IR 05000269/1982031

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-269/82-31,50-270/82-31 & 50-287/82-31 on 820802-06.Noncompliance Noted:Security organization-personnel.Details Withheld (Ref 10CFR73.21)
ML20027B834
Person / Time
Site: Fort Saint Vrain, Oconee  
Issue date: 08/19/1982
From: Hall B, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20027B782 List:
References
50-269-82-31, 50-270-82-31, 50-287-82-31, NUDOCS 8209300182
Download: ML20027B834 (1)


Text

{{#Wiki_filter:SAFEGUgQMgORMATION [[,y,, NUCLEAR REGULATORY COMMISSION

o 8' h, REGION 11 s-

.E 101 MARIETTA ST., N.W., SufTE 3100

ATLANTA. CEoRGIA 30303 o AUG 191982 ..... Report Nos. 50-269/82-31; 50 /0/82-31 and 50-287/82-31 Docket Nos. 50-269; 50-270 License Nos. DPR-38, DPR-47 and 50-287 and DPR-55 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Oconee Nuclear Station Inspection at: Near Seneca, S. C.

Inspection conducted: August 2-6, 1982 Date of Last Physical Security Inspection Visit: May 16-20, 1982 Type of Inspection: Unannounced Physical Security Inspector _c,_ f]

. Hall, Physical Protection Inspector ate' Signed Approved by: ~ P /7!82-D. R. McGuire, Chief, Physical Protection Section ate' Signed ~ Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Included review of Facility Orientation; Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit: Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers-Protected Areas; Physical Barriers-Vital Areas; Security ' System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Areas; Detection Aids-Vital Areas; Alarm Stations; Communications; and Materials Control and Accountability.

The inspection involved 38 inspector hours on site by one NRC inspector. The inspection was begun during an offshift period; 8 inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the 22 areas examined during the inspection except for the following item: 1.

Security Organization-Personnel O M CONirigg L0 TION.

77 3 ** '*oomtt$. 8209300182 820927 PDR ADOCK 05000269 G PDR - -- - -. }}