ML20248E104

From kanterella
Jump to navigation Jump to search
Informs That Licensee Proposed Type a Test Schedule for Plant Complies W/Requirements of 10CFR50,App J,Section III.a/6 & Applicable Tech Spec & Acceptable
ML20248E104
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 09/28/1989
From: Ross T
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
References
NUDOCS 8910050066
Download: ML20248E104 (4)


Text

_ _

. Septemb:r 28, 1989 Docket No. 50-254 i

Mr. Thomas J. Kovach Nuclear Licensing Manager i Commonwealth Edison Company P.O. Box 767 Cnicago, Illinois 60690 Dehr Mr. Kovach:

SUBJECT:

CONTAINMENT INTEGRATED LEAK RATE TEST - Ql'AD CITIES, UNIT 1

References:

(a) L'etter from I.M. Johnson (Ceco) to T.E. Murley (NRC) dated November 16, 1989 In reference (a), you requested our review and approval of the Type A test schedule for Quad Cities, Unit 1, as required by 10 CFR Part 50, Appendix J, and the Technical Specifications (TS). We reviewed your proposal to schedule the next Unit 1 Type A test for Fall 1989. Since Fall 1989 represents the next refueling outage after the last two consecutive Unit 1 Type A test failures, we conclude your schedule complies with the requirements of Appendix J,Section III.A.6 and applicable TS.

Original sianed by:

Thierry M. Ross, Project Manager i Project Directorate III-2 Division of Reacter Projects III, IV, V, and Special Projects cc: See next page DISTRIBUTION:

<gocket. fjje_3 NRC T Local PDRs ,

MVirgilio I LLuther j TRoss l DHagan )

ACRS(10)  !

GPA/PA l l

PDIII-2.g' PDIII-2 PDIII-2 i  ;

TRoss:km LLutherM' PShemans /g(

C/2r/89 9/2 7/89 9/ p /89 [ l a

v OO E.i )(i A A on4.?

f,'DR ADOC.R 65506554 l PDC j

_ _ _ __ _m

{: .

-l h .

", September 28, 1989- l l ~, l

..,. 60cketNo.50-254 rR Mr. Thomas J. Kovach Nuclear Licensing Manager  :

_ Commonwealth Edison Company a

L P.O. Box 767 L Chicagof Illirois 60690 '

Dear Mr. Kovach:

SUBJECT:

CONTAINMENT INTEGRATED LEAK RATE TEST - QUAD CITIES, UNIT 1-

References:

(a) Letter from I.M. Johnson (Ceco) to T.E. Murley (NRC) dated November 16, 1989 In reference (a), you requested our review and approval of the Type A test schedule for Quad Cities, Unit 1, as required by 10 CFR Part 50, Appent' . J, ,

and the Technical Specifications (TS). We reviewed your proposal to schedule '

the next Unit 1 Type A test for Fall 1989. Since Fall 1989 represents the next

[ refueling outage after the last two consecutive Unit 1 Type A test failures, we conclude your schedule complies with the requirements of Appendix J. Section '

III.A.6 and applicable TS.

Original sianed by: I Thierry M. Ross, Project Manager ,

Project Directorate 111-2 i Division of Reactor Projects III, i IV, V, and Special Projects l cc: See next page I

DISTRIBUTION:

Docket file  !

NRC & Local PDRs  ;

MVirgilic '

LLuther TRoss DHagan ACRS(10)

GPA/PA l

i l

PDIII-2 ' PDIII-2 PDIII-2

TRoss: kmN LLutherjd'% PShemans 9/2 / /89 9/;17/89 9/p /89

m _- -

4/* 4'o j' .- '

g UNITED STATES NUCLEAR REGULATORY COMMISSION

, 3 ;E W ASHINGT ON,0. C. 20555 k, ..... .

September 28, 1989

, Docket No. 50-254

-Mr. Thomas J. Kovach Nuclear Licensing Manager

. Commonwealth Edison Company P.O. Box 767 Chicago,-Illinois 60690

Dear Mr. Kovach:

SUBJECT:

CONTAINMENT INTEGRATED LEAK RATE TEST - QUAD CITIES, UNIT 1

References:

(a) Letter from I.M. Johnson (CECO) to T.E. Murley (NRC) dated-November 16, 1969 In reference (a). you requested our review and approval of the Type A test schedule for Quad Cities, Unit 1, as required by;10 CFR Part.50,' Appendix J, andtheTechnicalSpecifications(TS). We reviewed your proposal to schedule the next Unit 1 Type A test for Fall 1989. .Since Fall 1989 represents the next refueling outage after the last two consecutive Unit 1 Type A test failures, we conclude your schedule complies with the requirements of Appendix J,Section III.A.6 and applicable TS.

U - . -

Thierry oss, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects cc: See next page L

1

l -- -

~

~

Mr. Thomas J. Kovach Quad Cities Nuclear Power Station

Commonwealth Edison Campany Units 1 and 2 cc

Mr. Stephen E Shelton Vice President-Iowa-Illinois Gas and Electric Company P. O. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago,' Illinois 60603 Mr. P,1 chard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident Inspector U.. S. Nuclear Regulatory Comission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, Illinois 61201 Illinois' Department of Nuclear Safety Office of Nuclear facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg., #4 Glen Ellyn, Illinois 60137

- _ _ . _ _ _ - _ _ _ - _ _ _ _ - _ _ - - _ - _ -