IR 05000269/1982016

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-269/82-16,50-270/82-16 & 50-287/82-16 on 820516-20.No Noncompliance Noted.Major Areas Inspected:Security Plan,Physical Barriers,Lighting & Alarm Stations.Details Withheld (Ref 10CFR73.21)
ML20053D853
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/01/1982
From: Hall B, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20053D833 List:
References
50-269-82-16, 50-270-82-16, 50-287-82-16, NUDOCS 8206070385
Download: ML20053D853 (1)


Text

,

SAFEGUARElEORMATION

. ['Ao...,k NUCLEAR REGULATORY COMMISSION

y g

REGION 11

.

%*

aC 101 MARIETT A ST., N.W., Sulf E 3100 0,

[

ATLANTA. GEORGI A 3o303 g

  • e JUN 1 ne

-

Report Nos. 50-269/82-16; 50-270/82-16 and 50-287/82-16 Docket Nos. 50-269, 50-270, and 50-287 License Nos. DPR-38, DPR-47 and DPR-55 Licensee:

Duke Power Compan)

422 Church Street Charlotte, NC 20247 Facility Name: Oconee 1, 2, and 3 Inspection at: Oconee Nuclear Stacion near Seneca, SC Inspection conducted: May 16-20, 1982 Date of Last Physical Security Inspection Visit: January 11-14, 1982 Type of Inspection:

Unannounced Physical Security Inspector: Mam_

.2fyAlit.

B. L. Hall, Physical Security Inspector Signed 6///82.

Approved by:

u

D. R. McGuire, Chief, Physical Protection Section Date ' Signed Technical Inspection Branch Division of Engineering and Technical Programs

,

Inspection Summary Areas Inspected:

Included review of Facility Orientation; Security Plan and Implementing Procedures: Security Orgar.ization-Management; Security Organization-Personnel: Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance: Locks, Keys and Combinations; Physical Barriers-Protected Areas; Physical Barriers-Vital Areas: Secur ity System Power Supply; Lighting: Assessment Aids; Access Controi-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Areas; Detection Aids-Vital Areas Alarm Stations; and Communications.

The inspection involved 42 inspector hours on site b; one NRC inspector.

The inspection was begun during an offshift period; eight inspection hours were accomplished during offshift periods.

Results:

The licensee was found to be in compliance with NRC requirements within the 21 areas examined during'the inspection.

S-F2 3M b

-

Copy

of 4 Copies ECLOSURE CONTAINS Il Pages SAFEGUAEDS INFORMATION.

This Docurent is not to be UPON SEPARATION THIS reproduced without specific PAGE IS DECONTROLLED.

approval of II:II 8206070385 820601

'

S""^

"

"

"M FEGUARDS INFORMATION

.