Commonweahh 1:dison Company 1400 Opus 1%cc Dow nen Grove, H. 0051 M701 l
August 2,1999 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Byron Nuclear Power Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. 50-454 and 50-455 Dresden Nuclear Power Station, Units 1,2 and 3 Facility Operating License Nos. DPR-2, DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237 and 50-249 LaSalle County Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-40 NRC Docket Nos. 50-295 and 50-304
Subject:
Response to Administrative Letter 99-02," Operating Reactor Licensing Action Estimates" f
Reference:
Administrative Letter 99-02," Operating Reactor Licensing Action Estimates," dated June 3,1999 Administrative Letter (AL) 99-02," Operating Reactor Licensing Action Estimates,"
requests that licensees of operating reactors voluntarily submit information pertaining to
/\\
estimates of the number oflicensing actions that will be submitted to the NRC for their U
review during Fiscal Years 2000 and 2001.
l 9908100228 990802 PDR ADOCK 05000010 W
PDR A engom t.ompany j
u
. ~ - '
,4 August 2,1999 -
U.S. Nuclear Regulatory Commission Page 2 -
-Attached are the lists of those licensing actions that are expected to be submitted by the
- Commonwealth Edison (Comed) Company. Please note that this information is tentative and is subject to change.
Respectfully, d*
R.M. Krich Vice President-Regulatory Services Attachments Comed Licensing Actions in Fiscal Year (FY) 2000 Comed Licensing Actions in Fiscal Year (FY) 2001
. cc:
Michael Boyle - U. S. Nuclear Regulatory Commission Regional Administrator-NRC Region III l
NRC Senior Resident Inspector -Braidwood Station
'NRC Senior Resident Inspector -Byron Station NRC Senior Resident Inspector -Dresden Nuclear Power Station NRC Senior Resident inspector -LaSalle County Station NRC Senior Resident Inspector -Quad Cities Nuclear Power Station 4
NRC Senior Resident Inspector -Zion Nuclear Power Station
w
.a.
+:..
- August 2,1999 IJ.S. Nuclear Regulatory Commission Page 3
-bec: ; NRC Project Manager, NRR - Byron and Braidwood Stations NRC Project. Manager, NRR - Dresden Nuclear Power Station, Unit 1 NRC Project Manager, NRR - Dresden Nuclear Power Station, Units 2 and 3 NRC Project Manager, NRR - LaSalle County Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station NRC Project Manager, NRR-Zion Nuclear Power Station
' Office of Nuclear Facility Safety -Illinois Department of Nuclear Safety -
Senior Reactor Analyst -Illinois Department of Nuclear Safety Manager of Energy Practice - Winston and Strawn Vice President - Regulatory Services Licensing Director - Byron and Braidwood Stations Licensing Director-Dresden and Quad Cities Nuclear Power Stations Licensing Director-LaSalle County Station Licensing Director-Zion /Dresden Unit 1 Decommissioning Regulatory Assurance Manager-Braidwood Station
- Regulatory Assurance Manager-Byron Station Regulatory Assurance Manager-Dresden Nuclear Power Station Regulatory Assurance Manager-LaSalle County Station Regulatory Assurance Manager-Quad Cities Nuclear Power Station Regulatory Assurance Manager-Zion Nuclear Power Station r
Comed Document Control Desk - Licensing (Hard Copy)
Comed Document Control Desk - Licensing (Electronic Copy) 1
o-ATTACIIMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 200')
STATION LICENSING ACTION j
BYRON /BRAIDWOOD Power Uprate - Technical Specification Amendment Request j
Boron Dilution Protection System Elimination - Technical J
Specification Amendment Request Best Estimate Analyzer for Core Operations-Nucl;ar-Technical Specification Amendment Request Diesel Generator Allowed Outage Time Extension -
)
Technical Specification Amendment Request Expanded Core Operating Limits Report - Technical Specification Amendment Request BRAIDWOOD ONLY Risk-Based Inservice Inspection - Relief Request Pressurizer Nozzle Limited Examinations - Relief Request I
Examination Scope Expansion - Relief Request Limited Pipe ' Weld Examination Volume - Relief Request Use of Code Case N-526 - Relief Request BYRON ONLY Risk-Based inservice Inspection - Relief Request Alternative Requirements for the Repair of Concrete Containment Reinforcing Steel-Relief Request Alternate Rules for the Inservice Inspection of the Pressurizer Seismic Lug Welds-Relief Request Alternative Rules for the Inservice Inspection ofInaccessible Welds on Welded Penetration Integral Attachments-Relief
)
Request Limited Examinations on Pressurizer Spray, Safety, and
)
Relief Nozzle-to-Vessel Welds - Relief Request
{
Limited Volumetric Examination of Reactor Pressure Vessel Head-to-Flange Weld - Relief Request Limited Volumetric and Surface Examination of Reactor Coolant System Weld Due to Whip Restraint Obstruction -
ReliefRequest Alternative Requirements for Torque and Tension Testing of Class MC Pressure Retaining Bolting - Relief Request Alternate Examination Requirements for Seals and Gaskets Alternate Visual Examination Requirements for Class CC Components - Relief Request Alternative Requirements for Preservice Examination of Paints and Coatings-Relief Request Alternative Requirements for Examination of Paints and Coatings Prior to Removal-Relief Request Alternative Requirements for Successive Examination of Class MC Components - Relief Request
c ATTACHMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2000 (continued)
STATION LICENSING ACTION BYRON ONLY Alternative Rules for Detennining Additional Examinations -
ReliefRequest Alternative Requirements for Repair and Replacement Documentation and Inservice Summary Report Preparation and Submission-Relief Request Alternate Requirements for Qualification of VT-2 Examination Personnel-Relief Request DRESDEN/ QUAD CITIES /
Conversion to improved Technical Specifications with LASALLE Refueling Outage Frequency of 24 Months - Technical Specification Amendment Request Reactor Vessel Pressurefremperature Curve Change -
Technical Specification Amendment Request DRESDEN/ QUAD CITIES Safety Relief Valve Setpoint Tolerance - Technical Specification Amendment Request Electro-Hydraulic Control Setpoint - Technical Specification Amendment Request DRESDEN 2/3 ONLY Leakage Monitoring Allowed Outage Time Extension-Technical Specification Amendment Request
)
Minimum Critical Power Ratio Safety Limit (Unit 3)-
Technical Specification Amendment Request Reactor Vessel Volumetric Examinations - Relief Request VT-1 Requirements on Control Rod Drive Housing Bolting -
ReliefRequest Inspection of Low Pressure Coolant Injection Heat Exchanger Tubesheet-to-Shell Welds - Relief Request Alternative Requirements for Reactor Vessel Closure Head Nuts - Relief Request Reactor Vessel Head Flange Seal Leak Detection System -
ReliefRequest NT-2 Requirements for Control Rod Drive Nitrogen Accumulators - Relief Request LASALLE ONLY Diesel Generator Allowed Outage Time Extension -
Technical Specification Amendment Request Oscillation Power Range Monitoring Instrumentation -
Technical Specification Amendment Request Ultimate Heat Sink Volume for Power Uprate - Technical Specification Amendment Request Alternative Rules for Determining Additional Examinations -
ReliefRequest
. ~
l ATTACilMENT j
COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2000 (continued)
STATION LICENSING ACTION LASALLE ONLY Alternative Requirements for Repair and Replacement Documentation and Inservice Summary Report Preparation and Submission-Relief Request Alternative Rules for the Selection and Examination of Class
- 1. 2, and 3 Integrally Welded Attachments - Relief Request Examination Requirements for the Pump Casing Welds -
ReliefRequest Reactor Vessel Stabilizer Bracket Welds on Shell Course -
ReliefRequest Limited Examination Coverage - Relief Request Alternative Visual Examination Requirements for Seals and Gaskets - Relief Request Alternative Visual Examination Requirements for Class CC
)
Components-Relief Request I
Alternative Requirements for Preservice Examination of Paints and Coatings-Relief Request Alternative Requirements for Examination of Paints and Coatings Prior to Removal-Relief Request Alternative Requirements for Torque and Tension Testing of Class MC Pressure Retaining Bolting - Relief Request Inservice Inspection Scheduling Requirements for Sites with Two Plants - Relief Request Continuous Pressure Monitoring of the Control Rod Drive (CRD) System Accumulators - Relief Request Alternative Requirements for Qualification of VT-2 Examination Personnel-Relief Request Alternative Testing of the Safety Relief Valve Automatic Depressurization System Accumulators-Relief Request Alternate Rules for Table IWC-2500-1, Category C-li -
ReliefRequest QUAD CITIES ONLY Main Steam Line Radiation Monitors -Technical Specification Amendment Request Condenser Low Pressure Vacuum Scram - Technical
)
Specification Amendment Request j
Reactor Low Level Scram - Technical Specification Amendment Request
)
Alternative Rules for Determining Additional Examinations-ReliefRequest m
ATTACHMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2000 (continued)
{
\\
STATION LICENSING ACTION QUAD CITIES ONLY Alternative Requirements for Repair and Replacement Documentation and Inservice Summary Report Preparation and Submission-Relief Request Continuous Pressure Monitoring of the Control Rod Drive (CRD) System Accumulators - Relief Request Alternative Rules for Corrective Measures if Leakage Occurs at Bolted Connections - Relief Request Alternative Requirements for Qualification of VT 2 Examination Personnel-Relief Request DRESDEN UNIT 1 Insurance Coverage Reduction -Exemption Request ZION Post-Shutdown Decommissioning Activities Report Spent Fuel Management and Funding Program Insurance Coverage Reduction - Exemption Request COMED - NUCLEAR Two Submittals Revising the Quality Assurance Program GENERATION GROUP Topical Report I
i
)
i ATTACHMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2001 STATION LICENSING ACTION DRESDEN/ QUAD CITIES Diesel Generator Allowed Outage Time Extension -
Technical Specification Amendment Request DRESDEN 2/3 ONLY Oscillation Power Range Monitoring Instrumentation -
Tecimical Specification Amendment Request QUAD CITIES ONLY Oscillation Power Range Monitoring Instrumentation -
Technical Specification Amendment Request i
i J