Category:INSPECTION REPORT
MONTHYEARML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24017A0582024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23124A0302023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20234202023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 – Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 2024-09-23
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000269/19990121999-09-21021 September 1999 Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 on 990602-0730.No Violations Noted.Major Areas Inspected:Review of Documentation of Licensee Aging Mgt Programs & Exam of Sample of Plant Equipment That Support Util Application IR 05000269/19990051999-09-10010 September 1999 Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000269/19990041999-07-30030 July 1999 Insp Repts 50-269/99-04,50-270/99-04 & 50-287/99-04 on 990223-0703.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000269/19990061999-06-17017 June 1999 Insp Repts 50-269/99-06,50-270/99-03 & 50-287/99-03 on 990411-0522.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000269/19990111999-05-24024 May 1999 Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Major Areas Inspected:Samples of Plant Equipment & Documentation That Supported Duke Energy Application for Renewed Operating Licenses IR 05000269/19990021999-05-0505 May 1999 Insp Repts 50-269/99-02,50-270/99-02 & 50-287/99-02 on 990228-0410.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected:Operations,Engineering, Maint & Plant,Support IR 05000269/19990011999-03-26026 March 1999 Insp Repts 50-269/99-01,50-270/99-01 & 50-287/99-01 on 990117-0227.Violations Noted.Major Areas Inspected: Operations,Maintenance & Engineering IR 05000269/19980111999-02-12012 February 1999 Insp Repts 50-269/98-11,50-270/98-11 & 50-287/98-11 on 981129-990116.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Emergency Response Exercise IR 05000269/19990101999-01-26026 January 1999 Insp Repts 50-269/99-10,50-270/99-10 & 50-287/99-10 on 981102-20 & 990111-15.No Violations Noted.Major Areas Inspected:Operation Re Weakness in Emergency Operating Procedures ML15261A3801998-12-23023 December 1998 Insp Repts 50-269/98-15,50-270/98-15 & 50-287/98-15 on 981102-06,981116-20 & 981211.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000269/19980101998-12-22022 December 1998 Insp Repts 50-269/98-10,50-270/98-10 & 50-287/98-10 on 981018-1128.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19980091998-11-13013 November 1998 Insp Repts 50-269/98-09,50-270/98-09 & 50-287/98-09 on 980906-1017.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000269/19980131998-10-27027 October 1998 Insp Repts 50-269/98-13,50-270/98-13 & 50-287/98-13 on 980817-20.Exercise Weaknesses Noted.Major Areas Inspected: Observation & Evaluation of Biennial Emergency Preparedness Exercise ML15118A3181998-10-0505 October 1998 Insp Repts 50-269/98-08,50-270/98-08 & 50-287/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000269/19980141998-09-22022 September 1998 Insp Repts 50-269/98-14,50-270/98-14,50-287/98-14, 50-369/98-14,50-370/98-14,50-413/98-14 & 50-414/98-14 on 980824-28.No Violations Noted.Major Areas Inspected:Plant Support.Specific Area Includes Access Authorization Program IR 05000269/19980071998-08-24024 August 1998 Insp Repts 50-269/98-07,50-270/98-07 & 50-287/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19980061998-07-13013 July 1998 Insp Repts 50-269/98-06,50-270/98-06 & 50-287/98-06 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML15261A3591998-06-0303 June 1998 Insp Repts 50-269/98-12,50-270/98-12 & 50-287/98-12 on 980422-0520.No Violations Noted.Major Areas Inspected: Engineering ML15118A2941998-06-0101 June 1998 Insp Repts 50-269/98-05,50-270/98-05 & 50-287/98-05 on 980322-0502.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000269/19980031998-05-0404 May 1998 Insp Repts 50-269/98-03,50-270/98-03 & 50-287/98-03 on 980302-06 & 16-20.Violations Noted.Major Areas Inspected: Plant Operations,Maint & Engineering IR 05000269/19980021998-04-20020 April 1998 Insp Repts 50-269/98-02,50-270/98-02 & 50-287/98-02 on 980208-0321.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15118A3351998-03-25025 March 1998 Insp Repts 50-269/98-04,50-270/98-04 & 50-287/98-04 on 980302-05.Violations Noted.Major Areas Inspected:Plant Support,Including Review of Random Samples of Security Procedures ML15118A3311998-03-18018 March 1998 Insp Repts 50-269/98-01,50-270/98-01 & 50-287/98-01 on 980126-0205.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15118A3271998-03-0505 March 1998 Insp Repts 50-269/97-18,50-270/97-18 & 50-287/97-18 on 971228-980207.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19970161998-01-26026 January 1998 Insp Repts 50-269/97-16,50-270/97-16 & 50-287/97-16 on 971116-1227.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000269/19970171997-12-31031 December 1997 Insp Repts 50-269/97-17,50-270/97-17 & 50-287/97-17 on 971201-04.No Violations Noted.Major Areas Inspected: Aspects of Licensees Plant Support Activities,Including Physical Security Plan & Vital Area Access Control ML15118A2771997-12-15015 December 1997 Insp Repts 50-269/97-15,50-270/97-15 & 50-287/97-15 on 971019-1115.Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Engineering,Maint & Plant Support ML15118A2701997-11-17017 November 1997 Insp Repts 50-269/97-14,50-270/97-14 & 50-287/97-14 on 970907-1018.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15118A2591997-10-0606 October 1997 Insp Repts 50-269/97-12,50-270/97-12 & 50-287/97-12 on 970727-0906.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19970101997-08-25025 August 1997 Insp Repts 50-269/97-10,50-270/97-10 & 50-287/97-10 on 970615-0726.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000269/19970111997-07-30030 July 1997 Insp Repts 50-269/97-11,50-270/97-11 & 50-287/97-11 on 970630-0710.No Violations Noted.Major Areas Inspected: Engineering,Maint,Operations & Plant Support ML15118A2331997-07-18018 July 1997 Insp Repts 50-269/97-05,50-270/97-05 & 50-287/97-05 on 970504-0618.