lc od P1 N
A p
ee E
rh DS e.
ot, t im E
in r
d e/
3 R
i r
D l
d g c
n y
0 0
0 0
o 0 h
C l
c n
0 S
n 5
I 1
E e
.fo C
P N
He A
Tve T
s ot rl S
e f n l
d B
n d e o
U i
m log h
n S
a 0
0 0
0 hi s
r t
st e
C e
es r
eh h
r IF I
p h e vT t r o
C m
o b 's e
E A
vm an P
it r o is 's os S
R s
od i
t d e
pE aE O
m s
t F
ia 0
0 0
0 imo t h slt p
/
S O
gC ea T
nr Te S
0f e w o
E e
5 d i n v o T
n an tism E
i d )a om a
0 0
9 9
V c
el P o o
l C
T C
nm lA t
I e/
I g
S mn O
a 3
3 e0 P
~n lp0 a
D u
m1 E
i 0
0 l
(
i j
r Oe M
a 0
0 v
R M
Ce 1
1 El I
s F
Cdew N
,io O
s 0i l
f C
e 9 cl o e
9 ef F
y 1 ps o
,s a O
lp Ce 1
N r
m eRv W
E nr ms bNo s
r r
b O
e et e o mSa o
c Tt eU D
e T-c L
d a
a K
s v
A o ee r
t r A
n gt r t t
e n n on T
Nt o h r E
c o o h o O
r n
p R
L LC SC T
o i
B Of er
i i
l DRESDEN NUCLEAR POWER STATION i
Manaaement Actions and Sanctions Twenty-two positive tests resulted in the denial or revocation of unescorted access. One short-term contractor was denied unescorted access due to providing an adulterated specimen. One short-term contractor refused to test and was denied unescorted access. One short-term contractor was denied unescorted access due to a violation of the Fitness For Duty policy requirement concerning abstinence from alcohol for at least five hours prior to reporting to work. The odor of alcohol was detected and a For Cause test was conducted with negative results. However, during testing the individual made a statement concerning having a drink on the way to work.
Events Reported s
There were no 24-hour reportable events during this reporting period.
l l
l 1
i l
I
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 Comed. a Unicom Company June 30.1999 Company Six Months Ending LASALLE NUCLEAR POWER STATION Location l
Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code) l Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC)
.04 Testing Results Licensee Long -Term Short -Term Contractor l
Employees Contractor Av rage with 976 97 979 Un scorted Access Number Number Number-
' Number Number Number Categories Tested Positive Tested Positive Tested Positive 2
0 0
0 19 1
Prs-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 1
0 1
0 1
1 l
i 252 0
25 0
252 2
l Random l
4 0
0 0
25 0
Follow-up l
2 0
0 0
25 0
l Oth r Pre-Employment 1
0 0
0 0
0 l
TcW 262 0
26 0
322 4
l
REW t
O se 0
0 0
0 P
T R
o e
r A
T.
ta E
l t
L a
a e r
s C
u s
sg t
t U
f lu e o r
s e,
N R
s Tl Y
e m
r T
e/
t vg N
l _
ss it n o
ei i
U h
t a s0 O
o 0
0 1
1 t t o0 a
r C
c od P1 lA_
p E
ee L
rh t L
o,
e t
l A
n r
m S
d e/
0 i
A d g i
L lc r
n y
0 0
0 0
o 0 c
n S
n I
5 1
E e
.fo h
C l
C P
N He A
Tve T
s ot rl S
e f n B
n d e ld U
i log o
m n
S a
0 0
0 0
hi h
t st s
r C
e_
es e
I h
r er F
I p
h e vh oT t r C
m o
b e
s E
A ivm a 'n P
r ts 's o o i
S t is R
s od e
pE ad im sE O
t F
ia 0
0 0
0 mo sh t
p
/
t S
O gC el T
nr Ta o
e S
0f e w v
E e
5 d in T
n an io t
s i
E a
0 0
2 d )a om V
c el Pm o
I C
nm l
o t
IT l
e/g AC S
mn O
a 0
0 0
e0 P
n lp0 a
D u
0 im1
(
E j
i l
r Oe M
a v
R Ce.
I M 0 1
1 El F
s Cdew N
,io O
s 0i f C
e 9 cllo e
9 ef F
y 1 ps o
,s a O
lp Ce 1
N rRv m
ms nr W
E e
s bNo r r b
O o
D N e
eo et mSa e
Tt Tc eU c
s a
- a L
d KO v ee A
o r
t r I
n gt r t AT t
e n n on T
Nt o h r EA c
o o h o O
r p RT L
LC SC T
n o i
BS Of er
LASALLE COUNTY NUCLEAR POWER STATION Manaaement Actions and Sanctions Four positive tests resulted in the denial or revocation of unescorted access.
j Events Reported There were no 24-hour reportable events during this reporting period.
