pm urg^c
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
v
g
[
REGION lil
c
D
y
801 WARRENVILLE ROAD
"
e
LISLE, ILLINOIS 60532-4351
%*****/
'
June 23, 1999
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edisor. Company
ATTN: . Regulatory Services
Executive Towers West 111
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT:
QUAD CITIES INSPECTION REPORT 50-254/99009(DRP);
50-265/99009(DRP)
Dear Mr. Kingsley:
This refers to the inspection conducted April 21 through May 31,1999, at the Quad Cities
i
Nuclear Power Station. The purpose of the inspection was to determine whether actitities
authorized by the license were conducted safely and in accordance with NRC requirements.
'
The NRC conducted routine resident inspections in this period. Based on the inspectors'
findings, a safety-conscious approach characterized the overall conduct of activities at
Quad Cities. At the conclusion of the inspection, the findings were discussed with members of
your staff.
During this inspection period, a Unit i reactor trip occurred. The trip was caused by interactions
of the reactor water cleanup system relief valves with the scram discharge volume. Previous
problems with the relief valves lifting were not adequately addressed. Separately, some
i
operator performance problems were identified including a failure to properly position a high
pressure coolant injection valve, a surveillance test performed on the wrong unit, and a failure
to recognize core power computer problems in a timely manner.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. Operators failed to properly position the Unit 2 high pressure coolant
injection discharge valve during performance of a surveillance test. This violation is being
treated as a Non-Cited Violation (NCV), consistent with Appendix C of the Enforcement Policy.
T; 1s NCV is described in the subject inspection report. If you contest the violation or severity
level of this NCV, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document
Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator,
Region til and the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001.
9906290399 990623
I
ADOCK 05000254
G
~
.
,
.
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
Document Room.
'
Sincerely,
'
original signed by
Mark A. Ring, Chief
Reactor Projects Branch 1
Docket Nos. 50-254; 50-265
Enclosure:
Inspection Report 50-254/99009(DRP);
50-265/99009(DRP)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President -
R. Krich, Vice President, Regulatory Services
DCD - Licensing
J. Dimmette, Jr., Site Vice President
G. Bames, Quad Cities Station Manager
C. Peterson, Regulatory Affairs Manager
M. Aguilar, Assistant Attorney General
Stcte Liaison Officer, State of Illinois
Stata Lhison Officer, State of Iowa
Chairman, Illinois Commerce Commission
W. Lee:,h, Manager of Nuclear
MidAmerican Energy Company
DOCUMENT NAME: G:\\ QUAD \\QUA99009.DRP
To receive a cosw of this document, Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure *N's No copy
DFFICE -
Rlli
l6
Rlli
16
l
l
NAME
Lerch/ dip /7F%
Ring'7#L
R) ATE
06h1/99-
06fd99
OFRCIAL RECORD COPY
.j!
- .
'lI
O. Kingsley
-3-
'j
i
Distribution:
'
AJM (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
B. Clayton, Rlli w/enci
- SRI Quad Cities w/ encl
DRP w/enci
- DRS w/enci
Rlli PRR w/enci
PUBLIC IE-01 w/enci
{
Docket File w/ encl
{
GREENS
j
1
LEO (E-Mail)
'
DOCDESK (E-Mail)
1
-
\\
$g
\\
L