APPENDIX A NOTICE OF VIOLATION Duke Power Company Docket No. 50-269 Oconee 1 License No. DPR-38 As a result of the inspection conducted on March 10 - April 10,1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (liarch 9,1982), the following violations were identified.

A. Technical Specification 3.8.12.b requires two trains of spent fuel pool ventilation to be operable during all operations involving the movement of fuel within the spent fuel pool.

Contrary to the above, both trains of spent fuel pool ventilation were inoperable between flarch 23, 1982 and March 30, 1982 during the movement of ten fuel assemblies within the Unit 3 spent fuel pool and on April 2,1982 during the movement of one fuel assembly within the Unit 1 and 2 spent fuel pool.

This is a Severity Level IV Violation (Supplement I.D.2.).

B. 10 CFR 50.59(b) requires that a summary of the safety evaluation of each change to the facility made pursuant to this section be submitted to the NRC at least annually.

Contrary to the above, facility change safety evaluation summaries were not submitted annually to the NRC in that the 1980 report of Oconee facility changes, s1bmitted to the NRC on November 20, 1981, did not contain a summary of the safety evaluations for the listed modifications.

This is a Severity Level V Violation (Supplement I.E.).

Pursuant to the previsions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.

Date: MAY 0 31982 8207010440 820621 PDR ADOCK 05000269 G PDR