7prill 9f: 1999
.,
Mr. Oliver D.' Kingsley .
.
'
President, Nuclear Generation Group
~ Commonwealth Edison Company .
-
ATTN: Regulatory Services)
Executive Towers West lli
1400 Opus Place, Suite 500
Downers Grove,IL 60515
,
SUBJECT:
QUAD CITIES INSPECTION REPORT 50-254/99003(DRS); 50-265/99003(DRS);
Dear Mr. Kingsley:
This refers to the inspection conducted March 8 through 12,1999, at the Quad Cities Nuclear ~
Power Station. The purposes of the inspection were to evaluate the program and procedures
regarding maintenance of electrical power circuit breakers, to assess corrective actions for-
previously identified maintenance problems, and to review maintenance related materiel-
condition problems.
The circuit breaker maintenance program and procedures appeared acceptable with a few
minor exceptions related to 480V breakers. Corrective actions, in general, were appropriate and
timely. Self assessments were thorough and sufficiently self-critical. Longstanding materiel ~
condition issues continue to be a problem; however, progress had been made in some areas,
such as improving the reliability of reactor recirculation pump seals and recent management
initiatives to make restoration of offgas trains for both units a priority.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be 'placed in the NRC Public Document Room.
Sincerely,
Original /s/ Steven Reynolds
Steven A. Reynolds, Deputy Director
Division of Reactor Safety
Docket Nos: 50-254;50-265
Enclosure:
Inspection Report 50-254/99003(DRS);
' 50-265/99003(DRS)
' See Attached Distribution
DOCUMENT NAME: G:\\ QUAD \\QUA99003.DRS '
.,. ~ .em m ae m .ac
uso.c.ca m .a.e,aw r.cm a. w.m v w
OFFICE
Rlli
R!ll-
Rlli
Rill *
M
'NAME '
Westberg:sd -
Ring
Gardner -
Reynolds %
,
4 .
DATE::
04/ L /99
04/ 199 ~
04/ /99
04/7/99'-
'
-
. OFFICIAL RECORD COPY
,
5
'
gig Pg
3.
,em
a
,
.
N
.
q @
'
'
'
'
'
.
-
.
.
,
Mr. Oliver D. Kingsley
.
President, Nuclear Generation Group
Commonwealth Edison Company
' ATTN: Regulatory Services
Executive Towers West lli
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT:
QUAD CITIES INSPECTION REPORT 50-254/199903(DRS);
50-265/199903(DRS) .
Dear Mr. Kingsley:
s
This refers to the inspection conducted March 8 through 12,1999, at the Quad Cities Nuclear
Power Station. The purpose of the inspection was to evaluate the program and procedures
regarding maintenance of electrical power circuit breakers, to assess corrective actions for
previously identified maintenance problems, and to review long standing maintenance related
materiel condition problems.
The circuit breaker maintenance program and procedures appeared to be acceptable with a few
minor exceptions related to the 480V breakers, such as, a lack of minimum voltage testing, lack
of "as found" data in refurbishment reports, and a lack of documentation to support seismic
qualification of 480V switchgear with breakers removed. Corrective actions, in general, appear
to be appropriate and timely. Self assessments were thorough and appeared to be sufficiently
self-critical. Longstanding materiel condition issue continue to be a problem.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclor.ure will be placed in the NRC Public Document Room.
Sincerely,
Steven A. Reynolds, Deputy Director
Division of Reactor Safety
Docket Nos: 50-254;50-265
Enclosure:
Inspection Report 50-254/199903(DRS);
50-265/199903(DRS)
See Attached Distribution
DOCUMENT NAME: G:\\ QUAD \\QUA99003.DRS
70 tecewe e copy of the incument. In&cale in the bor "C" e Copy without attachAenct T e Copy with ettach/enci "N's No cop,
OFFICE-
Rlll
6
R!!!
F.
Rlll
h
Rill
'
NAME
Westb
d
Ring
GardnerNY
Reynolds F
'
,
DATE
04/01/99
04/)/99
04/t/99
04/ /99
OFFICIAL RECORD COPY
_
<
"
,
,
,
> ,
.
,.-
1
- ]
'
'
,
,+
,,
O. Kingsley V
-2-
.!
.
- 1
l
- 'cc w/ encl:
D. Helwig, Senior Vice President
j
L
H. Stanley, PWR Vice President
Jj
D]
C. Crane, BWR Vice President:
' R. Krich, Vice President, Regulatory Services -
[
DCD Licensing
L!
J. Dimmette, Jr., Site Vice President -
1
G. Bames, Acting Quad Cities Station Manager
j
C. Peterson, Regulatory Affairs Manager -
!
t-
' M. Aguilar, Assistant Attorney General -
State Liaison Officer, State of Illinois
State Liaison Officer, State of Iowa
Chairman, Illinois Commerce Commission
l
W. Leech, Manager of Nuclear
l
MidAmerican Energy Company
l
l
Distribution:
l
E 4R (E-Mail)
l
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlll w/enci
L
B. Clayton, Rlll w/enci
,
SRI Quad Cities w/enci
DRP w/enci
DRS w/ encl
.
Rlli PRR w/ encl
L
PUBLIC IE-01 w/enci
Docket File w/enct
GREENS
LEO (E-V. ail)
DOCDESK (E-Mail)
l
l
1900SR
_
,
6
( .
As
,