IR 05000269/2023002
| ML23208A326 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/28/2023 |
| From: | Eric Stamm NRC/RGN-II/DRP/RPB1 |
| To: | Snider S Duke Energy Carolinas |
| References | |
| IR 2023002 | |
| Download: ML23208A326 (17) | |
Text
SUBJECT:
OCONEE NUCLEAR STATION - INTEGRATED INSPECTION REPORT 05000269/2023002, 05000270/2023002 AND 05000287/2023002
Dear Steven Snider:
On June 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Oconee Nuclear Station. On July 27, 2023, the NRC inspectors discussed the results of this inspection with Jamie Dodson and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Eric J. Stamm, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 05000269, 05000270 and 05000287 License Nos. DPR-38, DPR-47 and DPR-55
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000269, 05000270 and 05000287
License Numbers:
Report Numbers:
05000269/2023002, 05000270/2023002 and 05000287/2023002
Enterprise Identifier:
I-2023-002-0021
Licensee:
Duke Energy Carolinas, LLC
Facility:
Oconee Nuclear Station
Location:
Seneca, South Carolina
Inspection Dates:
April 1, 2023, to June 30, 2023
Inspectors:
J. Nadel, Senior Resident Inspector
N. Smalley, Acting Senior Resident Inspector
A. Ruh, Resident Inspector
A. Hutto, Senior Project Engineer
B. Kellner, Senior Health Physicist
D. Neal, Health Physicist
N. Peterka, Senior Fuel Facility Project Inspector
J. Rivera, Health Physicist
Approved By:
Eric J. Stamm, Chief
Reactor Projects Branch 1
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Oconee Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near 100 percent rated thermal power (RTP) for the entire inspection period.
Unit 2 operated at or near 100 percent RTP for the entire inspection period.
Unit 3 operated at or near 100 percent RTP from the beginning of the inspection period until June 24, 2023, when a power reduction to 20 percent RTP was conducted for leak hunt activities. On June 25, 2023, the unit was shut down to repair a leak on low pressure service water system piping. Unit 3 was started up and returned to 20 percent RTP on June 26, 2023.
On June 27, 2023, Unit 3 operated at or near 100 percent RTP for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Units 1 and 2 low pressure service water system following restoration of low pressure service water train C on April 11, 2023
- (2) Keowee Hydro Unit 1 governor oil and actuator systems while Keowee Hydro Unit 2 was out of service for planned maintenance on May 9, 2023
- (3) Keowee Hydro Unit 1 electrical alignment while Keowee Hydro Unit 2 was out of service for planned maintenance on May 9, 2023 (4)2A low pressure injection train following maintenance on May 23, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire zone 112: Unit 3 control room on April 28, 2023
- (2) Fire zone 19: Unit 1 main feed pump area on April 28, 2023
- (3) Fire zone 89: Unit 3 equipment room on May 15, 2023
- (4) Fire zone 105: Unit 2 cable room on June 22, 2023
- (5) Fire zone 85: Unit 1 auxiliary building 200 level hallway on June 23, 2023
71111.06 - Flood Protection Measures
Flooding Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated internal flooding mitigation protections in the embedded conduits for diesel generator cabling in the standby shutdown facility.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the main control room during Keowee hydro station over frequency testing on May 3, 2023, and Unit 3 downpower on June 24, 2023.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated SEG 2211, Cold Crew Simulator Evaluation, on May 22, 2023.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
- (1) Nuclear condition reports (NCR) 2473173, 2466960, low pressure service water pump C fail to run events on March 29, and May 17, 2023
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Units 1, 2, and 3, green risk during underground emergency power path planned maintenance, on April 11, 2023
- (2) Unit 2 green risk during control rod drive pulse generator and monitoring module replacement, on April 12, 2023
- (3) Units 1, 2, and 3, green risk during heavy lifts and construction activity in 230kV switchyard, on April 18, 2023
- (4) Units 1, 2, and 3, green risk during Keowee Hydro Unit 2 planned maintenance, on May 9, 2023
- (5) Units 1 and 2, green risk during low pressure service water pump inoperability and troubleshooting, on May 18, 2023
- (6) Units 1, 2, and 3, yellow risk during standby shutdown facility annual maintenance outage, on June 14, 2023
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (8 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) NCR 2468647, low pressure service water suction strainer to pump expansion joint control unit gaps different than specified on drawings
- (2) NCR 2471437, deficiencies with essential siphon vacuum post modification testing from 2001
- (3) NCR 2473099, low pressure service water pump testing concerns due to flow instrument accuracy
- (4) NCR 2474520, essential siphon and vacuum system pump suction check valves may not fully open at low air pressures
- (5) NCR 2436929, Unit 1 inservice inspection exam failure to comply with all aspects of 10 CFR 50.55a and ASME IWL for containment tendon maintenance
- (7) NCR 2477210, low pressure service water leak from instrument line on 3A1 reactor coolant pump upper bearing oil cooler outlet piping
- (8) NCR 2477220, 3MS-8 main steam line relief valve lifted during Unit 3 shutdown
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Engineering change 422866, repair broken Unit 3 reactor coolant pump motor cooler A1 bearing outlet pressure connection with alternate piping configuration
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (5 Samples)
- (1) PT/2/A/0620/009, Keowee Operation, following replacement of 13.8kV transformer K2-ELK-TF-2E, on May 10, 2023
- (2) OP/0/A/1650/005, PSW AC Power, following replacement of protected service water breaker B7T-2 with a refurbished unit, on May 11, 2023
- (3) Work orders (WO) 20549009 and 20549064, Auxiliary service water pump functional test following lubrication and alignment check on June 14, 2023,
- (4) PT/0/A/0400/011, SSF Diesel Generator Test, following annual maintenance, on June 15, 2023
- (5) MP/0/A/1200/089, Valve - Main Steam Safety - Setpoint Test, on June 26, 2023
Surveillance Testing (IP Section 03.01) (3 Samples)
- (1) Unit 1 ASME IWL year 50 containment tendon surveillances, WO 20376931-34
- (2) PT/1/A/0204/07B, 1B Reactor Building Spray Pump Test, on April 20, 2023
- (3) PT/0/A/0620/019, Keowee Over Frequency Protection Functional Test, on May 3, 2023
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
- (1) PT/1/A/0251/001, Low Pressure Service Water Pump Test of 'A' pump, on June 21,
RADIATION SAFETY
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment
Walkdowns and Observations (IP Section 03.01) (4 Samples)
The inspectors evaluated the following radioactive effluent systems during walkdowns:
- (1) Unit 3, auxiliary building ventilation system discharge to plant vent stack
- (2) Unit 3, penetration room ventilation system discharge to plant vent stack
- (3) Unit 1, auxiliary building ventilation system discharge to plant vent stack
- (4) Radioactive liquid waste line to the Keowee dam mixing line and ultimate discharge point
Sampling and Analysis (IP Section 03.02) (3 Samples)
Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:
- (1) Rad waste facility ventilation exhaust gas sample (8-hour compensatory sample due to RIA-45 being out of service), on June 13, 2023
- (2) Unit 2 vent stack routine weekly gaseous grab sample, on June 14, 2023
- (3) Unit 2 vent stack routine weekly tritium grab sample, on June 14, 2023
Dose Calculations (IP Section 03.03) (2 Samples)
The inspectors evaluated the following dose calculations:
- (1) Gaseous radioactive release permit #G2023661, (including dose calculation for the maximum individual receptor) May 11, 2023
- (2) Liquid radioactive release permit #L2023542, (including dose calculation for the maximum individual receptor) May 15, 2023
71124.07 - Radiological Environmental Monitoring Program
Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.
Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.
GPI Implementation (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensees implementation of the groundwater protection initiative program to identify incomplete or discontinued program elements.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
- (1) Unit 1 (April 1, 2022, through March 31, 2023)
- (2) Unit 2 (April 1, 2022, through March 31, 2023)
- (3) Unit 3 (April 1, 2022, through March 31, 2023)
MS08: Heat Removal Systems (IP Section 02.07) (3 Samples)
- (1) Unit 1 (April 1, 2022, through March 31, 2023)
- (2) Unit 2 (April 1, 2022, through March 31, 2023)
- (3) Unit 3 (April 1, 2022, through March 31, 2023)
MS10: Cooling Water Support Systems (IP Section 02.09) (3 Samples)
- (1) Unit 1 (April 1, 2022, through March 31, 2023)
- (2) Unit 2 (April 1, 2022, through March 31, 2023)
- (3) Unit 3 (April 1, 2022, through March 31, 2023)
BI02: RCS Leak Rate Sample (IP Section 02.11) (3 Samples)
- (1) Unit 1 (April 1, 2022, through March 31, 2023)
- (2) Unit 2 (April 1, 2022, through March 31, 2023)
- (3) Unit 3 (April 1, 2022, through March 31, 2023)
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
- (1) March 31, 2022, through May 31, 2023
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in complacency and procedure use and adherence that might be indicative of a more significant safety issue.
71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)
- (1) The inspectors evaluated a Unit 3 unidentified reactor building normal sump level transient, leak hunt activities, power reduction, and the licensees performance on June 23,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On June 15, 2023, the inspectors presented the public radiation safety inspection results to Steven Snider and other members of the licensee staff.
On July 27, 2023, the inspectors presented the integrated inspection results to Jamie Dodson, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
2473822
OFD-102A-2.2
Flow Diagram of Low Pressure Injection System LPI Pump
Discharge
Drawings
OM 260-0114.002
20 High Pressure Exp. Jnt. W/ Retaining Rings & Control
Units
Miscellaneous
Clearance OPS-2-17-LP-2LP-154-2001
Work Orders
1997065, 20091928, 20214933, 20375226, 20518466,
20534642
OSC-10816
ONS TCCA A and B Area Basis for AD-EG-ALL-1520
005
OSC-9314
NFPA 805 Transition Risk-Informed Performance-Based
Fire Risk Evaluation
006
Calculations
OSC-9375
ONS Fire PRA - Fire Scenario Report
011
Corrective Action
Documents
2453993, 2456397, 2469135, 2454161, 2454234, 2458096
CSD-ONS-PFP-
Pre-Fire Plan for U1 Auxiliary Building Elevation 783
000
CSD-ONS-PFP-
Pre-Fire Plan for U1 Turbine Building Elevation 775
000
CSD-ONS-PFP-
Pre-Fire Plan for U2 Auxiliary Building Elevation 809
000
CSD-ONS-PFP-
Pre-Fire Plan for U3 Auxiliary Building Elevation 796
001
CSD-ONS-PFP-
Pre-Fire Plan for U3 Auxiliary Building Elevation 822
000
O-0310-K-004
Auxiliary Building Unit 1 Fire Protection Plan & Fire Barrier,
Flood, & Pressure Boundaries Plan at EL 783+9
009
O-0310-K-011
Auxiliary Building Unit 2 Fire Protection Plan & Fire Barrier,
Flood, & Pressure Boundaries Plan at EL 809+3
009
O-0310-L-001
Fire Protect Turbine Building Unit 1 EL 775+0
011
Fire Plans
O-310-K-09
Auxiliary & Reactor Building Unit 3 Fire Protection Plan &
