ML20245K901

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-254/OL-89-02 on 890511-13 & 15-16 for Units 1 & 2.Programmatic Weaknesses Identified
ML20245K901
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/28/1989
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20245K904 List:
References
NUDOCS 8907050295
Download: ML20245K901 (2)


Text

- - _.

r .- - A

.[ .

w Docket No. 50-254 @8m Docket No. 50-265 Commonwealth Edison' Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

SUBJECT:

REQUALIFICATION EXAMINATION REPORT On May 11-13, and 15,16, 1989, the NRC administered requalification examinations to employees of your organization who operate your Quad Cities Nuclear Power Station. At the conclusion of the examination, generic findings that evolved as a result of the examinations were discussed with those members of your staff identified in the enclosed report.

As a result of this evaluation your requalification program has been assigned an overall program rating of satisfactory, in accordance with the criteria of NUREG-1021, ES 601. Individuals with unsatisfactory results, should receive remedial up grading according to your program requirements prior to being returned to licensed duties.

Two programmatic weaknesses were identified during the requalification program evaluation as specified in Paragraph 4 of the enclosed report. These included:

1) The quality of the examination material provided by the facility and 2)

Problems related to the use and oversight of contractor evaluators during the simulator portion of the examinations. A written response is required within 30 days of the date of this letter outlining your corrective action plan covering these items.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, ORIGINAL SIGNED BY GEOFF8EY C. WP.lGhi Geoffrey C. Wright, Chief Operations Branch 10 0

$3@

Enclosures:

<> o 1. Examination Report

$8 No. 50-254/0L-89-02 50 2. Examinations and y Answer Keys SRO/R0 No

@@ See Attached Distribution o RIII RIIT- I RIII ox N [kkV Yith 6/ /89 are/cg/lc / Jordan 6/f//89 rrison 6/26/89

/ Wright 6/2#/89 -(

/E A

-- - i

z " , ~ ,

g..

~:

. Commonwealth' Edison Company 2 JUN 2 81999 e' -cc w/ enclosure:

T. Kovach, Nuclear Licensing Manager R. L. Bax, Station Manager DCD/DCB (RIDS).

Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division

.J. A. Neal, Plant Training Manager T. Ross, Project Manager, NRR Contract Exam Supervisor M. R. Johnson, EDO

_ _ _ _ _ _ _ _ - - - _ - _ -