ML20246C821

From kanterella
Jump to navigation Jump to search
Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl
ML20246C821
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 08/11/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST UTILITIES
References
NUDOCS 8908250141
Download: ML20246C821 (3)


Text

_-

3c,g e

y, 11 AUG 1989 Docket Nos. 50-213 50-245 50-336 50-423 Northeast Utilities

. ATTN: Mr. John F. Opeka Executive Vice President Engineering and Operations P. O. Box 270 Hartford, Connecticut 06141-0270 Gentlemen:

This ietter ccnfirms our conversation of August 8,1989, in which you agreed that your organization would participate in the Nuclear Regulatory Commission's (NRC)' Regulatory Impact Survey on October 23, 1989. We dppreciate your Cooperation in this effort.

Information regarding this survey'is provided below.

The NRC has received feedback from nuclear utilities and nuclear utility organizations that NRC generic and site specific activities may be moving in a direction such that the desired safety effects may not be realized. As a result of this feedback, the NRC plans to conduct a survey of licensee staff members representing several organizational elements and levels at several utilities throughout the ration. The feecoack from licensee staff members will be evaluated to determine what changes, if any, should be made _ to the NRC's regulatory approach to enhancing the safe operation of nuclear power plants.

The survey will be conducted during September through November 1989 by a team of approximately five senior NRC managers from the Office of Nuclear Reactor Regulatior., Office for Analysis and Evaluation of Operational Data and the Regional Offices. Mr. A. Bert Davis, Region III Administrator, will lead the overall effort.

4 The meeting with your organization will be held at Berlin, Connecticut..

The schedule and general discussion groups are.shown in the enclosure. We desire that members of your organization discuss, without reservation er limitations, their views on NRC generic and site specific activities and how NRC activities may be affected by the activities of other organizations such as INPO, states, and insurance companies.

Problems and issues identified will not be directly associated with the individuals or with your company.

Please provide the name and phone r. umber of an individual within your organization that we can contact in case of questions concerning meeting logistics. This information should be provided by telephone to Cindy Pederson, Region III, at (312)790-5540 by August 18, 1989.

l OFFICIAL RECORD COPY NUSCO REGULATORY IMPACT SURVEY -

o(

0001.0.0 3

8908250141 890811 08/11/89 i t PDR ADOCK 05000213 P

PDC 1

. =.

3

s. -

'l :

h;Y LNNt'heast'NuclearEnergyCompany 2

i y =AUG 1989 r

L:

?

Again,;-we appreciate' your willingness to cooperate in this important

' initiative. We will. gladly discuss any. questions you have concerning this p

survey.

Sincerely.,

l' M einn1' Signed By E1LLIAg y..;yogggyL-William T. Russell Regional Administrator Enclosure-As stated cc w/ encl:.

E. JJ Mroczka,. Senior Vice President - Nuclear S.

E.. Scace, Station Superintendent D. B. Miller, Station Superintendent D. 0. Nordquist, Director of.. Quality Services

- R. M. Kacich,.. Manager, Generation Facilities Licensing W. D.-Romberg, Vice' President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR) 1

. Local' Public. Document Room (LPDR)

Nuclear Safety Information Center (NSIC)-

NRC Resident: Inspector State of Connecticut

' A. Bert Davis,' Region III bec w/ enc 1:-

' Region I Docket Room (with concurrences)

E. Wenzinger, DRP D. Haverkamp, DRP N. Dudley, DRP W. Raymond, SRI, Millstone 1&2

.T. Shediosky, SRI, Haddam Neck l

J. Stolz, PD, HRR i

J. Dyer, EDO I

J P

RI:DRA R

'e/grm f,,Wenzinger Martin Russell

)/89.

(C ffapg glh

- 0FFICIAL RECORD COPY NUSCO REGULATORY IMPACT SURVEY -

0002.0.0 08/11/89

_ = -.

A' a..

NRC REGULATORY IMPACT SURVEY October 23, 1989 TIME DISCUSSION GROUP *

.8:30 a.m. - 10:00 a.ni.

Senior Reactor Operators, Reactor Operators, Shift Technical-Advisors, Shift Foreman, and Operational Supervisors 10:00 a.m. - 11:30 a.m.

Plant QA Engineers, Maintenance Engineers, Nuclear Engineers, Electrical Engineers, and Health Physicist 11:30 a.m. - 12:30 p.m.

Lunch 12:30 p.m. - 2:00 p.m.

Corporate Licensing Engineer, Corporate QA Manager, Manager of Planning and Scheduling, Project Engineer, and Corporate Training Officer 2:00 p.m. - 3:30 p.m.

Managers of Operations, i

Construction, Engineering, Maintenance, Design, Radiation Protection, Security and Emergency Preparedness 3:30 p.m. - 5:00 p.m.

Executive Vice President, Senior Vice President, and cther corporate personnel i

l 1

  • The organizational titles listed are gen 2ral in nature and may not be used at your facility. Please alter, as necessary.

)

)

1 0FFICIAL RECORD COPY NUSCO REGULATORY IMPACT SURVEY -

(

0003.0.0 08/11/89 l

- - - - - "