Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted
ML20246Q012
Person / Time
Site: Vermont Yankee, Yankee Rowe, 05000000
Issue date: 08/31/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20246Q018 List:
References
NUDOCS 8909110308
Download: ML20246Q012 (2)


See also: IR 05000029/1989014

Text

__

. - . _ _ _ _ ____-_ - __

, ,

'%

x

[ ,

...

Q'

()

I '

AUG 31 1983.

~

Docket No. 50-271 -

c >

~

. Vermont Yankee Nuclear Power Corporation

' ATTN: Mr. Warren P. Murphy-

Vice President and Manager:

t. ~of Operations-

L RD 5, Box'169

p' . Ferry Road

>

Brattleboro, Vermont 05301

Gentlemen:

Subject: LInspection Report No. 50-029/89-14 and 50-271/89-10

This letter refers to the routine. inspection conducted by Mr. T. Rebelowski

and.Mr. R. Winters of this: office on July 17-21, 1989 at the corporate office,

'in Bolton, Massachusetts and at'the plant sites in Rowe, Massachusetts and

Vernon, Vermont. The results of the inspection were discussed with Dr. A. Kadak,-

at Bolton, with'Mr.?St. Laurent at the. Yankee Rowe plant and with Mr. Pelletier

of the Vermont Yankee plant.

<

This inspectionLwas directed at activities related to engineering. support

provided;to the plants by the corporate' engineering staff. . Areas examined'

are described in the NRC Region I Inspection Report which is enclosed with

this' letter. Within these~ areas, selected examinations of procedures'and

representative records, interviews with' personnel, and observations by'the

inspectors were made.

Within the scope of this inspection, no violations were observed.

No reply to thisLletter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Sirned By:

Jacque P. Durr

Jacque P. Durr, Chief

Engineering Branch

Divisien of Reactor Safety

Enclosure: NRC eR'gion I Inspection Report No. 50-029/89-14 and 50-271/89-10

..

l

..

OFFICIAL ~ RECORD C0pY IR 50-271/89-10 - 0001.0.0

08/10/89

89091I0308 890s31 3

\

_ _ _ _ _ _ _ _ - _ _ _ _ _ .

{DR. ADOCK 05000029

__

PDC MM!

. _ _ _ -_ _ _ _ _ _

- -

, AUG 31 1989

-l V"ermont Yankee ' Nuclear. 2

. Power Corp-

1

cci w/ enc 1: .

J. Weigand, President and Chief Executive Officer

J. Pelletier, Plant Manager

~J. DeVincentis, Vice President, Yankee Atomic Electric Company

R. Capstick, Licensing Engineer, Yankee Atomic Electric Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

G. Sterzinger, Commissioner, Vermont' Department of Public Service

.

,

'- P. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

Public Document Room (PDR)

Lo::al Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)-

NRC Resident Inspector

State'.of New Hampshire

State of Vermont

Commonwealth of Massach'usetts

bec: w/ enc 1:

Region I Docket Room (with concurrences)

M. Perkins, DRMA (w/o enc 1)

D'. Haverkamp, DRP

L. Doerflein, DRP

J. Wiggins, DRP

G. Grant, SRI . Vermont Yankee

J. Macdonald, SRI - Yankee

M. Fairtile, NRR

K. Abraham, PA0 (21) (SALP Reports Only)

J. Dyer, EDO-

RI:DRS RI:DRS RI:DRS_ RI:DRS- RI:DRS

Rebelowski in ers Baunack Strosrider Durr

Q, set.

8/to/89 8/lo/89 y//o/89

8 8/tr/89 8/fc/89

0FFICIAL RECORD COPY IR 50-271/89-10 - 0002.0.0

08/10/89

_ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ -