IR 05000269/1982002

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-269/82-02,50-270/82-02 & 50-287/82-02,on 820111-14.No Noncompliance Noted.Major Areas Inspected:Review of Security Organization,Security Program Audit,Records & Repts.Details Withheld (Ref 10CFR2.790)
ML20040F094
Person / Time
Site: Oconee  
Issue date: 01/29/1982
From: Goode R, Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20040F091 List:
References
50-269-82-02, 50-269-82-2, 50-270-82-02, 50-270-82-2, 50-287-82-02, 50-287-82-2, NUDOCS 8202080309
Download: ML20040F094 (1)


Text

.

  1. pmm'o

.

UNITED STATES

.

~

,

NUCLEAR REGULATORY COMMISSION n

$

E REGION 11 o,

[

101 MARIETTA ST., NXt., SUITE 3100 ATLANTA, GEORotA 3T

%..****&

FEB 1 188 Report Nos. 50-269/82-02, 50-270/82-02 and 50-287/82-02 Docket Nos. 50-269, 50-270 and 50-287 License Nos. DPR-38, DPR-47 and DPR-55 Licensee: Duke Power Company ATTN:

W. O. Parker, Vice President Steam Production P. O. Box 2178 Charlotte, North Carolina Facility Name: Oconee Nuclear Station Inspection at: Seneca, South Carolin; Inspection conducted: January 11-14, 1982 Date of Last Physical Security Inspection Visit: October 5-9, 1981 Type of Inspection: Unannounced Physical Security Inspectors: N

$_

\\

_I J ci/,

W. J. Tobingysical Security Inspector Date$igned WL1 Y u:0, 44.

.;/sha R. W.'G~oode',gysical Secur'ity}nspector Date Signed

_ /!29 82-Approved by:

r.,

U. R. McGuire, Chief, Physical Protection Section 1/ ate'51gned Technical Inspection Branch, Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:

Included review of security organization, security program audit, records and reports, testing and maintenance, physical barriers, security system power supply, lighting, assessment aids, detection aids, alarm stations and communications.

The inspection involved 64 inspector hours by two NRC inspectors.

The inspection was begun during an offshift period; eight inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the 11 areas examined during the inspection.

S-F2

"o&--

_ Copies 4D

__

Copy g

or EECCJts C;nTAIy3 8202080309 820201 (o Pages SAFRUARDS IMO.WATION.

hDRADOCK05000 Thic Docu: cent is not to be UPON SEPARATION THIS reproduced withcut specific ms zS orconTaous. nure=tari=

.