IR 05000295/2006001

From kanterella
Jump to navigation Jump to search
IR 05000295-06-001, on 05/02/06, Zion, Unit 1, Licensee'S Management and Control, Spent Fuel Safety, and Radiological Safety
ML061250155
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/03/2006
From: Jamnes Cameron
Decommissioning Branch I
To: Crane C
Exelon Generation Co
References
FOIA/PA-2010-0209 IR-06-001
Download: ML061250155 (10)


Text

SUBJECT:

NRC INSPECTION REPORT 050-00295/06-001(DNMS)

ZION NUCLEAR STATION

Dear Mr. Crane:

On May 2, 2006, the NRC completed an inspection at the Zion Nuclear Station. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on April 3 through 5, 2006, the inspectors evaluated organization and management controls, safety reviews, self-assessments, spent fuel safety, maintenance and surveillance, and radiological waste. At the conclusion of the on-site inspection on April 5, 2006, the NRC inspectors discussed the findings with members of your staff. In addition, on April 19, 2006, the inspectors collected six independent water samples for tritium analysis. Four samples were collected at the Zion Stations Radiological Environmental Monitoring Program water collection locations, one was from an on-site potable drinking water source, and one was from Lake Michigan. On May 2 the inspectors completed an in-office review of laboratory analysis results of the water samples. The inspectors conducted a telephone exit interview with members of your staff on May 2, 2006, to discuss the results of the in-office review of the laboratory results.

The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel Based on the results of this inspection, the NRC did not identify any violations.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA by William Snell Acting for/

Jamnes L. Cameron, Chief Decommissioning Branch Division of Nuclear Materials Safety Docket No. 05000295 License No. DPR-39

Enclosure:

Inspection Report 050-00295/06-001(DNMS)

w/Attachment: Supplemental Information

REGION III==

Docket No. 050-00295 License No. DPR-39 Report No. 050-00295/06-001(DNMS)

Licensee: Exelon Generation Company, LLC Facility: Zion Nuclear Station Location: 101 Shiloh Boulevard Zion, IL 60099 Date: April 3 through 5, 2006, April 19, 2006, and May 2, 2006 NRC Inspectors: Peter J. Lee, Ph.D., CHP, Health Physicist Eugenio A. Bonano, Health Physicist William G. Snell, Senior Health Physicist Approved by: Jamnes L. Cameron, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure

EXECUTIVE SUMMARY Zion Nuclear Station NRC Inspection Report 050-00295/06-001(DNMS)

This routine decommissioning inspection focused on the evaluation of the licensees facility management and control, spent fuel safety, and radiological safety.

Facility Management and Control

! The inspector determined that the licensees staffing was adequate for the level of work being performed at the site and met the requirements established in the licensees procedures. (Section 1.1)

! The inspector concluded that the licensee adequately maintained the material condition of its facilities and equipment. (Section 1.2)

! The inspector determined that the licensees process for evaluating the safety impacts of facility changes was in compliance with the requirements of 10 CFR 50.59.

(Section 1.3)

! The inspector concluded that the licensee adequately implemented its audit and corrective action programs in accordance with the licensees Quality Assurance Program, and that the programs were consistent with NRC requirements. (Section 1.4)

Spent Fuel Safety

! The inspector concluded that the licensee adequately maintained structures, systems, equipment, and components necessary for safe storage of spent fuel. (Section 2.1)

Radiological Safety

! The inspector concluded that the licensee effectively monitored and controlled personnel exposures to radiation. (Section 3.1)

! The inspector determined that the licensee effectively implemented radiological effluent control programs and processes. (Section 3.2)

! No concerns were identified regarding the levels of radioactivity in six drinking water samples collected. (Section 3.3)

Report Details 1.0 Facility Management and Control 1.1 Organization, Management, and Cost Controls (IP 36801)

a. Inspection Scope The inspector evaluated the licensees staffing to determine whether adequate staffing levels were being maintained to effectively conduct decommissioning activities.

b. Observations and Findings The licensee made two staffing changes since the last NRC inspection. The staff changes involved filling two positions, which were the Decommissioning Plant Manager and Radiation and Chemistry Supervisor. These positions were described in licensee procedure ZAP 200-01, Zion Decommissioning Organization, Revision 9.

c. Conclusions The inspector determined that the licensees staffing was adequate for the level of work being performed at the site and met the requirements established in the licensees procedures.

1.2 Decommissioning Performance and Status Review (71801)

a. Inspection Scope The inspector conducted a plant tour to assess field conditions, and to evaluate the material condition of structures, systems, and components important for the safe storage of spent fuel.

b. Observations and Findings During the plant tour, the inspector did not identify any adverse conditions, which could effect plant equipment or personnel safety. The inspectors did not identify any transient materials that would impact the function of structures, systems, and components important for the safe storage of spent fuel or hinder plant personnel access to important equipment.

c. Conclusions The inspector concluded that the licensee adequately maintained the material condition of its facilities and equipment.

1.3 Safety Reviews, Design Changes, and Modifications (IP 37801)

a. Inspection Scope The inspector reviewed and evaluated licensees safety screening reviews to verify that the reviews were consistent with the requirements of 10 CFR 50.59. The inspector evaluated safety screening reviews, completed since the NRCs last inspection.

b. Observations and Findings The licensees Administrative Procedure ZAP-100-06 was consistent with the NRCs guidance on 10 CFR 50.59 screening reviews. The licensee conducted several safety screening reviews of facility changes and that none of the changes required a formal 10 CFR 50.59 safety evaluation.

c. Conclusions The inspector determined that the licensees process for evaluating the safety impacts of facility changes was in compliance with the requirements of 10 CFR 50.59.