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19970071997-06-27027 June 1997 Insp Repts 50-269/97-07,50-270/97-07 & 50-287/97-07 on 970422-0606.Violations Noted.Major Areas Inspected:Licensee Efforts to Investigate Causes & to Provide Corrective Action for Unisolable Reactor Coolant Leak Detected on 970421 IR 05000269/19970081997-06-27027 June 1997 Insp Repts 50-269/97-08,50-270/97-08 & 50-287/97-08 on 970603-06.Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML15118A2211997-06-0202 June 1997 Insp Repts 50-269/97-02,50-270/97-02 & 50-287/97-02 on 970323-0503.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000269/19970061997-05-30030 May 1997 AIT Insp Repts 50-269/97-06,50-270/97-06 & 50-287/97-06 on 970503-09.Major Areas Inspected:Operations,Engineering, Plant Support & Event Assessment Re 970503 Event Associated W/Degradation of Unit 3 HPI Sys During Plant Cooldown IR 05000269/19970031997-05-22022 May 1997 Insp Repts 50-269/97-03,50-270/97-03 & 50-287/97-03 on 970421-24.No Violations Noted.Major Areas Inspected:Plant Support ML15118A1981997-04-21021 April 1997 Insp Repts 50-269/97-01,50-270/97-01 & 50-287/97-01 on 970209-0322.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML15118A1891997-03-10010 March 1997 Insp Repts 50-269/96-20,50-270/96-20 & 50-287/96-20 on 961229-970208.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15118A1751997-01-27027 January 1997 Insp Repts 50-269/96-17,50-270/96-17 & 50-287/96-17 on 961117-1228.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19960191997-01-0909 January 1997 Insp Repts 50-269/96-19,50-270/96-19 & 50-287/96-19 on 961209-10.No Violations Noted.Major Areas Inspected: Evaluation,Correction & Observation & Findings IR 05000269/19960181996-12-19019 December 1996 Insp Repts 50-269/96-18,50-270/96-18 & 50-287/96-18 on 961111-22.Violations Noted.Major Areas Inspected:Licensee Plant Support ML15118A1591996-12-0404 December 1996 Insp Repts 50-269/96-16,50-270/96-16 & 50-287/96-16 on 961006-1116.Violations Noted.Major Areas Inspected:Maint, Engineering & Plant Support ML15118A1541996-11-0404 November 1996 AIT Reps 50-269/96-15,50-270/96-15 & 50-287/96-15 on 960924-1008.No Violations Noted.Major Areas Inspected: Licensee Response to 960924 Event Re Balance of Plant Heater Drain Line Rupture IR 05000269/19960131996-10-0505 October 1996 Insp Repts 50-269/96-13,50-270/96-13,50-287/96-13 & 70-0004/96-13 on 960825-1005.Violations Noted.Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000269/19960141996-09-17017 September 1996 Insp Repts 50-269/96-14,50-270/96-14 & 50-287/96-14 on 960916-19.No Violations Noted.Major Areas Inspected: Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000269/19960111996-08-15015 August 1996 Partially Withheld Insp Repts 50-269/96-11,50-270/96-11 & 50-287/96-11 on 960715-16 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Program for Responding to Security Threats ML15118A1361996-08-12012 August 1996 Insp Repts 50-269/96-10,50-270/96-10 & 50-287/96-10 on 960602-0713.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering,Plant Support,Plant Status & Review of UFSAR Commitments ML15118A1271996-06-27027 June 1996 Insp Repts 50-269/96-09,50-270/96-09 & 50-287/96-09 on 960421-0601.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support & Area of ISFSI IR 05000269/19960081996-05-31031 May 1996 Insp Repts 50-269/96-08,50-270/96-08 & 50-287/96-08 on 960422-0503.No Violations Noted.Major Areas Inspected: Licensee Actions to Verify,Monitor & Maintain Capabilities of Ssf as Described in Licensing Basis 1999-09-21
[Table view] Category:INSPECTION REPORT
MONTHYEARML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24017A0582024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23124A0302023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20234202023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 – Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 2024-09-23
[Table view] Category:UTILITY
MONTHYEARIR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900271990-10-25025 October 1990 Insp Repts 50-269/90-27,50-270/90-27,50-287/90-27 & 72-0004/90-27 on 900902-29.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance Testing, Maint Activities & Insp of Open Items IR 05000269/19900281990-10-16016 October 1990 Insp Repts 50-269/90-28,50-270/90-28 & 50-287/90-28 on 900925-28.No Violations Noted.Major Areas Inspected: Radiation Protection Program ML15224A7071990-08-0202 August 1990 Insp Repts 50-269/90-23,50-270/90-23 & 50-287/90-23 on 900716-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss IR 05000269/19900211990-07-31031 July 1990 Insp Repts 50-269/90-21,50-270/90-21 & 50-287/90-21 on 900617-0714.No Violations or Deviations Noted.Major Areas Inspected:Operation,Surveillance Testing,Spent Fuel Transfer Cask Insp,Maint Activities & Installation & Testing of Mods IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation ML15224A6951990-06-26026 June 1990 Insp Repts 50-269/90-17,50-270/90-17 & 50-287/90-17 on 900520-0616.Violations Noted.Major Areas Inspected:Maint Activities,Operations,Surveillance Testing & Unmonitored Discharge from Unit 1 Vent & Plant Startup from Refueling IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control ML15224A6911990-06-19019 June 1990 Insp Repts 50-269/90-12,50-270/90-12 & 50-287/90-12 on 900422-0519.Violations Noted.Major Areas Inspected: Operations,Degraded Grid Voltage,Surveillance Testing,Maint Activities,Seismic Monitoring & Outage Activities ML15224A6871990-06-15015 June 1990 Insp Repts 50-269/90-16,50-270/90-16 & 50-287/90-16 on 900517-22.Violation Noted.Major Areas Inspected:Scope of 900517 Overflow of Spent Fuel Pool,Resulting in Contamination of Auxiliary Bldg & Fuel Receipt Bay IR 05000269/19900141990-06-0505 June 1990 Insp Repts 50-269/90-14,50-270/90-14 & 50-287/90-14 on 900514-19.Violations Noted.Major Areas Inspected:Radiation Protection Program to Review Activities Associated W/ Occupational Radiation Exposures During Extended Outages IR 05000269/19900151990-06-0505 June 1990 Insp Repts 50-269/90-15,50-270/90-15 & 50-287/90-15 on 900521-25.No Violations or Deviations Noted.Major Areas Inspected:Maint,Including Maint Program & Program Implementing Documents IR 05000269/19900111990-05-0404 May 1990 Insp Repts 50-269/90-11,50-270/90-11 & 50-287/90-11 on 900325-0421.