Fire Barrier, Flood & Pressure Boundaries Plan at EL 796+6
& 797+6
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
O-310-K-15
Auxiliary & Reactor Building Unit 3 Fire Protection Plan &
Fire Barrier, Flood & Pressure Boundaries Plan at EL 822+0
& 825+0
O-310-S3-13
Unit 3 Equipment Room Sprinkler System Plan
AD-FP-ALL-1520
Transient Combustible Control
O-0423-AA
Temporary Piping Layout at Alternate RBCU Cooling RBCU
Hale Pump and Hose Layout
2
OFD-124C-1.2
Flow Diagram of High Pressure Service Water System
Turbine Building
Miscellaneous
OFD-124C-3.2
Flow Diagram of High Pressure Service Water System
Turbine Building
AP/3/A/1700/050
Challenging Plant Fire
007
OP/0/A/1106/029
C
Alternate Chilled Water System
2
Procedures
OP/1/A/1104/015
Reactor Building Cooling System
046
Work Orders
20547696, 20597879, 20597865, 20597997, 20597919
Corrective Action
Documents
1907447, 1933544, 2468954
Drawings
O-954-B
Electrical Equipment Layout Standby Shutdown Facility
Embedded Conduit Diesel Room
Work Orders
1649300
Miscellaneous
Simulator Exercise Guise SEG 2211
AD-OP-ALL-0203
Reactivity Management
OP/0/A/1108/001
Curves and General Information
118
OP/3/A/1102/001
Controlling Procedure for Unit Startup
284
OP/3/A/1102/004
Operation at Power
141
Procedures
OP/3/A/1104/007
LWD [Liquid Waste Disposal] System
Corrective Action
Documents
2473173, 2466960
Corrective Action
Documents
2466960, 2473173
Drawings
OEE-217-22
Elementary Diagram 4160V Switchgear #2TC Unit #11 L.P.
Service Water Pump Motor No. C0LPSPU000C
Miscellaneous
SSF Annual Outage Protected Equipment
06/13/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Unit 1 and 2 Phoenix Online Risk Monitor report for
scheduled work week 23W15
IP/0/A/0380/006
Standby Shutdown Facility Diesel Load and Speed Control
IP/0/B/0350/010
CRD Triplex TMR Module Hot/Smart Swap
Procedures
OP/0/A/1600/010
Operation of the SSF Diesel-Generator
Work Orders
20595122, 20603157, 20603158
KC-2003
Turbine Sump Pump Flow Calculation
004
OSC-10899
Analysis of Condensate Coolers A & B Suction and
Discharge Piping, Problem No. 1-13-13
OSC-2708
Rigorous Piping Analysis for Problem 1-14-19 (From LPSW
Strainers to LPSW Pumps)
OSC-6118
Loss of Non Emergency AC Power Event Mitigation
Requirements Type III
016
OSC-6868
Design Input Calculation for NSM-1/33002 Installation for
Reduced NPSH Impeller in Units 1,2,3 LPSW Pumps
OSC-7177
Parametric Study of ESV Float Valve Opening
Characteristics
OSC-7349
Functional Testing of Prototype ESV Float Valve
OSC-7734
Maximum Hypothetical Accident (MHA) Dose Analysis
016
Calculations
OSC-8966
Allowable LPSW Leakage for Containment Operability
Corrective Action
Documents
1773377, 2465304, 2465908, 2465300, 2462512, 181218,
2459895, 2477220, 2477611
KFD-102A-1.1
Flow Diagram of Turbine Sump Pump System
O-2480D
Piping Layout Section and Details Intermediate Floor
Reactor Building
OFD-107B-3.1
Flow Diagram of Liquid Waste Disposal System Reactor
Building Normal Sump
OFD-124B-3.2
Flow Diagram of Low Pressure Service Water System
Reactor Building Cooling Units Cooling Coils 3A, 3B & 3C
OFD-124B-3.4
Flow Diagram of Low Pressure Service Water System RC
Pump Motor Cooling and RB Fire Protection