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26
_ _ Comed. a Unicom Company June 30.1999 Company Six Months Ending QUAD CITIES NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 M::rijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opi:;tes 300/300 Alcohol (% BAC)
.04 8
Testing Results Licensee Long -Tenn Short -Term Contractor Employees Contractor Av: rage with 896 87 172 Un:scorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive Tested Positive 18 0
3 0
198 3
Prs-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 0
0 0
0 2
0 230 0
22 0
48 0
Random 1
0 0
0 2
0 Follow-up 9
0 0
0 1
0 Oth:r Pr> Employment 28 0
0 0
0 0
ctal 286 0
25 0
251 3
a N
O IT ATS R
t E
se r
W T.
e 0
0 0
t O
o a
t P
T a e r
l R
a s
sg t
A s
lt r
s o d
u e
E f
s Tl L
e e
m C
R r
e/
t ivg U
ss N
l ei it n o
t a s0 o0 S
h t tr a P1 E
o 0
0 0
c od I
p T
A ee l
I r h C
t o
D t
e i
m r
A in e/
U d
d g 1
Q i
r n
lc o
y 0
0 0
0 n
S c
I 5
n
.f 2
E e
o C
h C
l N
P He A
Tv e
T rl S
s ot e
f n B
n d e d
US m
l g
l i
o o
n a
hi h
t 0
0 0
st s
r C
e I
e es er r
F h
h e vh I
p oT t r C
m e
o b
s E
A vm a 'n P
i t
r is 's o o S
m s
R s
od t i e
pE ad m
O m
sE t
lmo sh a
0 0
0 t
F ip
/gC el t S
O T
nr Ta o
e S
0f e w v
E e
5 d in T
n an io ts i
d )a om E
a 0
0 1
V c
el Pm I
o m
ll t
o T
I C
ne/g AC S
mn O
a 0
1 e0 P
n lp0 a
1 D
u 0
im(
E ij l
r M
a Oev R
Ce FI M
0 2
2 El
.s Cdew N
O s
0i lo
,i f C
e 9 clo e
9 ef F
y 1 ps o
, s a O
lp Ce 1
N m
eRv r
W E
nr ns bNo s
r b
O o
e o mSa e
et c Tt D
e T-L eU c
d a
a K
s v
A o ee r
t r A
n gt r t ht e
n n on T
Nt o r
E c
o o h o O
r p R
L LC SC T
i n o B
Of er i
QUAD CITIES NUCLEAR POWER STATION Manaaement Actions and Sanctions Three positiveiests resulted in the denial or revocation of unescorted access.
Events Reported There were no 24-hour reportable events during this reporting period.
l
i FITNESS FOR DUTY PERFORMANCE DATA l
PERSONNEL SUBJECT TO 10CFR 26 Comed. a Unicom Company June 30,1999___
Company Six Months Ending ZION NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opintes 300/300 Alcohol (% BAC)
.04 Testing Results Licensee Long -Term Short -Term Contractor Employees Contractor -
l Av: rage with 193 48 43 Un:scorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive Tested Positive j
2 0
0 0
0 0
Prs-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 0
0 0
0 0
0 49 0
17 0
12 0
R ndom 0
0 0
0 0
0 Follow-up 0
0 1
0 0
0 Oth:r Pr:-Employment 0
0 0
0 0
0 51 0
18 0
12 0
N t
O se IT l
0 0
0 e
r A
o t
T T
a t
S l
a e r
R as s
s g E
p lt t
r s
u e o W
e s
Ti O
R e
e /m r
P l,
t v g ss i n R
o ei is0 t
A h
t a o0 E
o 0
0 0
t tr a L
c od P1 l
C A
pee U
rh N
ot, e
t lm N
in r
O d
e/
0 d g i
I l
r Z
c n
y 0
0 0
o 0
~c n
S n
5 0
I E
e
.f o
h C
C P
N Hel A
Tve T
s ot rl S
e f n B
n d
U m
ld e lo i
g o n S
a 0
0 0
hi h
t st s
r C
e es e
I h
r er F
p h e vh oT I
t r C
m o
b e
s EP
^A vm a 'n i
r S
it s s
o o o d' s
j R
s t i e
pE ad O
m sE ta 0
0 0
imo sh t
F ip
/
t S
O gC el T
nr Ta o
e S
0f e w
?
v E
e 5 d in T
n an io ts i
E a
0 0
0 d )a om V
c el Pm o
T C
nm LAC t
l o
I I
e/g S
mn O
a_
e0 P
n lp0 a
m(
D u
0 0
0 l
1 E
i i
jr M
a Oev I
M Ce R
El F
s.
