Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 08/02/1999
From: Krich R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AL-99-02, NUDOCS 9908100228
Download: ML20210M913 (8)


Text

Commonweahh 1:dison Company

  • / , 1400 Opus 1%cc Dow nen Grove, H. 0051 M701 l

(l August 2,1999 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Byron Nuclear Power Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. 50-454 and 50-455 Dresden Nuclear Power Station, Units 1,2 and 3 Facility Operating License Nos. DPR-2, DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237 and 50-249 LaSalle County Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-40 NRC Docket Nos. 50-295 and 50-304

Subject:

Response to Administrative Letter 99-02," Operating Reactor Licensing Action Estimates" f

Reference:

Administrative Letter 99-02," Operating Reactor Licensing Action Estimates," dated June 3,1999 Administrative Letter (AL) 99-02," Operating Reactor Licensing Action Estimates," l requests that licensees of operating reactors voluntarily submit information pertaining to U

/\

estimates of the number oflicensing actions that will be submitted to the NRC for their review during Fiscal Years 2000 and 2001. l 9908100228 990802 PDR ADOCK 05000010 W PDR A engom t.ompany u j

.~-' . ,

,4

-: August 2,1999 -

, , U.S. Nuclear Regulatory Commission

Page 2 -

-Attached are the lists of those licensing actions that are expected to be submitted by the

-: Commonwealth Edison (Comed) Company. Please note that this information is tentative and is subject to change.

Respectfully, d* .

R.M. Krich Vice President-Regulatory Services Attachments Comed Licensing Actions in Fiscal Year (FY) 2000 Comed Licensing Actions in Fiscal Year (FY) 2001

. cc: Michael Boyle - U. S. Nuclear Regulatory Commission l

Regional Administrator-NRC Region III NRC Senior Resident Inspector -Braidwood Station

'NRC Senior Resident Inspector -Byron Station NRC Senior Resident Inspector -Dresden Nuclear Power Station NRC Senior Resident inspector -LaSalle County Station 4

NRC Senior Resident Inspector -Quad Cities Nuclear Power Station NRC Senior Resident Inspector -Zion Nuclear Power Station

w .a .

+:.. ,

- August 2,1999

, IJ.S. Nuclear Regulatory Commission Page 3

-bec: ; NRC Project Manager, NRR - Byron and Braidwood Stations NRC Project. Manager, NRR - Dresden Nuclear Power Station, Unit 1 NRC Project Manager, NRR - Dresden Nuclear Power Station, Units 2 and 3 NRC Project Manager, NRR - LaSalle County Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station NRC Project Manager, NRR- Zion Nuclear Power Station

' Office of Nuclear Facility Safety -Illinois Department of Nuclear Safety -

Senior Reactor Analyst -Illinois Department of Nuclear Safety Manager of Energy Practice - Winston and Strawn Vice President - Regulatory Services Licensing Director - Byron and Braidwood Stations Licensing Director- Dresden and Quad Cities Nuclear Power Stations Licensing Director- LaSalle County Station Licensing Director-Zion /Dresden Unit 1 Decommissioning Regulatory Assurance Manager-Braidwood Station

- Regulatory Assurance Manager- Byron Station Regulatory Assurance Manager- Dresden Nuclear Power Station Regulatory Assurance Manager- LaSalle County Station Regulatory Assurance Manager- Quad Cities Nuclear Power Station Regulatory Assurance Manager- Zion Nuclear Power Station r Comed Document Control Desk - Licensing (Hard Copy)

Comed Document Control Desk - Licensing (Electronic Copy) 1

o-l ATTACIIMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 200')

STATION LICENSING ACTION j BYRON /BRAIDWOOD Power Uprate - Technical Specification Amendment Request j Boron Dilution Protection System Elimination - Technical J Specification Amendment Request Best Estimate Analyzer for Core Operations-Nucl;ar-Technical Specification Amendment Request Diesel Generator Allowed Outage Time Extension - )

Technical Specification Amendment Request Expanded Core Operating Limits Report - Technical Specification Amendment Request BRAIDWOOD ONLY Risk-Based Inservice Inspection - Relief Request  !

Pressurizer Nozzle Limited Examinations - Relief Request I Examination Scope Expansion - Relief Request Limited Pipe ' Weld Examination Volume - Relief Request Use of Code Case N-526 - Relief Request BYRON ONLY Risk-Based inservice Inspection - Relief Request Alternative Requirements for the Repair of Concrete l Containment Reinforcing Steel- Relief Request '

Alternate Rules for the Inservice Inspection of the Pressurizer Seismic Lug Welds- Relief Request Alternative Rules for the Inservice Inspection ofInaccessible Welds on Welded Penetration Integral Attachments- Relief )

Request Limited Examinations on Pressurizer Spray, Safety, and

)

Relief Nozzle-to-Vessel Welds - Relief Request {

Limited Volumetric Examination of Reactor Pressure Vessel Head-to-Flange Weld - Relief Request Limited Volumetric and Surface Examination of Reactor Coolant System Weld Due to Whip Restraint Obstruction -

ReliefRequest Alternative Requirements for Torque and Tension Testing of Class MC Pressure Retaining Bolting - Relief Request Alternate Examination Requirements for Seals and Gaskets Alternate Visual Examination Requirements for Class CC Components - Relief Request Alternative Requirements for Preservice Examination of Paints and Coatings- Relief Request Alternative Requirements for Examination of Paints and Coatings Prior to Removal- Relief Request Alternative Requirements for Successive Examination of Class MC Components - Relief Request

c ..

ATTACHMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2000 (continued)

STATION LICENSING ACTION BYRON ONLY Alternative Rules for Detennining Additional Examinations -

ReliefRequest Alternative Requirements for Repair and Replacement Documentation and Inservice Summary Report Preparation and Submission- Relief Request Alternate Requirements for Qualification of VT-2 Examination Personnel- Relief Request DRESDEN/ QUAD CITIES / Conversion to improved Technical Specifications with LASALLE Refueling Outage Frequency of 24 Months - Technical Specification Amendment Request Reactor Vessel Pressurefremperature Curve Change -

Technical Specification Amendment Request DRESDEN/ QUAD CITIES Safety Relief Valve Setpoint Tolerance - Technical Specification Amendment Request Electro-Hydraulic Control Setpoint - Technical Specification Amendment Request DRESDEN 2/3 ONLY Leakage Monitoring Allowed Outage Time Extension-Technical Specification Amendment Request )

Minimum Critical Power Ratio Safety Limit (Unit 3)- I Technical Specification Amendment Request Reactor Vessel Volumetric Examinations - Relief Request VT-1 Requirements on Control Rod Drive Housing Bolting -

ReliefRequest Inspection of Low Pressure Coolant Injection Heat Exchanger Tubesheet-to-Shell Welds - Relief Request Alternative Requirements for Reactor Vessel Closure Head Nuts - Relief Request Reactor Vessel Head Flange Seal Leak Detection System -

ReliefRequest NT-2 Requirements for Control Rod Drive Nitrogen l Accumulators - Relief Request LASALLE ONLY Diesel Generator Allowed Outage Time Extension -

Technical Specification Amendment Request Oscillation Power Range Monitoring Instrumentation - )

Technical Specification Amendment Request Ultimate Heat Sink Volume for Power Uprate - Technical Specification Amendment Request Alternative Rules for Determining Additional Examinations -

ReliefRequest

.~

l 1

ATTACilMENT

, . j COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2000 I (continued)

STATION LICENSING ACTION LASALLE ONLY Alternative Requirements for Repair and Replacement Documentation and Inservice Summary Report Preparation and Submission- Relief Request Alternative Rules for the Selection and Examination of Class

1. 2, and 3 Integrally Welded Attachments - Relief Request Examination Requirements for the Pump Casing Welds -

ReliefRequest Reactor Vessel Stabilizer Bracket Welds on Shell Course -

ReliefRequest  ;

I Limited Examination Coverage - Relief Request Alternative Visual Examination Requirements for Seals and Gaskets - Relief Request  !

Alternative Visual Examination Requirements for Class CC )

Components- Relief Request I Alternative Requirements for Preservice Examination of Paints and Coatings- Relief Request Alternative Requirements for Examination of Paints and Coatings Prior to Removal- Relief Request ,

Alternative Requirements for Torque and Tension Testing of Class MC Pressure Retaining Bolting - Relief Request Inservice Inspection Scheduling Requirements for Sites with Two Plants - Relief Request Continuous Pressure Monitoring of the Control Rod Drive (CRD) System Accumulators - Relief Request Alternative Requirements for Qualification of VT-2 Examination Personnel- Relief Request Alternative Testing of the Safety Relief Valve Automatic l

Depressurization System Accumulators- Relief Request  !

Alternate Rules for Table IWC-2500-1, Category C-li -

ReliefRequest QUAD CITIES ONLY Main Steam Line Radiation Monitors -Technical Specification Amendment Request Condenser Low Pressure Vacuum Scram - Technical )

Specification Amendment Request j Reactor Low Level Scram - Technical Specification Amendment Request

)

Alternative Rules for Determining Additional Examinations-  !

ReliefRequest m

.- l ATTACHMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2000 (continued)

{

\

STATION LICENSING ACTION QUAD CITIES ONLY Alternative Requirements for Repair and Replacement Documentation and Inservice Summary Report Preparation and Submission- Relief Request Continuous Pressure Monitoring of the Control Rod Drive (CRD) System Accumulators - Relief Request Alternative Rules for Corrective Measures if Leakage Occurs at Bolted Connections - Relief Request Alternative Requirements for Qualification of VT 2 Examination Personnel- Relief Request DRESDEN UNIT 1 Insurance Coverage Reduction -Exemption Request ZION Post-Shutdown Decommissioning Activities Report Spent Fuel Management and Funding Program Insurance Coverage Reduction - Exemption Request COMED - NUCLEAR Two Submittals Revising the Quality Assurance Program GENERATION GROUP Topical Report I

i I

)

i ATTACHMENT COMED LICENSING ACTIONS IN FISCAL YEAR (FY) 2001 STATION LICENSING ACTION DRESDEN/ QUAD CITIES Diesel Generator Allowed Outage Time Extension -

Technical Specification Amendment Request DRESDEN 2/3 ONLY Oscillation Power Range Monitoring Instrumentation -

Tecimical Specification Amendment Request QUAD CITIES ONLY Oscillation Power Range Monitoring Instrumentation -

Technical Specification Amendment Request i

i J