ML20059M210

From kanterella
Jump to navigation Jump to search
Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet
ML20059M210
Person / Time
Site: Dresden, Davis Besse, Perry, Kewaunee, Point Beach, Byron, Cook, Quad Cities, Big Rock Point, Zion, LaSalle  File:Consumers Energy icon.png
Issue date: 09/25/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
CLEVELAND ELECTRIC ILLUMINATING CO., COMMONWEALTH EDISON CO., CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG, TOLEDO EDISON CO., WISCONSIN PUBLIC SERVICE CORP.
References
NUDOCS 9010030287
Download: ML20059M210 (4)


Text

____

o.*

c, SEP 151990 LETTER DISTRIBUTED TO THE TRAlfilNG MANAGERS OF THE FOLLOWING FACILITES:

~~

Eig Rock Point, Docket No. 50-155 Byron, Docket Nos. 50-454/50-455 Donald C. Cook, Docket Nos. 50-315/50-316<

Davis-Besse, Docket No. 50-346' Dresden, Docket Nos. 50-237/50-249-LaSalle, Docket Nos. 50-373/50-374-Perry, Docket No. 50-440 Point Beach, Docket Nos. 50-266'/50-301 Quad Cities, Docket Nos. 50-254'/50-265 Zion, Docket Hos. 50-295'/50-304 Kewaunee, Docket No. 50-305 (Addressed to Nuclear Power Manager with a copy to Training Manager)

The purpose of this letter is to provide information concerning the Generic Fundamentals Examination Section (GFES) of the operator licensing written examination to be administered on Wednesday, October 10, 1990. The BWR and PWR GFES will be administered at 9:30 A.M. local time at the location specified in Enclosure 1.

Included with this letter are:

o map of the area includin the location where the examinations will be administered;(Enclosure 1 a list of lodgings in the immediate area; (Enclosure 1) the names of the regional contacts and telephone numbers; (Enclosure 1) preliminary instructions for those taking the examination; (Enclosure 2)

Equation Sheet.

(Enclosure 3)

Please ensure that all participants receive a copy of the instructions.

A master copy of each version of the examination with answers, a table of the scores for each candidate, and a copy of the answer sheet for each participant will be sent to the facility training department, i

Sincerely, ORIGINAL SICsp M CEONm C. EIM Geoffrey C. Wright, Chief i

Operations Branch

Enclosures:

nog 1.

Map of Exam Administration Areo l

NEa.

2.

Preliminary Instructions to

$8 Pa r'. i c ipa nts gg 3.

Equ. tion Sheet

@'d cc w/ enclosures:

No DCD/DCBc(RIDS)~

8@

P. Doyle, LOLB 8-m Rlli Rlli Rlli Rll!

M

//

alLe /mab Burdick Jordan ri J

09 A /90 09/3590 09//f/90 09p/90

  1. 54/f

/

E Enclo ura 1 O. - S. NRC-REGION I'II GENERIC TUNDAMENTA1.S EXAMINATION ADMINISTRATION

~

d a

R

!Ia k

w d

e d

a i

8 E

8 i:1 hi l2l

@ ROOSEVEI!r ROAD

=

0 ::

61 E

g BUTTERFIELD ROAD a

[l l'

. b w

b 8

WARRENVILLE ROAD CORPORATE W. DRIVE @

/

ish l

0 EXAMINATION SITE EXAMINATION DATE REGION III CONTACTS BWR and PWR:

BWR and PWR Arrive by 8:30 A.M.

October 10, 1990 John Walker (PWR) 9:30 A.M.

708/790-5563 1.

Radisson llotel 2100 Butterfield Road Dell-McNeil (BWR)

Downers Grove. IL 708/790-5550 708/971-2000 OTilER AREA LODGING

-j 2.

Ilo11 day Inn 4.

Dillon Inn

-6.

1.ilton Inn

^

Glen Ellyn-Lombard 3031 Finley. Road 3C43 Corporate West Dr.

1250' Roosevelt Road Downers Grove. IL Lisle, IL Glen Ellyn. IL 708/810-9500 708/369-0900 708/629-6000 j

i

'3..

Ilo11 day Inn-Crown Plaza 5.

Ilyatt Hotel 7.

' Fou r ' S e a s o n s :- ilo t el 3000 Warrenville Road 1400 Corporetum Dr..

Best Western Lisle, IL Lislo, IL 656 Taft 708/505-1000 708/852-1234 Glen Ellyn,'IL 708/469-8500

'4 Pre-Examination Instructions for the Generic fundamentals

-Examination Section of the Written Examination The following instructions aoply'for the fundamentals Examination Section:

(GFES) of the Written Operatar Licensing' Examination to be administered October 10,'1990.

A.

Identification - All participants must present' photo identification (i.e.

facility photo-badge, state driver W icense, etc.) and' sign a roster sheet before receiving _an examination.

B.

Information Provided with-the Examination - Each-examination ~ package will include an examination, a copy of the.steahl. tables, an ' Equations and Constants Sheet, a machine gradable answer sheet'and. instructions.on filling' out the answer sheet. - All material must be turned in at the completion of the' examination.

C.

Use of Calculators - Use of personal pocket calculators and slide' rules E l be permitted during the examination. 'NRC will not supply calculators, so the participant should-ensure-that batteries are new or have been recently charged.

No'other examination aids will be. permitted.

D.

Examination Administration - The examination will be admi~nistered using-the criteria contained in ES-201 of NUREG 1021 " Operator. Licensing Examiner Standards" as modified by instructions provided at:the-time.the examination is administered..

E.

Decision to Withdraw - If for ary reason a participant decides'to withdraw from the examination,'please inform the regionalicontact John Walkcr at 708-790-5563. before October 5, 1990.:

F.

Examination Duration - The time-designated to-. complete the examination is-2-1/2 hours. All participants will be-required to hand in:their-examinations 2 T72 hours after the start'of the examination. Late arrivals will be permitted to-take the examination, but will be-required to hand in their examinations at=the same time as the other applicants.

.o

r,

~

tEncl~;ura 3

,- :, - c..

E Q U A:T I O'N SHEET

+;

....e.........................................................................

Cycle Efficiency he Work (out)'

6

- mc AT p

Energy __(in) 6 - - Is Ah SCR S/(1.'K,gg) 6 UA AT-CRg (1-'. K,gg)y CR2 (1 Keff)2 1/(1.K;fj)

SUR

26.06/r M

lCR /CR0 y

26.06 (A,gg p)

(1.. K,gg)0 (3.p)

(1. K,gg)y D

P 10 SDM P

O

(1. K,gg)/K,gg P e(t/f)

Pwr' -'_Wg [a p

9 (1*/p) + [(p. p)/A,gg ]

1*/(p.. p) r p

r (K,gg 1)/K,gg 1*

-- 1 x 10 5 seconds p

U p

AK,ggA,f g A,gg - 0.1 seconds 10 1 Curie 3.7 x 10 dps 1 kg 2.21 lba 3

6 2.54 x 10 BTU /hr 1 Mw -

3'.41'x 10 BTU /hr 1 hp i

1 BTU 778 ft lbf

'F-9/5 *C + 32

'C 5/9 ('F 32)

-