IR 05000269/2022404

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404
ML22115A226
Person / Time
Site: Oconee  
Issue date: 04/27/2022
From: Jannette Worosilo
Division of Reactor Safety II
To: Snider S
Duke Energy Carolinas
References
IR 2022404
Download: ML22115A226 (9)


Text

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 1, 2, & 3 - SECURITY BASELINE INSPECTION REPORT 05000269/2022404 AND 05000270/2022404 AND 05000287/2022404

Dear Mr. Snider:

On April 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Oconee Nuclear Station, Units 1, 2, & 3, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000269 and 05000270 and 05000287 License Nos. DPR-38 and DPR-47 and DPR-55

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000269, 05000270 and 05000287

License Numbers:

DPR-38, DPR-47 and DPR-55

Report Numbers:

05000269/2022404, 05000270/2022404 and 05000287/2022404

Enterprise Identifier:

I-2022-404-0005

Licensee:

Duke Energy Carolinas, LLC

Facility:

Oconee Nuclear Station, Units 1, 2, & 3

Location:

Seneca, S.C.

Inspection Dates:

April 11-April 14, 2022

Inspectors:

R. Patterson, Physical Security Inspector

A. Richardson, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Oconee Nuclear Station, Units 1, 2,

& 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection, unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met, consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: (02.06 a-b, 02.08 a-f)

Tier III: (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated [date].

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All Requirements

Tier II: (02.11(a), 02.11(b), 02.12(a), 02.13(a))

Tier III: (02.14, 02.15)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All Requirements

Tier II: (02.05 b, c, 02.06 a, b, 02.07 a, 02.09 b)

Tier III: (02.10, 02.11 a, 02.12 a, 02.13 a, b)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1)

Review Security Plan Changes (IP Section 02.01) (1 Sample)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) January 1, 2021-February 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 14, 2022, the inspectors presented the security baseline inspection results to Steven M. Snider and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2386259

KHS Access Control Measures

06/15/2021

AD-SY-ALL-0215

Security Search And Entry Processing

Revision 7

AD-SY-ALL-0215

Security Search and Entry Process

Revision 7

AD-SY-ALL-0240

Security Key and Lock Controls

Revision 2

AD-SY-ONS-0201

Security Operations

Revision

R002

CSD-SY-ONS-

215-01

ONS Search and Entry Processing

Revison 002

71130.02

Procedures

PO-SY-ONS-

23

Keowee Hydro Station Security

Revision

R000 and

R001

2322990

Multiple Perimeter Cameras Out of Service

3/30/2020

2323291

CCTV Cameras not showing in the CAS

4/1/2020

Corrective Action

Documents

2419609

Camera Inoperational

3/11/2022

AD-SY-ALL-0610

Nuclear Security Equipment Maintenance Program

Revision 0

AD-SY-ALL-0620

Testing and Inspection of Perimeter Intrusion Detection

Systems (PIDS)

Revision 0

AD-SY-ALL-0630

Testing and Maintenance of Security Communications

Equipment

Revision 2

AD-SY-ALL-0640

Testing and Inspection of Security Search Equipment

Revision 1

AD-SY-ONS-0600

Security Operational Testing and Inspection

Revision 3

71130.04

Procedures

AD-SY-ONS-0600

Security Operational Testing And Inspection

Revision 3

20-02349288

Corrective Action

Documents

21-02386438

ONS 2021 Annual Security Exam

Version 1

Miscellaneous

ONS 2021 Annual Security Exam

Version 2

AD-SY-ALL-0510

Security Program Systematic Approach to Training

Revision 5

AD-SY-ALL-0520

Security Training

Revision 6

71130.07

Procedures

AD-SY-ALL-0524

Security On-The-Job Training (OJT) and Task Performance

Evaluation (TPE)

Revision 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LP-SY-ALL-0516

Use of Force

Revision 5

LP-SY-ONS-0508

Security Patrols

Revision 2

TG-SY-ALL-0500

Conduct of Fleet Courses of Fire and Physical Fitness Test

Revision 10

TG-SY-ONS-0530

On-The-Job Training, Task Performance Evaluation (TPE)

Guide

Revision 0

21-ONS-SEC-

Nuclear Oversight-Audit Oconee Physical Security

2/04/2021

22-ONS-SEC-

PR-01

Nuclear Oversight Performance Review Oconee Physical

Security

2/03/2022

Self-Assessments

AR-02402092

NRC Baseline readiness Assessment

2/25/2022

71130.09

Procedures

AD-SY-ALL-0101

Security Plan Revision Process

Revision 3