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance Testing,Maint Activities, 10CFR21 Program Review & Meeting W/Local Officials ML15224A6581990-04-10010 April 1990 Insp Repts 50-269/90-08,50-270/90-08 & 50-287/90-08 on 900218-0324.Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Review of Lpdr & Insp of Open Items IR 05000269/19900091990-04-10010 April 1990 Insp Repts 50-269/90-09,50-270/90-09 & 50-287/90-09 on 900305-09 & 12-16.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing,Complex Surveillance & Action on Previous Insp Findings IR 05000269/19900101990-04-0909 April 1990 Insp Repts 50-269/90-10,50-270/90-10 & 50-287/90-10 on 900312-16.No Violations Noted.Major Areas Inspected:Review of Completed Power Escalation Tests for Unit 3,Cycle 12 & Review of Procedures Used in Thermal Power Monitoring IR 05000269/19900071990-03-22022 March 1990 Insp Repts 50-269/90-07,50-270/90-07 & 50-287/90-07 on 900226-0303.No Violations or Deviations Noted.Major Areas Inspected:Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM IR 05000269/19900051990-03-0909 March 1990 Insp Repts 50-269/90-05,50-270/90-05 & 50-287/90-05 on 900212-16.No Violations Noted.Major Areas Inspected: Corrective Actions for Problems Identified by NRC During Sept 1989 Exercise IR 05000269/19900031990-02-27027 February 1990 Insp Repts 50-269/90-03,50-270/90-03 & 50-287/90-03 on 900122-26.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensee Actions on Open Items IR 05000269/19900011990-02-15015 February 1990 Insp Repts 50-269/90-01,50-270/90-01 & 50-287/90-01 on 900108-12,18 & 25.No Violations or Deviations Noted.Major Areas Inspected:Design Changes,Mods,Corrective Actions & Other Engineering Support Activities IR 05000269/19890401990-02-0707 February 1990 Insp Repts 50-269/89-40,50-270/89-40 & 50-287/89-40 on 891217-900113.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance Testing,Maint Activities, Nonroutine Reporting Program & Insp of Open Items IR 05000269/19900021990-02-0707 February 1990 Insp Repts 50-269/90-02,50-270/90-02 & 50-287/90-02 on 900108-12.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry W/Emphasis on Secondary Chemistry & Pipe Erosion/Corrosion Throughout Second Sys ML15224A6201990-01-10010 January 1990 Insp Repts 50-269/89-37,50-270/89-37 & 50-287/89-37 on 891127-1201.Violation Noted.Major Areas Inspected:Inservice Insp,Including Observation of Work & Work Activities & Review of Actions Re Unit 3,2nd Interval Request for Relief ML15224A6161990-01-0808 January 1990 Insp Repts 50-269/89-36,50-270/89-36 & 50-287/89-36 on 891112-1216.Violations Noted.Major Areas Inspected:Licensee self-assessment Capability & Onsite in Areas of Operations, Surveillance Testing & Maint Activities IR 05000269/19890351989-11-21021 November 1989 Insp Repts 50-269/89-35,50-270/89-35 & 50-287/89-35 on 891030-1101.No Violations or Deviations Noted.Major Areas Inspected:Soils & Concrete for Installation of ISFSI IR 05000269/19890321989-11-20020 November 1989 Partially Withheld Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890331989-11-15015 November 1989 Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Reactor Fuel IR 05000269/19890301989-11-0707 November 1989 Partially Withheld Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22 (Ref 10CFR2.790 & 73.21).One non- Cited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Mgt Effectiveness ML15224A5991989-11-0303 November 1989 Insp Repts 50-269/89-29,50-270/89-29 & 50-287/89-29 on 890925-28.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Annual Radiological Emergency Preparedness Exercise ML15224A5941989-10-26026 October 1989 Insp Repts 50-269/89-31,50-270/89-31 & 50-287/89-31 on 890917-1010.Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Qa Observations & Open Items IR 05000269/19890271989-09-26026 September 1989 Insp Repts 50-269/89-27,50-270/89-27 & 50-287/89-27 on 890821-22.No Violations or Deviations Identified.Major Areas Inspected:Open Items in Fire Protection ML15224A5821989-09-0707 September 1989 Insp Repts 50-269/89-25,50-270/89-25 & 50-287/89-25 on 890717-0819.Violations Noted.Major Areas Inspected:Maint Activities,Operations,Surveillance Testing,Facility Mods, Loss of DHR Actions & Insp of Open Items IR 05000269/19890241989-08-21021 August 1989 Insp Repts 50-269/89-24,50-270/89-24 & 50-287/89-24 on 890807-11.Major Areas Inspected:Corrective Actions for Previous Insp Findings in Area of Emergency Operating Procedures & Mgt Control of Watchstander Qualifications IR 05000269/19890261989-08-0303 August 1989 Partially Withheld Insp Repts 50-269/89-26,50-270/89-26 & 50-287/89-26 on 890724-26 (Ref 10CFR73.21 & 2.790(d)). Apparent Violations Noted Re Access Controls.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit ML15224A5611989-07-24024 July 1989 Insp Repts 50-269/89-22,50-270/89-22 & 50-287/89-22 on 890619-0716.No Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Safeguards & Radiation Protection & Plant Startup from Refueling IR 05000269/19890231989-07-19019 July 1989 Insp Repts 50-269/89-23,50-270/89-23 & 50-287/89-23 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Maint Program Implementation ML15224A5701989-07-17017 July 1989 Insp Repts 50-269/89-17,50-270/89-17 & 50-287/89-17 on 890520-0618.Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Safeguards & Radiation Protection & Outage Activities IR 05000269/19890191989-07-12012 July 1989 Insp Repts 50-269/89-19,50-270/89-19 & 50-287/89-19 on 890612-16.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Occupational Exposure,Shipping & Transportation IR 05000269/19890161989-07-10010 July 1989 Insp Repts 50-269/89-16,50-270/89-16 & 50-287/89-16 on 890530-0602.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Testing,Verification of Containment Integrity & Action on Previous Insp Findings IR 05000269/19890181989-06-20020 June 1989 Insp Repts 50-269/89-18,50-270/89-18 & 50-287/89-18 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Reviews of NDE Procedures IR 05000269/19890121989-06-0505 June 1989 Insp Repts 50-269/89-12,50-270/89-12 & 50-287/89-12 on 890415-0519.No Violations Noted.One Major Strength & One Weakness Identified.Major Areas Inspected:Operations, Surveillance Testing & Safeguards & Radiation Protection IR 05000269/19890141989-05-26026 May 1989 Insp Repts 50-269/89-14,50-270/89-14 & 50-287/89-14 on 890515-19.No Violations or Deviations Noted.Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation,Supplies & Training IR 05000269/19890131989-05-26026 May 1989 Insp Repts 50-269/89-13,50-270/89-13 & 50-287/89-13 on 890508-11.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents,Environ Monitoring, Plant Chemistry & Confirmatory Measurements IR 05000269/19890111989-04-20020 April 1989 Insp Repts 50-269/89-11,50-270/89-11 & 50-287/89-11 on 890318-0414.Violations Noted.Major Areas Inspected:Resident Insp Onsite in Areas of Operations,Surveillance Testing, Maint Activities,Safeguards & Radiation Protection ML16127A3261989-04-0303 April 1989 Onsite Resident Insp Repts 50-269/89-08,50-270/89-08 & 50-287/89-08.Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,B&W Owners Group Plant Reassessment Program & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19890051989-03-0707 March 1989 Insp Repts 50-269/89-05,50-270/89-05 & 50-287/89-05 on 890117-0217.Violations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint,Safeguards & Radiation Protection IR 05000269/19890061989-02-27027 February 1989 Insp Repts 50-269/89-06,50-270/89-06 & 50-287/89-06 on 890130-0203.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of NDE Organization,Procedures & Personnel Records IR 05000269/19890041989-02-24024 February 1989 Insp Repts 50-269/89-04,50-270/89-04 & 50-287/89-04 on 890123-27.No Violations Noted.Major Areas Inspected:Fire Protection/Prevention Program Implementation.Weaknesses Identified in Implementation of Fire Protection Program 1990-08-02
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000269/19990121999-09-21021 September 1999 Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 on 990602-0730.No Violations Noted.Major Areas Inspected:Review of Documentation of Licensee Aging Mgt Programs & Exam of Sample of Plant Equipment That Support Util Application IR 05000269/19990051999-09-10010 September 1999 Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000269/19990041999-07-30030 July 1999 Insp Repts 50-269/99-04,50-270/99-04 & 50-287/99-04 on 990223-0703.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000269/19990061999-06-17017 June 1999 Insp Repts 50-269/99-06,50-270/99-03 & 50-287/99-03 on 990411-0522.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000269/19990111999-05-24024 May 1999 Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Major Areas Inspected:Samples of Plant Equipment & Documentation That Supported Duke Energy Application for Renewed Operating Licenses IR 05000269/19990021999-05-0505 May 1999 Insp Repts 50-269/99-02,50-270/99-02 & 50-287/99-02 on 990228-0410.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected:Operations,Engineering, Maint & Plant,Support IR 05000269/19990011999-03-26026 March 1999 Insp Repts 50-269/99-01,50-270/99-01 & 50-287/99-01 on 990117-0227.Violations Noted.Major Areas Inspected: Operations,Maintenance & Engineering ML15261A3941999-02-12012 February 1999 Notice of Violation from Insp on 981102-6 & 16-20.Violation Noted:On 981105,written Procedures with Appropriate Instructions Not Provided for Procedures Involving Potential Release of Radioactivity ML15261A3971999-02-12012 February 1999 Notice of Violation from Insp on 981129-990116.Violation Noted:Licensee Failed to Properly Implement Procedural Requirements for Conducting Continuous Fire Watch IR 05000269/19980111999-02-12012 February 1999 Insp Repts 50-269/98-11,50-270/98-11 & 50-287/98-11 on 981129-990116.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Emergency Response Exercise IR 05000269/19990101999-01-26026 January 1999 Insp Repts 50-269/99-10,50-270/99-10 & 50-287/99-10 on 981102-20 & 990111-15.No Violations Noted.Major Areas Inspected:Operation Re Weakness in Emergency Operating Procedures ML16134A5551998-12-24024 December 1998 NRC Operator Licensing Exam Repts 50-269/98-301, 50-270/98-301 & 50-287/98-301 for Tests Administered on 981130-1203 ML15261A3801998-12-23023 December 1998 Insp Repts 50-269/98-15,50-270/98-15 & 50-287/98-15 on 981102-06,981116-20 & 981211.Violations Noted.Major Areas Inspected:Operations & Engineering ML15261A3791998-12-23023 December 1998 Notice of Violation from Insp on 981102-06,981116-20 & 981211.Violation Identified:Licensee Failed to Update FSAR to Assure That Info Included in FSAR Contained Latest Matl Developed & Updates Did Not Include All Changes IR 05000269/19980101998-12-22022 December 1998 Insp Repts 50-269/98-10,50-270/98-10 & 50-287/98-10 on 981018-1128.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15261A3841998-12-22022 December 1998 Notice of Violations from Insp on 981018-1128.Violations Noted:Corrective Actions Taken in Response to Condition Adverse to Quality Inadequate & Design Control Measures for Mod Nsm ON-32885/0 Did Not Ensure Quality Stds IR 05000269/19980091998-11-13013 November 1998 Insp Repts 50-269/98-09,50-270/98-09 & 50-287/98-09 on 980906-1017.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML15261A3691998-11-13013 November 1998 Notice of Violation from Insp on 980906-1017.Violation Noted:Licensee Did Not Maintain Sufficient Records to Furnish Evidence of Activities Affecting Quality,Including Review for Suitability of Application of Equipment IR 05000269/19980131998-10-27027 October 1998 Insp Repts 50-269/98-13,50-270/98-13 & 50-287/98-13 on 980817-20.Exercise Weaknesses Noted.Major Areas Inspected: Observation & Evaluation of Biennial Emergency Preparedness Exercise ML15118A3171998-10-0505 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980522,licensee Made Changes to Facility as Described in FSAR Without Adequate Written Safety Evaluation Providing Basis That Change Did Not Involve Safety Question IR 05000268/19980081998-10-0505 October 1998 Errata to Notice of Violation Re Insp Repts 50-268/98-08, 50-270/98-08 & 50-287/98-08.Notice of Violations Was Incorrectly Instead of 981005 ML15118A3181998-10-0505 October 1998 Insp Repts 50-269/98-08,50-270/98-08 & 50-287/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000269/19980141998-09-22022 