Drawings
OM 245-1672.001
1878 Socket Ends Stainless Steel Swing Check Valve Non
Cobalt Trim with Resilient Seated Disc
Engineering
Changes
410347
Evaluation of Keowee Station Sump Inputs in Support of EC 405339
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2900
Various, Expansion Joints, Garlock, LFC/KCM Dimension
Changes
LCOTR O-3-23-
00979
U3 RBCU leak isolation
OSS-0254.00-00-
1046
(MECH) Design Basis Spec for Keowee Turbine Generator
Cooling Water (WL) System
017
OSS-0254.00-00-
1047
(Mech) Design Basis Spec for Keowee Turbine Sump Pump
(TS) System
015
Miscellaneous
OSS-0254.00-00-
4001
(Mech) Design Basis Spec for Reactor Building Containment
Isolation
AP/0/A/2000-002
Keowee Hydro Station - Emergency Start
IP/1/A/0400/022
KHU-1 Turbine Sump Pump Level Control Switch
Calibration
011
OP/0/A/2000/013
KHU-1 Generator
29
PT/1/A/2200/019
KHU-1 Turbine Sump Pump IST Surveillance
28
PT/3/A/0150/034
Leak Rate History Record and Reactor Building Leak Rate
Verification
PT/3/A/0251/001
Low Pressure Service Water Pump Test
101
PT/3/A/0251/072
LPSW System Flow Balance Verification
TT/2/A/0261/011
ESV Float Valves Retest
TT/2/A/0261/012
ESV Float Valve Test
Procedures
TT/3/A/0251/064
LPSW Pump Test
Work Orders
01734488, 20500888, 20582077, 20610258
Corrective Action
Documents
2477210
Engineering
Changes
2866
Repair Broken 3LPSPX0009 Pressure Connection with
Alternate Piping Configuration
001
Work Orders
20610262, 20610255
Calculations
ONTC-3-MS-008
Unit 3 Relief Valve Test Acceptance Criteria
Corrective Action
Documents
2466315, 2475870, 2476203, 2476262
O-6700
One-Line Diagram Main PSW Switchgear 13.8/4.16 kV
System
Drawings
OFD-135B-1.4
Flow Diagram of Lube Oil System SSF Diesel Engines
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
IP/0/A/2001/015
PSW 13.8/4.16 kV Square D Type VR Vacuum Circuit
Breaker Inspection and Maintenance
005
IP/0/A/2001/016
PSW 13.8/4.16 kV Vacuum Circuit Breaker Removal and
Installation
OP/0/A/1650/005
PSW AC Power
20
PT/0/A/0620/009
Keowee Hydro Operation
056
PT/0/A/0620/019
Keowee Over Frequency Protection Functional Test
015
Procedures
PT/1/A/0204/007
Reactor Building Spray Pump Test
106
Work Orders
20595783, 20610258
Corrective Action
Documents
AR 02342810, AR 02377923, AR 02412872, AR 02434482,
AR 02442786, and AR 02464568,
Various
Corrective Action
Documents
Resulting from
Inspection
Radiological Posting Sign found on the floor
06/13/2023
Memorandum: 2023 Oconee Annual Land Use Census
06/14/2023
Memorandum: 2020 Oconee Annual Land Use Census
06/04/2020
Memorandum: 2021 Oconee Annual Land Use Census
06/17/2021
Memorandum: 2022 Oconee Annual Land Use Census
06/07/2022
Out of Service (OOS) effluent monitor reports and control
room logs from June 2020 thru May 2023
Various
20 Oconee Nuclear Station Units 1, 2, and 3 Annual
Radioactive Effluent Release Report
04/30/2021
21 Oconee Nuclear Station Units 1, 2, and 3 Annual
Radioactive Effluent Release Report
04/30/2022
22 Oconee Nuclear Station Units 1, 2, and 3 Annual
Radioactive Effluent Release Report
04/30/2023
Performance Test
Penetration Room Ventilation System Functional Test per
PT/3/A/0170/019, Revision 2
11/03/2022
PT/1-
2/A/0150/025
LWD System Leakage
10/17/2022
