IR 05000295/1989013

From kanterella
Revision as of 21:35, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-295/89-13 & 50-304/89-13 on 890318-0508.No Violations Noted.Rept Highlights Number of Shortcomings Identified in Maint Area,Including Work Package Preparation & Documentation of Work Activities
ML20247P087
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/30/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20247P091 List:
References
NUDOCS 8906060101
Download: ML20247P087 (2)


Text

. - _ _ _ _ __ _ _ _ _ _ -_ - - _ - _ _ _ - _ _ _ ._

. _ _ _ _ ____ - _ -_

'

j hCN

'py ;'*-

-

,

y, MAY.3 81989-Docket No. 50-295 Docket'No. 50-304 Connonwealth Edison Compan ATTN: Mr. Cordell Reed Senior Vice Presiden Post Office Box 767 Chicago, IL 60690

. Gentlemen:

~

This. refers to the routine safety inspection conducted by.NRC inspectors

.

Messrs. M. M. Holzmer, R. J. Leemon, R. L. Lerch, J. D. Smith and .

-Ms. P. L'. Eng, of this office on March 18 through May 8, 1989, of activities at the. Zion Nuclear Generating Station, authorized.by License Nos._DPR-39

<and DPR-48, and to the discussion of our findings with Mr. T. Joyce at the conclusion'of the inspectio LThe enclosed copy of'our inspection report identifies areas examined during

'the inspection. Within these areas, the_ inspection consisted of a selective examination of procedures and representative records, observations, and interviews with~ personne No. violations of NRC requirements were identified during the course of this inspectio This report highlights;a number of shortcomings identified in the maintenance area, including work package preparation, documentation of work activities, and repetitive. equipment failures. In addition, there also appears to be an increase in the' number of forced outages in 1989 caused by equipment failure Your corporate Code of Conduct of Maintenance (CCOM) appears to address these-and other related areas, but current estimates for implementation of CCOM-

~

indicate that full implementation is about 2 years away. Please respond to-the findings in the maintenance section.of this inspection report and include in your response the.long and short term sctions which will improve work

. package preparation and documentation, and preventive maintenance and-describe any other plans to reduce repetitive equipment failures and forced outage In accordance~with 10 CFR 2.790 of the Commission's regulations, a copy of-this letter, the enclosed inspection report, and your response to this letter will: be placed in the NRC- Public Document Roo % NO l

l: 8906060101 890530 PDR ADOCK 05000295 Q PDC a = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -- __ _ _ _ _ _ - - - _ _

_

p ,..

.

[ .

l..n

-

'

Commonwealth Edison Company 2 gy 3 , gg We will gladly discuss any questions you have concerning this inspectio

Sincerely, Original signed by E. G. Groenman Edward G. Greenman, Director, 1

'

Division of Reactor Projects Enclosure: Inspection Reports No. 50-295/89013(DRP);

No. 50-304/89013(DRP)

cc.w/ enclosure:  !

.T. J. Maiman, Vice President, PWR Operations T. Kovach, Nuclear

"

Licensing Manager T.. Joyce, Station Manager Chandu Patel, Project Manager, NRR DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Mayor, City of Zion i

l

,

l i

RIII EIII R .

,

&

'

C[ ()RIII Dil 6f?I?R Calhoun/jp H McKenpa Gre '

t$n <

9 7 S/WF i

_ _ _ _ - _ _ _ _ _ _ _ _ _ - . _ b