September 1998 Insp Repts 50-269/98-14,50-270/98-14,50-287/98-14, 50-369/98-14,50-370/98-14,50-413/98-14 & 50-414/98-14 on 980824-28.No Violations Noted.Major Areas Inspected:Plant Support.Specific Area Includes Access Authorization Program IR 05000269/19980071998-08-24024 August 1998 Insp Repts 50-269/98-07,50-270/98-07 & 50-287/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15261A3751998-08-0505 August 1998 Notice of Violation from Insp on 980422-0520.Violation Noted:Licensee Failed to Ensure That Design Bases for HPI, LPI & Bs Sys in Plant Units Were Correctly Translated Into Drawings & Procedures ML15261A2091998-07-31031 July 1998 EN-98-056:on 980807,notice of Violation for Level II Violation Will Be Issued to Licensee,But NRC Will Exercise Enforcement Discretion Per Section VI.B.3 of Enforcement Policy & Not Issue Civil Penalty ML15118A3071998-07-13013 July 1998 Notice of Violation from Insp on 980503-0613.Violations Noted:On 980518,self Disclosing Event Revealed That Procedure Did Not Exist for Adjustment of Loss of Coolant Restraints on Reactor Coolant Pumps IR 05000269/19980061998-07-13013 July 1998 Insp Repts 50-269/98-06,50-270/98-06 & 50-287/98-06 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML15118A2981998-06-0505 June 1998 Notice of Violation from Insp on 980302-20.Violation Noted: as of 980311 USQ Due to Increase in Probability of Malfunction of Equipment Important to Safety Previously Evaluated in Safety Analysis Rept Was Not Identified ML15261A3591998-06-0303 June 1998 Insp Repts 50-269/98-12,50-270/98-12 & 50-287/98-12 on 980422-0520.No Violations Noted.Major Areas Inspected: Engineering ML15118A2921998-06-0101 June 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:During 960314-980401,licensee Failed to Correct Condition Adverse to Quality in That Instances of Failure to Do QA Review Prior to Issuance of Instructions Occurred ML15118A2941998-06-0101 June 1998 Insp Repts 50-269/98-05,50-270/98-05 & 50-287/98-05 on 980322-0502.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML15118A3471998-05-0404 May 1998 Notice of Violation from Insp on 980302-06 & 16-20.Violation Noted:As of 980305,calculation for post-accident Control Room Operator Dose Contained Incorrect & Nonconservative Assumptions IR 05000269/19980031998-05-0404 May 1998 Insp Repts 50-269/98-03,50-270/98-03 & 50-287/98-03 on 980302-06 & 16-20.Violations Noted.Major Areas Inspected: Plant Operations,Maint & Engineering ML15118A3401998-04-20020 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:On 980211,licensee Made Temporary Changes to Hotwell Suction Line for Unit 2 Tdefwp W/O Implementing Temporary Mod Process Specified in Nuclear Sys Directive 301 IR 05000269/19980021998-04-20020 April 1998 Insp Repts 50-269/98-02,50-270/98-02 & 50-287/98-02 on 980208-0321.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15118A3351998-03-25025 March 1998 Insp Repts 50-269/98-04,50-270/98-04 & 50-287/98-04 on 980302-05.Violations Noted.Major Areas Inspected:Plant Support,Including Review of Random Samples of Security Procedures ML15118A3341998-03-25025 March 1998 Notice of Violation from Insp on 980302-05.Violation Noted: Safeguard Info Found to Be Unattended & Not Locked in Security Storage Container ML15118A3301998-03-18018 March 1998 Notice of Violation from Insp on 980126-0205.Violation Noted:Excessive Amount of Purge Paper Used on 980131 in Support of Welding Drain Line Connected to Unit 1 Pressurizer Surge Line ML15118A3311998-03-18018 March 1998 Insp Repts 50-269/98-01,50-270/98-01 & 50-287/98-01 on 980126-0205.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML15118A3271998-03-0505 March 1998 Insp Repts 50-269/97-18,50-270/97-18 & 50-287/97-18 on 971228-980207.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000269/19970161998-01-26026 January 1998 Insp Repts 50-269/97-16,50-270/97-16 & 50-287/97-16 on 971116-1227.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100116/20120271998-01-26026 January 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:On 971201,during Performance of Procedures PT/1/A/0202/012,Engineered Safeguards Channels 1 & 2 Functional Test,Rev 5,test Personnel Unaware of Test Impact PNO-II-97-065A, on 971228,SG 1A Tube Leak Update Made. Licensee Also Conducted Base Line Pressure Testing & Insps of 1B SG on 980107,finding Only Minor Leakage from Welded Tube Plug.State of Sc Notified by NRC1998-01-0808 January 1998 PNO-II-97-065A:on 971228,SG 1A Tube Leak Update Made. Licensee Also Conducted Base Line Pressure Testing & Insps of 1B SG on 980107,finding Only Minor Leakage from Welded Tube Plug.State of Sc Notified by NRC IR 05000269/19970171997-12-31031 December 1997 Insp Repts 50-269/97-17,50-270/97-17 & 50-287/97-17 on 971201-04.No Violations Noted.Major Areas Inspected: Aspects of Licensees Plant Support Activities,Including Physical Security Plan & Vital Area Access Control PNO-II-97-065, on 971228,initiated Controlled Shutdown of Unit Due to Exceeding TS Leakage Limit of 150 Gpd.Licensee Continuing W/Plant Depressurization & Cooldown & Outage Planned of Several Days to Investigate & Repair SG1997-12-29029 December 1997 PNO-II-97-065:on 971228,initiated Controlled Shutdown of Unit Due to Exceeding TS Leakage Limit of 150 Gpd.Licensee Continuing W/Plant Depressurization & Cooldown & Outage Planned of Several Days to Investigate & Repair SG ML15261A3531997-12-19019 December 1997 SALP Repts 50-269/97-99,50-270/97-99 & 50-287/97-99 for 960505-971115 IR 07100019/20110151997-12-15015 December 1997 Notice of Violation from Insp on 971019-1115.Violation Noted:Units 1 & 3 Low Pressure Injection Flow Channels Not Calibrated within Required Refueling Interval ML15118A2771997-12-15015 December 1997 Insp Repts 50-269/97-15,50-270/97-15 & 50-287/97-15 on 971019-1115.Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Engineering,Maint & Plant Support ML15118A2681997-11-17017 November 1997 Notice of Violation from Insp on 970907-1018.Violation Noted:Station Was Not Operated IAW Periodic Test Procedures & Instructions in Alarm Response Guide Were Not Appropriate 1999-09-21
[Table view] |
Inspection Report - Oconee - 1982012 |
---|
|
|
Text
.