Miscellaneous
PT/3/A/0150/026
GWD [Gas Waste Decay] System Leakage Test
07/06/2022
Procedures
Oconee Nuclear Station Selected Licensee Commitments
(SLC), Section 16.11, Radiological Effluents Control
10/26/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Oconee Nuclear Station Units 1, 2, and 3 Offsite Dose
Calculation Manual (ODCM)
Oconee Nuclear Station Units 1, 2, and 3 Offsite Dose
Calculation Manual (ODCM)
AD-CP-ALL-0023
Preparation of the Annual Radioactive Effluent Release
Report
HP/0/B/1000/060
D
Vent and Air Ejector Sampling
OP/0/A/1104/068
Waste/Recycle Monitor Tank Release from Radwaste
Facility
OP/0/A/1104/076
Manual Calculations for Liquid Effluent Releases
Qualification
Number: ON-RP-
041
Perform Gaseous Waste Release Rate Determinations
TQ-RWO-0011
Training and Qualification Guide No. ON-OPS-RWO0011,
Liquid Waste Release to Keowee Tailrace
22-ONS-
RPCH-01
Nuclear Oversight Audit - Oconee Radiation Protection and
Chemistry
10/20/2022
Self-Assessments
Radioactive Effluents 10CFR20 Compliance Assessment
06/02/2021
Penetration Room Ventilation System Functional Test per
PT/3/A/0170/019, Revision 2
06/11/2022
Unit 2 Reactor Building Stack Flow Instrument Calibration
01/23/2023
Work Orders
Unit 2 Reactor Building Stack Flow Instrument Calibration
01/20/2022
Corrective Action
Documents
06/02/2020
Pump Found Unplugged for REMP SW Location 062
06/12/2023
Corrective Action
Documents
Resulting from
Inspection
NRC Inspection Question on MET Tower Inspections for
Guyed Wires / 10L rule
Miscellaneous
Tower Systems South, Inc. MET Tower Inspection Reports,
10M and 60M
06/08/2020
Procedures
AD-CP-ALL-0017
Radiological Groundwater Protection
20522453 01
Meteorological Equipment Calibration (Semi-Annual)
09/20/2022
Work Orders
20556051 01
Meteorological Equipment Calibration (Semi-Annual)
03/30/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
AR 02432377, and AR 02436130
Various
Oconee Liquid and Gas Dose Summary Report, January 1
through 5/13/2023 [including monthly, quarterly, and annual
dose totals]
06/14/2023
MSPI Derivation Report Oconee Unit 3 Cooling Water
System Unreliability Index, March 2023
MSPI Margin Report Oconee Units 1, 2 and 3 Cooling Water
and Heat Removal Systems, March 2023
MSPI Derivation Report Oconee Unit 2 Heat Removal
System Unreliability Index, March 2023
Miscellaneous
22 Oconee Liquid and Gas Dose Summary Report
[including monthly, quarterly, and annual dose and individual
isotopic activity totals]
05/16/2023
AD-RP-ALL-1101
Performance Indicators (PI) for the Occupational Radiation
Safety Cornerstone and for the Public Radiation Safety
Cornerstones
PT/1/A/0600/010
Reactor Coolant Leakage
2
PT/2/A/0600/010
Reactor Coolant Leakage
71151
Procedures
PT/3/A/0600/010
Reactor Coolant Leakage
Corrective Action
Documents
2456972, 2415853, 2357711, 2443366, 2450253, 2423411,
2436929, 2425299, 2444507, 2467763, 2468647, 2470090,
2468145, 2474146, 2474149
AD-PI-ALL-0100
Corrective Action Program
AD-PI-ALL-0106
Cause Investigation Checklists
Miscellaneous
AD-PI-ALL-0200
Performance Trending
Miscellaneous
AD-OP-ALL-1000
Conduct of Operations
AP/3/A/1700/053
Abnormal Feedwater Heater Operations
000
Procedures
OP/3/A/1104/017
Quench Tank Operation
53