Cd N
e w
,io O
s 0i f l
C e
9 cl o e
9 ef v
F y
1 ps o
,s a O
lp 1
Ce N
m eRv r
W E
mrs nrs bNob O
o e o mSa r
e et D
e Tc Tt eU c
L d
K s
- a a
v A
o ee r
t r A
n gt r t t
e n n on T
Nt o h
r E
c o o h o O
r p
R i
n o L
LC SC T
B Of e r
l ZION NUCLEAR POWER STATION Manaaement Actions and Sanctions No positive tests reported.
Events Reported There were no 24-hour reportable events during this reporting period.
J
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 Comed. a Unicom Company June 30.1999 Company Six Months Ending CORPORATE NUCLEAR OPERATIONS Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/mi)
/
/
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC)
.04 T; sting Results Licensee L ng -Term Short -Term Contractor Employees Contractor Av: rage with 576 0
0 Un:scorted Access Number Number -
Number Number Number Number C tegories Tested Positive Tested Positive Tested Positive 15 0
0 0
6 0
Prs-Access Post Accident 0
0 0
0 0
0 For Cause E )bserved Behavior 1
0 0
0 0
0 142 0
0 0
7 0
Random 4
1 0
0 0
0 Follow-up 0
0 0
0 5
0 Oth:r Pre-Employment 17 0
0 0
0 0
Tctal 179 1
0 0
18 0
S N
O IT t
A s
R eT EP o
0 0
0 0
O T
r l
e R
a t
s s
a t
A u
l t
f u
a e r
E e
s sg L
R e
t r
r s
C t
e o U
ss Ti l
N o
ei m
h t a e/
E o
0 0
0 0
r a ivg t t T
lc od it n A
A p
s0 R
ee o0 rh P1 O
ot, P
'e t
l n
m R
i r
O d
e/
d g i
l r
C c
n y
0 0
0 0
o 0 1
c n
S n
I 5
E e
.f h
o C
C l
P N
He 3
A Tve T
s ot rl S
e f n B
n d e U
im logn hi d
S a
0 0
0 0
t st l
r o
C e
es h
h r
IF s
I p
h e e
t r er C
m o
e vh E
A ivm oT P
i b
t S
s 's s
R s
od a 'n r
e pE o o t is O
m ta 0
0 0
0 i
mo ad F
i S
O gC sE p
/
t T
nr sht o
el S
0f Ta E
e 5 d e
T n
an ew v
i d )a in E
a 0
0 0
0 tio V
c el s
o m
om t
IT C
n I
e/
Pm g
l S
mn l
o O
'a 4
e0 AC P
n lp0 a
m(
D u
0 0
1 E
i j
i l
r Oe M
a v
Ce R
M 1
1 El IF s
Cdew N
,io O
s 0f l
C e
9 icl o
e 9 ef F
y 1 ps o
,s a O
lp 1
N Ce m
eRv r
W E
ms ms bNo r
r r
b O
o e o mSa r
e et D
e Tc Tt eU c
L d
K s
- a a
v A
o ee r
t r A
n gt r t t
e n n on T
Nt o h r E
c o o h o O
r p R
L LC SC T
i n o B
Of er
?
l CORPORATE NUCLEAR OPERATIONS e
l Manaaement Actions and Sanctions One positive test resulted in the denial of unescorted access for a licensee employee.
l i
Four hundred five (405) negative quality control specimens tested on-site were submitted to the Substance Abuse and Mental Health Services Administration laboratory during this period.
Four hundred four (404) specimens were confirmed negative by the laboratory.
One specimen confirmed positive at the laboratory following Gas Chromatography / Mass Spectrometry testing. The initial screening results for the specimen were negative, however, just below the cutoff concentration. When a negative result is reported from a urine drug screen, it is an indication of one of the following:
- 1. The specimen is consistent with a true negative, i.e. no drug or metabolite present.
- 2. Drug or metabolite in the specimen is concentrated below the cutoff.
For the purposes of the Fitness For Duty Drug Testing Program, both situations are considered negative.
The Laboratory Forensic Testing Director was provided on-site screening information. She noted that when this specimen was tested on-site, it was properly reported as a negative test, although it was just under the cutoff. The Laboratory Director concluded the overall accuracy of the on-site specimen-screening program is acceptable under instrument accuracy standards. The false negative test result may be attributed to a statistical variability of on-site and laboratory test equipment. A variation around the threshold or cutoff can be expected at an onsite testing facility or at a laboratory facility. Statistically, specimens that are right at the threshold level may screen both above and below the cutoff, if testing is repeated.
Currently, all specimens submitted to the laboratory, including quality control negatives are screened for adulterants at the laboratory. There has not been a nuclear specimen positive for adulterants since January,1999.
Blind performance testing vias conducted at a rate of ten percent. Thirty-four (34) specimens were submitted to the laboratory. All results were reported correctly.
Fifty-eight (58) positive test results were confirmed positive by the Medical Review Officer.
Additionally, three positive specimens were reanalyzed and re-confirmed positive.
Events Reported There were no 24-hour reportable events during the period.