.
.
'/
UNITED STATES E
4, NUCLEAR REGULATORY COMMISSION
E REGION 11 k
101 MARIETTA ST., N.W., SUITE 3100 g
ATLANTA, GEORGIA 30303
.....
Report No. 50-269/82-12, 50-270/82-11 and 50-287/82-11 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Oconee Nuclear Station Docket No. 50-269, 50-270 and 50-287 License No. OPR-38 DPR-47 and DPR-55 Inspection at Oconee site near Seneca, South Carolina Inspectors:
$2 h. -[Ma*[W
,b' n 3t/J3
%
W. Orders {
g
/
Date Signed 0 0 2clar$w. l, 4 /3e/8.a 0. Falcong,
} g
,/ "
Lat'e S1'gned L/ A d /
uf8f L
Approved by:
/
J.
ry* ant;'$ecprfn I61'ef, Division of
. Dat'e Signed
.
Pr ect and ReW' dent Programs SUMMARY Inspection on March 10 - April 10,1982 Areas Inspected This routine, announced inspection involved 340 resident inspector-hours on site in the areas of operational safety, mechanical maintenance, surveillance testing, design change / modification program, and licensee event analysis.
Results Of the five areas inspected, no items of noncompliance or deviations were identified in three areas; two items of noncompliance were found in two areas (Violation - Failure to have two trains of spent fuel pool ventilation operable '
during fuel movement-paragraph 9; Violation - Failure to submit a summary of the safety evaluations of facility changes in annual report paragraph 10).
o$$o0$l9 PDR
.
.
DETAILS 1.
Persons Contacted Licensee Employees
- J. Ed Smith, Station Manager
- G. Vaughn, Assistant Plant Manager
- T. Cribbe, Licensing & Project Engineer
- N. Pope, Supervisor Operations
- T. Owen, Supervisor Technical Services Other licensee employees contacted included construction craftsmen, technicians, operators, mechanic, and office personnel.
" Attended exit interview
.2.
Exit Interview The inspection scope and findings were summarized on April 8,1982 with those persons indicated in Paragraph 1 above.
The licensee acknowledged understanding of the enclosed violations, with no other significant comment.
3.
Licensee Action on Previous Inspection Findings (Closed) Violation (50-269/81-04-03):
Failure to label radioactive waste.
A reply to this item was not requested.
(Closed) Violation (50-269/81-18-01):
Failure to follow couadure for equipment removal and restoration. Operations and mainter.ance personnel.
have been instructed on the methods of isolating equipment and the con-sequences of isolating equipment not required to be isolated. A procedure has been issued to cover the proper removal from and return to service of the 6900/4160/600 volt breakers. The procedure includes verification of the position of the spring charging motor switch. The corrective actions appear adequate.
(Closed)
Violation (50-269/81-30-01):
Failure to follow radwaste procedures. Shift personnel have been instructed and appropriate procedures have been revised to notify chemistry of any changes needed in LHST valve line-ups. The corrective actions appear adequate.
(Closed) Violation (50-269/81-32-01): Failure to perform radiation survey.
The cited areas were surveyed, roped-off and properly posted. The correc-tive actions appear adequate.
.
.
%
(Closed) Violation (50-270/81-30-01): Failure to perform radiation survey.
The cited area was surveyed, roped-off and properly posted. The pH sampling line has been extended and buried to allow water to drain directly into the pond. The corrective actions appear adequate.
(Closed) Violation (50-270/81-32-02):
Failure to follow control of
,
secondary contamination procedure. The licensee has revised the procedure to include sign-off steps for returning the sump pumps to local manual mode.
The incident was also reviewed and discussed by operations shift personnel.
The corrective actions appear adequate.
'
(Closed) Violation (50-287/81-02-02):
Failure To follow removal and
restoration procedure. The licensee counseled those personnel involved and discussed with all shift supervisors the importance of a thorough review of removal and restoration sheets prior to their issue. The corrective actions appear adequate.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Plant Operations The inspector reviewed plant operation: throughout the report period, March 10 - April 10,1982 to verify conformance with regulatory requirements, technical specifications and administrative controls.
Control room logs, shift supervisor logs, shift turnover records and equipment removal and restoration records for the three units were routinely perused.
Interviews
!
were conducted with plant operations, maintenance, chemistry, health physics, and performance personnel on day and night shifts.
i Activities within the control rooms were monitored during all shifts and at
!
shift changes.
Actions and/or activities observed were conducted as j
prescribed in Station Directives. The complement of licensed personnel on
!
each shift met or exceeded the minimum required by the technical specifi-cation Operators were responsive to plant annunciator alarms and appeared to be cognizant of plant conditions.
Plant tours were taken throughout the reporting period on a continual basis.
The areas toured included, but are not limited to the following:
Turbine Building
'
Auxiliary Building
!
Units 1, 2, and 3 Electrical l
Equipment Rooms l
Units 1, 2, and 3 Cable Spreading Rooms Units 1, 2 and 3 Penetration Rooms i
l
!
L
.
.
Station Yard Zone within the protected area Units 1 and 3 Reactor Buildings During the plant tours, ongoing activities, housekeeping, security, equip-ment status and radiation control practices were observed.
