ML20235B465
Text
u.
.. s l,
Distribution-Courtesy C_opy.
pcketFile.
DR Reading "E
l Docket No. 50-358 MAY 2 51972 L.M.Muntzing, DR j
-0CR (2)-
l "ARu"n4,GC Mr. Edward J. Bauser R.Boyd, L-Executive Director.
"W G..Ertte Joint Consmittaa on Atomic Energy
, R0 (3)
M. GroffI Congress of the United States H. Smith.
L. Rian, L
Dest W. EMw a l H. Berkow An Errata Sheet dated May 10, 1972, reflecting changes to be made to the Safety Evaluatiott dated February 18, 1972,.
related to the proposed construction and operation of the l
. William H. Zinsner Nuclear Power Station, has been prepared.
l Two copies of the Errata Sheet are enclosed for the informa-tion of. the Consmittee.
The Safety Evaluation was forwarded to the Consmittee by Dr. Peter A. Morris letter dated March 2, 1972 Sincerely, Original shn:d by A. Giambussa A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing
)
i Enclosure Errata Sheet (2) bec:
Cc losivus Rancy Co...ic cioner ' emn Cc;;iccione:. Deeb 1
i
...p.h..
.. l omct >..L.: EWR........
..L. :.BWR-2......L
..L1RP
..Q.
1...
CM1-sunmc >.cW.111.iam
...JS tolg-- >...RSBo.
.AGiambusso DATt >
$k.. 5/k/J2_=_5/WJ2.-
5/[/J2-
-5/M/=22-IMrm AEC. Sift (Rev. 9-63)
U.S. GovtRNMENT PRINilNG 0FTICE.1%9 + O.84-$98 0709240114 B70921 PDR FOIA MENZa7-111 PDR
.