Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations
ML20217F632
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/07/1999
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20217F637 List:
References
50-254-99-01, 50-265-99-01, NUDOCS 9910210031
Download: ML20217F632 (4)


See also: IR 05000254/1999001

Text

c= 1

mat ' UNITED STATES

^- / o NUCLEAR REGULATORY COMMISSION

[. g' REGloN 111

',d g 801 WARRENVILLE ROAD

  • LISLE, ILLINotS 60532-4351

-

October 7, 1999

\o****

Mr. Oliver D. Kingsley I

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West ill

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT: QUAD CITIES INSPECTION REPORT 50-254/99018(DRP);

50-265/99018(DRP)

Dear Mr. Kingsley:

On September 8,1999, the NRC completed an inspection at your Quad Cities Units 1 and 2 ,

reactor facilities. The results were discussed with Mr. Bames and othcr members of your staff. 1

The enclosed report presents the results of that inspection.

l

. The inspection was an examination of activities conducted under your license as they relate to I

safety and to compliance with the Commission's rules and regulations and with the conditions

of your license. Within these areas the inspection consisted of a reiective examination of

procedures and representative records, observations of activities, and interviews with

personnel. Specifically, this inspection was conducted by the resident inspectors and focused

on reactor safety.

Based on the results of this inspection, NRC identified fiva issues of low safety significance that

have been entered into your corrective action program and are diccussed in the summary of

findings and in the body of the enclosed report. One of these issues involved a violation of

regulatory requirements. Because of the low safety significance, this issue is not being cited in

accordance with the NRC enforcement policy. If you contest this non-cited viblation, you should

provide a response within 30 davs of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulato;y Commission, ATTN: Document Control Desk, Washington

DC 20555-0001, with copies to the Regional Administrator, Region lil, the Director, Office of

Enforcement, U, .d States Nuclear Regulatory Commission, Washington, DC 20555-0001,

and the NRC Resident inspector at the Quad Cities facility.

l

9910210031 991007

PDR ADOCK 05000254

G PDR l

[. .

[

(o

j

October 7,1999

,

Mr. Oliver D. Kingsley ..

President, Nuclear Generation Group

Commonwealth Edison Company.

L ATTN: Regulatory Services

Executive Towers West lli

1400 Opus Place, Suite 500 I

Downers Grove, IL 60515 '

. SUBJECT: QUAD CITIES INSPECTION REPORT 50-254/99018(DRP);

50-265/99018(DRP)

Dear Mr. Kingsley:

On September 8,1999, the NRC completed an inspection at your Quad Cities Units 1 and 2

reactor facilities. The results were discussed with Mr. Bames and other members of your staff.

The enclosed report presents the results of that inspection.

The inspection was an examination of activities conducted under your license as they relate to

safety and to compliance with the Commission's rules and regulations and with the conditions

of your license. Within these areas the inspection consisted of a selective examination of

procedures and representative records, observations of activities, and interviews with

personnel.- Specifically, this inspection was conducted by the resident inspectors and focused

on reactor safety.

Based on the results of this inspection, NRC identified five issues of low safety significance that

have been entered into your corrective action program and are discussed in the summary of

findings and in the body of the enclosed report. One of these issues involved a violation of

regulatory requirements. Because of the low safety significance, this issue is not being cited in

accordance with the NRC enforcement policy. If you contest this non-cited violation, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Weshington

DC 20555-0001, with copies to the Regional Administrator, Region lil, the Director, Office of

Enforcement,. United States Nuclear Regulatory Commission, Washington, DC 20555-0001,

and the NRC Resident inspector at the Quad Cities facility.

-

.

O

O. Kingsley -2-

In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

Sincerely,

/s/ Mark A. Ring

Mark A. Ring, Chief

Reactor Projects Branch 1

Docket Nos. 50-254; 50-265

License Nos. DPR-29; DPR-30

Enclosure: Inspection Report 50-254/99018(DRP);

50-265/99018(DRP)

cc w/ encl: D. Helwig, Senior Vice President, Nuclear Services

C. Crane, Senior Vice President, Nuclear Operations

H. Stanley, Vice President, Nuclear Operations

R. Krich, Vice President, Regulatory Services

DCD - Licensing

J. Dimmette, Jr., D o Vice President

.

G. Barnes, Quad Cities Station Manager

C. Peterson, Regulatory Affairs Manager

M. Aguilar, Assistant Attorney General

State Liaison Officer, State of Illinois

State Liaison Officer, State of Iowa

Chairman, Illinois Commerce Commission

W. Leech, Manager of Nuclear

MidAmerican Energy Company ,

DOCUMENT NAME: G:\ QUAD \QUA99018DRP.WPD

To receive a copy of thle document, Indicate in the box *C" = Copy without ettechment/ enclosure "E" - Copy with attachment / enclosure

'N" = No copy j

OFFICE Rill lp Rill lF l l

NAME Lerch:cc(8.Th Ring-)fff-

' '

DATE JM/ '7/99 M99

l#/lOFFICI AL RECORD COPY

i

_

l

,

O. Kingsley -3-

Distribution:

M. Branch, NRR (E-Mail)

T. Frye, NRR (E-Mail)

A. Madison, NRR (E-Mail)

S. Stein, NRR (E-Mail)

R. Mathew. NRR (E-Mail)

AJM (E-Mail)

RPC (E-Mail)

RMP3 (Project Mgr.) (E-Mail)

J. Dyer, Rlil w/enci

J. Caldwell, Rill w/enci

B. Clayton, Rlll w/enct

SRI Quad Cities w/enci

DRP w/enci i

DRS w/ encl

Rlil PRR w/enci )