Oconee Unit 1 began the report period in a force outage to repair a tube leak in the B steam generator. The leak was identified as tube 78-2 and was subsequently stabilized and plugged.
Following completion of maintenance the unit achieved criticality at 6:45 a.m. or March 24, and was placed on line at 5:05 p.m. that day. The reactor experienced a trip from approximately 35's power at 7:30 p.m. the same day resulting from a feedwater swing ini tiated. by a malfunctioning turbine header pressure instrument.
The unit was placed back on line at 10:37 p.m. following resolution of the instrument malfunction.
The unit attained full power on March 26, 1982. On April 2 the reactor tripped from full power on a variable low pressure signal which resulted from the inadvertent trip of the Group 6 control rods.
It was subsequently determined that the rods tripped due to a control rod drive power supply gate circuit malfunction.
The power supply was repaired.
The reactor attained criticality at 11:45 p.m. April 3, and was placed on line at 3:51 a.m. on April 4.
At the close of the report period, Oconee Unit 1 is at full power with no discernable problems.
Oconee Unit 2 continued an ISI/ refuel outage throughout the report period.
Core reload began on March 15 and was completed on March 19.
HPI nozzle i
repair, which evolved from inspections performed pursuant to problems identified at Crystal River, is ongoing at the conclusion of this report
,
'
period, and will be completed prior to unit restart. More details on this topic is elsewhere in this report.
The unit is expected to be placed on line on April 24, 1982.
,
l Oconee Unit 3 began the report period in a forced outage to repair a steam
'
generator tube leak. The unit was shut down on February 15, 1982 to repair what was identified to be a leak in tube 2-4 which was subsequently l
stabilized and plugged. The HPI makeup and injection nozzles were inspected l
and repaired during the outage as a result of cracking identified at Crystal River; more details concerning nozzle inspection is elswhere in this repr':.
Following completion of the outage, the unit achieved criticality on March 29 and was placed on line at 8:56 a.m. on March 30. Full power was attained on April 2, and at the close of the report period, is being maintained.
__ _
,
_ _ _ _ _ _ _ _ - _
.
6.
Surveillance Testing The surveillance tests detailed below were analyzed and/or witnessed by the inspector to ascertain procedural and performance adequacy.
The completed test procedures examined were analyzed for embodiment of the necessary test prerequisites, preparations, instructions, acceptance criteria and sufficiency of technical content.
The selected tests witnessed were examined to ascertain that current written approved procedures were available and in use, that test equipment in use was calibrated, that test prerequisites were met, system restoration completed and test results were adequate.
The selected procedures perused attested conformance with applicable Technical Specifications; they appeared to have received the required administrative review and they apparently were performed within the surveillance frequency prescribed.
Procedure Title PT/1/A/600/10 RCS Leakage Evaluation Test PT/0/A/150/09 Personnel Hatch PT/0/A/610/17 4160 Breakers IP/0/B/340/02 CRD DC Hold Power Supply IP/0/A/301/35 SR & IR Channel IP/0/A/0310/12A HPI & RB On-line Test IP/0/A/310/13B LPI Logic On-line IP/0/A/0310/14A ES Channel A On-line PT/0/A/200/44 Fuel Transfer System PT/0/A/255/1 Air Leak Test PT/1/A/600/01 Periodic Instrument Surveillance PT/1/A/610/5A Breaker Trip Test PT/0/A/610/4A Central Tie Logic The inspector employed one or more of the following acceptance criteria for evaluating the above items:
10 CFR ANSI N 18.7 Oconee Technical Specifications Oconee Station Directive Duke Administrative Policy Manual Within the areas inspected no items of noncompliance or deviations were identi fied.
a
.
.
.
7.
Maintenance Activities
=
c Maintenance activities were observed an/or reviewed throughout the report period to ascertain that the work was being performed by qualified person-nel, that activities were accomplished employing approved procedures or the
. activity was within the skill of the trade.
Limiting conditions for operation were examined to ensure that technical specification requirements were satisfied. Activities, procedures, and work requests were examined to ensure adequate fire protection, cleanliness control and radiation protec-tion measures were observed and that equipment was properly returned to service.
Acceptance criteria employed for this review included, but were not limited
"
to:
STATION DIRECTIVES ADMINISTRATIVE POLICY MANUAL TECHNICAL SPECIFICATIONS TITLE 10 CFR.
Detailed below are 15 of 52 maintenance activities which were observed and/or reviewed during the report period:
Work Request Procedure Component 20333 MP/0/A/3000/22 1MS-4 TM/1/A/4000/115A 20334 MP/0/A/3000/22 1MS-8 TM/I/A/4000/115A 50593B MP/0/A/1150/12 Rx Vessel Studs 13639 MP/0/A/1800/16 3Al RCP 15863 N/A 2-HD-17 21723 MP/0/A/1800/1 2-CF-2 MP/0/A/1200/26 52128B TM/2/A/400/107 HPI Nozzels 13783 MP/0/A/1200/01 2FDW-38 57788B MP/0/A/2001/3C SWGR-270
._.
_
-
_-
_ _.
--
-
- - ' -
'
,.
.
.
.
1 21758 MP/0/A/1800/01 FDW-104 21429 MP/0/A/1200/02 MS-86~
22707 MP/0/A/1200/02A 2-85-25-23345 MP/0/A/1200/01 LT-5 51807 MP/0/A/1200/19 RC-66 23292 IP/0/A/0100/01 LPSW-24 Within the areas inspected no violations were identified.
8.
HPI Nozzle Degradation
.
On February 5,1982, the licensee became aware of a cracking problem in the HPI nozzles at Crystal River.
As a result,,an extensive examination of the suspected areas on Units 1, 2 and 3 was performed.
Two cracked safe-ends, one cracked thermal sleeve and four loose thermal sleeves were identified.
All repairs have been completed.
The following table summarizes the examination results and the necessary repairs.
f
>
.
(
f
!
..-
- -.
.
.
..
.
___ _ _ _ _ -
-_
__
_ _ - - _ _ _
. _ _ _.
