Y UNITED ST Af ts
' [.I V Cleg\\
NUCLEAR REGULATORY COMMitslON 3
R pttolON Ill 5
I 169 8t006tVELT 'O AO OLEN ELLYN, ILLl%.4 $018?
~ * *
- NOV 211990 Docket No. 50-254 Docket No. 50-265 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Opus West 111 1400 Opus Place Downers Grove, IL 60515 Gentlemen:
A Fitness-For-Duty (FFD) inspection is scheduled to be conducted at Quad Cities Nuclear Power Station the week of January 22-25. 1991.
Mr.' J. R. Kniceley of this office h6s been desi nated as the primary contact for this inspection and can be contacted at tele hone number (708) 790-5641.
As part of the inspection process, FFD written policies and procedures will be reviewed in the NRC Region 111 office prior to the onsite inspection.
You are l
requested to provide us a copy of the procedures and policies pertaining to your FFD program.
These documents will be returned to you or destroyed if requested after i.he inspection report has been prepared. Any of the documents that are considered as exempt from public disclosure in accordance with 10 CFR 2.790 should be identified as such and a statement of the reasons for nondisclosure should + iso be proiided as required by 10 CFR 2.790(b).
The FFD policies and procedures shoult' be provided to us by January 7,1991.
i FFD training material will be reviewed onsite and does not have to be sent to us.
During the inspection, interviews will be conducted with the onsite FFD manager, the Medical Review Officer, the Erployee Assistance Program manager, and personnel responsible for the ansite collection and, if appropriate, onsite testing facility.
If fu sible, please contact Mr. J. R. Kniceley by January 14, 1991, to arrange an interview schedule fw the above personnel.
Interviews of randomly selected licensee employees and contractors will also be conducted during the'onsite inspection. A room to conduct the interviews will be required.
FFD program audits and program records (including training vecords, personne1' records for FFD program personnel, records of pre-access at thoriz6tian inquiries, executed contracts with contractors / venders, and records of chemical test results and appeals, etc) should be available for review.
If any of these records are located offsite, please inform Mr. J. R. Kniceley as soon as practical.
/011280354 901123 l
PDR ADOCK 05000254
/[
\\,
O PDC W
l'f
.m s.. w
e 2 NOV 211990 e'
You are also requested to identify a single onsite or corporate licensee representative to act as the point of contact in reference to the items discussed above.
Please advise Mr. J. R. Kniceley of that individual's name and telephone number as early as practical.
Thank you f ar your assistance in this matter.
If you have any questions, please contact me or Mr. J. R. Kniceley.
Sincerely, N
L. Robert Greger, Chief Reactor Programs Branch cc:
D. Galle Vice President - BWR Operations T. Kovach, Nuclear Licensing Manager R. L. Bax, Statiop Manager DCD/DCB (RIDS) 7 OC/LFDCB Resident Inspector Richard Hubbard J. W. McCaffrey, Chie f. Public Utilities Division Robert Newmann, Office of Public Counsel, State of Illinois Cen;er l