ML20210R954
| ML20210R954 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 08/10/1999 |
| From: | Dave Hills NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 9908170264 | |
| Download: ML20210R954 (3) | |
Text
e
+
4
~,
' Mr. Oliver D. Kingsley.
President, Nuclear Generation Group.
Commonwealth Edison Company ATTN: Regulatory Services
- Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Kingsley:
In a telephone conversation on August 4,1999, Mr. Jon Bartlet, Operator Requal Training, and Mr. Micheal Bielby, NRC Examiner, made arrangements for the NRC to inspect the licensed operator requalification program at the Quad Cities Nuclear Station. Your staff has agreed to participate in a voluntary pilot inspection program to be conducted in accordance with Inspection Procedure 71111, Reactor Safety, Attachment 11, Licensed Operator Requalification. The inspection is planned for the weeks of October 18,1999 and October 25,1999, which coincides with your regularly scheduled requalification examination cycle._ The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please fumish the written examinations and operating tests scheduled for the week of the inspection to the NRC by October 12,1999. Mr. Bartlet has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30,2000.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Intemet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
1"/0058 9908170264 990810 PDR ADOCK 05000254 V
,d M. Wadley The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
- Thank you for your cooperation in this matter, if you have any questions regarding this
' inspection, please contact Hironori Peterson at 630-829-9707 or me at 630-829 9733.
Sincerely, David E. Hills, Chief Operations Branch Docket Nos. 50-254; 50-265 cc:
D. Helwig, Senior Vice President C. Crane, Senior Vice President, Nuclear Operations H. Stanley, Vice President, Nuclear Operations R. Krich, Vice President, Regulatory Services DCD - Licensing J. Dimmette, Jr., Site Vice President G. Bames, Quad Cities Station Manager C. Peterson, Regulatory Affairs Manager M. Aguilar, Assistant Attomey General State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission W. Leech, Manager of Nuclear MidAmerican Energy Company F. Tsakeres, Training Department DOCUMENT NAME: G:\\DRS\\QUA08119.WPD 2.
, me w c co m
- r. v c.
nu.nce-. v..e e.
OFFICE Rlli l% Rill
/f Rlli jC l
NAME MBielby:tb 4fA DHills DW MRing /YM DATE 08/1o/99 08ht./99 -
08//o/99 OFFFCIAL RECORD COPY l
E 1
3, 4
,.3
-M. Wadley ' i
- Distribution:
Docket File PUBLIC IE D. C. Trimble, NRR:DIPM:lOLB R. M. Pulsyer, LPM, NRR l
M. 'A. Bies, DRS DRS
- Rlll PRR
. SRI, Quad Cities M. A. Ring, DRP l
l-l l
l 0
i