}
STATUS Of HPI NO27LES
Thermal Pope PT T he rma l Nozzh Sleeve Crack RT Inside UT Special S leevitepa i red 1A1 Oh Hone Yes No Yes-C lea r NorHY N/A 1A2 OK None Yes Yes Ye s-C l ea r Hone
'Yes 181 OK None Yes No Yes-Clear Hone N/A Ill?
OK None Yes No Yes-Clear None N/A 2A1 UK None Yes No Yes-Clear None Yes 2A2 Loose Yes Yes Yes Yes-Indications Replaced Yes 2tl1 Loose None Yes Yes Yes-Clear Lepanded Yes 2B2 Cracked None Yes Yes Ye s-C l ea r Replaced Yes 3A1 OK None Yes No Yes-Cl ea r fione N/A 3A2 Loose Yes Yes (es Yes-Indications f'ep l a ced Yes 301 Loose None Yes Yes Ye s-C i ca r Expanded Yes 3152 OK None Yes No Yes-Clear None N/A
'A fitup problem on a 1" warming l ine was repa i red.
.
,
I
.
,
'
u
%
'
. 1 I
l
.
9e
,
O
-
- _ _
.-
.
.
-
--
__
...
.
_..
- -
.
.
i 9.
Fuel Handling Operations On March 30, 1982, the licensee discovered the Unit 3 spent fuel pool ventilation system to be inoperable.
Investigation revealed that the control power breaker to the spent fuel pool ventilation fans had been
tagged open on March 23, 1982 for the performance of procedure PT/3/A/
i 0150/27, Local Type B Leak Rate Test for penetration numbers 19 and 20.
Although the procedural step requiring the restoration of system / equipment i
affected by the local leak rate test had been signed off, the tagged open control power breaker to the spent fuel pool ventilation fans was not restored.
Failure to restore control power to the spent fuel pool ventilation fans, step 12.1.11 of the procedure, resulted in the movement of
,
ten fuel assemblies within the Unit 3 spent fuel pool with the spent fuel
pool ventilation system inoperable.
In a similar occurrence on April 2, 1982, the licensee moved one fuel
'
assembly to the sipping can within the Unit 1 and 2 spent fuel pool with the spent fuel pool ventilation system inoperable. The system had been removed from service to perform a purge system filter test. The operator failed to follow procedure OP/0/A/1506/01, Fuel and Component Handling Operating Procedure which requires the verification of spent fuel pool ventilation
system operability prior to the movement of fuel within the spent fuel pools.
Technical Specification 3.8.12 requires both trains of spent fuel pool ventilation system to be operable during the movement of fuel within the spent fuel pool.
The failure to follow procedures as detailed above resulted in the movement of ten fuel assemblies in the Unit 3 spent fuel pool and one fuel assembly in the Units 1 and 2 spent fuel pool with both
,
trains of spent fuel pool ventilation system being inoperable. This is a l
Violation (50-287/82-12-01).
I 10.
Design Change and Modification Program In an inspection performed by regional inspectors during the period of March
'
23-27, 1981, the results of which were recorded in inspection report a
50-269/81-06, the area of tests and experiments program was scrutinized.
In that inspection, the inspectors verified the following aspect of the program:
A formal method has been established to handle all requests or
-
i proposals for conducting special tests involving safety-related
'
components.
,
e- -
,.-e,
.
.-
---,n
_ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
,
,
'
Special tests will be performed in accordance with approved procedures
-
Responsibilities have been assigned for reviewing and approving special
-
test procedures A system, including assignment of responsibility, has been established
-
to assure that special tests will be reviewed.
Responsibilities have been assigned to assure a written safety
-
evaluation required by 10 CFR 50.59 will be developed for any special test to assure that it does not involve an unreviewed safety evaluation or change in Technical Specifications.
i Based on their review, one violation was identified (269, 270, 287/81-06-01)
concerning the following:
10 CFR 50.59 (b) requires that licensees submit a brief description of changes made to the facility pursuant to that section and also provide to the NRC a summary of the safety evaluation for each change.
The 1979 list of Oconee f acility changes submitted to the NRC on October 27, 1980 did not contiin a summary of the safety evaluations for the listed modifications.
This failure to provide a summary of safety evaluations to the NRC was a violation of 50.59 requirement.
The licensee responded to that violation, admitting non-compliance stating that all future reports required by 10 CFR 50.59 (b) will contain a safety evaluation of each modification.
In a letter dated November 20, 1981 the licensee transmitted a description of all facility changes station modifications which were completed between January 1, and December 31, 1980; a report required by 10 CFR50.59(b).
Similar to the report tendered for the year of 1979, the 1980 report did not contain a summary safety evaluation of each modification.
10 CFR 50.59 requires that a summary of the safety evaluation of each change to the facility made pursuant to this section be submitted to the NRC at least annually.
Facility change safety evaluation summaries were not submitted to the NRC in that neither 1979 nor the 1980 lists of Oconee facility changes submitted to the NRC on October 27, 1980 and November 20, 1981 contained a summary of the safety evaluations for the listed modifications.
The above detailed occurrence constitutes a repeat violation of the requirements of 10 CFR 50.59(b). (269/82-12-02)
.
_
_
_
.
..
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
_ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
.
,
.
11.
Contaminated Injury I
At 11:20 a.m. on March 24, 1982 a worker in the spent fuel pool area shared by Units 1 and 2 was exchanging cables on a sling used to transport a spent
,
fuel cask basket. The cable skipped, resulting in a portion of two of the worker's fingers being severed. The worker, whose arm was contaminated in the accident, was transported to the Oconee Memorial Hospital after removal of his anti-contamination clothing.
The licensee provided health physics personnel monitoring during transport and at the hospital. The hospital was prepared for a contaminated patient, i
'
rendered medical attention, and successfully decontaminated the patients arm to acceptable levels.
The licensee failed to realize, during the foregoing, that the transport of a contaminated individual from site to offsite constituted an initiating condition of the Unusual Event category of their Emergency Plan.
The licensee later realized the error, notified the parties normally notified during the parties normally notified an unusual event, and closed
'
'
the incident.
Although the licensee did not comply with the requirements delineated in their Emergency Plan nor their Emergency Action Level - Unusual Event implementing procedure, AP/0/A/1000/02, the noncompliance was licensee identified, reported and corrected.