1.4 Self-Assessment, Auditing, and Corrective Actions (IP 40801)

a. Inspection Scope The inspector reviewed the licensees annual audit (NOSA-ZIN-04-14), which was conducted from December 5 through December 13, 2005. The inspector reviewed selected corrective action work orders, which were associated with deficiencies identified during the annual audit.

b. Observations and Findings The licensees annual audit included the evaluation of activities affecting plant systems, structures and components necessary for the safe storage of spent fuel.

The annual audit was consistent with license requirements in both scope and level of detail, and that the licensee initiated appropriate corrective actions to resolve audit findings.

c. Conclusions The inspector concluded that the licensee adequately implemented its audit and corrective action programs in accordance with the licensees Quality Assurance Program, and that the programs were consistent with NRC requirements

2.0 Spent Fuel Safety 2.1 Spent Fuel Pool Safety (IP 60801)

a. Inspection Scope The inspector verified the safe wet storage of spent fuel in the fuel building. The review included spent fuel pool (SFP) instrumentation, alarms, cleanliness control, chemistry of the SFP, and criticality controls, and the results of the January through March 2006 spent fuel pool water temperatures, levels, and chemistry and gamma spectrum analyses.

b. Observations and Findings A review of the January through March 2006 spent fuel pool water temperatures, levels, and chemistry and gamma spectrum analyses results indicated that all parameters were within procedural limits. The licensee maintained the boron concentration in the spent fuel pool at approximately 2,000 parts per million (ppm)

versus the Technical Specifications limit, which requires a concentration equal to or greater than 500 ppm.

The licensee performed monthly functional tests for high radiation levels in the spent fuel pool area. The tests were performed to verify proper pager function in response to control room alarms, which alert operators to potential spent fuel pool conditions effecting safety. The licensee implemented the pager system to relieve the need for operators continuously manning the control room.

c. Conclusions The inspector concluded that the licensee adequately maintained structures, systems, equipment, and components necessary for safe storage of spent fuel.

3.0 Radiological Safety 3.1 Occupational Radiation Exposure a. Inspection Scope (83750)

The inspector reviewed the licensees personnel external dosimetry monitoring records for the second half of calendar year 2005. The inspector reviewed the licensees first quarter 2005 general air sampling results, direct radiation survey and smear sample results for the Fuel Building and the Auxiliary Building. The inspector also reviewed the air sampling results, direct radiation survey, and smear sample results for the Unit 2 cavity area, which were collected as a result of a special nuclear material inventory involving the Gamma-Metrics detectors.

b. Observations and Findings The highest external radiation exposure measured for a plant worker during the second half of calendar year 2005 was 80 millirem total effective dose equivalent. The results of general area air sampling conducted by the licensee during the first quarter

of 2006 in the Fuel and Auxiliary Buildings, were consistent with ambient background levels. The results of the licensees routine quarterly radiation surveys performed in the Fuel Building and the Auxiliary Building did not identify any significant removable contamination.

The results of air sampling conducted by the licensee did not indicate any potential intake of radioactive materials by plant workers performing a special nuclear material inventory. The workers conducted the inventory on the Gamma Metrics detectors located in the Unit 2 cavity. The results of contamination surveys did not indicate any spread of contamination, and that the direct radiation surveys did not indicate any significant potential for exposure to the workers greater than license or NRC regulatory limits.

c. Conclusions The inspector concluded that the licensee effectively monitored and controlled personnel exposures to radiation.

3.2 Radioactive Waste Treatment, and Effluent and Environmental Monitoring (IP 84750)

a. Inspection Scope The inspector reviewed and evaluated the plant effluent release data for the year 2005. The inspector also evaluated the projected offsite dose.

b. Observations and Findings The licensee participated in a cross check program, which involved the use of an off-site laboratory to ensure the quality of the analytical data. The results of the cross checked completed in calendar year 2005 indicated agreement in all analytical data.

The licensee did not have any liquid effluent releases during calendar year 2005. The licensees gaseous effluent release data demonstrated that the concentrations of released effluent conformed to 10 CFR Part 20, Appendix B, Table 2, and that the associated doses to the general public were in conformance with Appendix I of 10 CFR Part 50.

c. Conclusions The inspector determined that the licensee effectively implemented radiological effluent control programs and processes.

3.3 Independent Collection of Water Samples for Tritium Analysis (IP 84750)

a. Inspection Scope The inspector collected six independent water samples for the analysis of tritium. Four of the samples were collected at the licensees Radiological Environmental Monitoring Program water collection locations, the Kenosha Water Works, the Lake County Water Works, the Waukegan Water Works, and the Lake Forest Water Works. A fifth

sample was collected from a potable onsite drinking water source and the last from Lake Michigan adjacent to the Zion Station.

b. Observations and Findings By letter dated May 1, 2006 (ML061220340), NRC received the results of the analysis of six water samples from the NRCs contract laboratory, the Oak Ridge Institute for Science and Education (ORISE). The six samples were all below the minimum detectable concentration level of 190 picocuries per liter (pCi/L) for tritium. This is well below the Environmental Protection Agencys allowable drinking water level for tritium of 20,000 pCi/L. One sample was also analyzed for gamma emitting nuclides. No radioactivity was identified in the sample in excess of the minimum detectable concentrations for cobalt-58, cobalt-60, cesium-134 or cesium-137.

c. Conclusions No concerns were identified regarding the levels of radioactivity in the drinking water samples collected.

4.0 Exit Meeting The inspector presented the on-site inspection results to licensee management at the conclusion of the inspection on April 5, 2006. The results of the analysis of the water samples collected on April 19, 2006, were presented to licensee management on May 2, 2006. The licensee acknowledged the findings presented and did not identify any of the documents or processes reviewed by the inspector as proprietary.

ATTACHMENT: SUPPLEMENTAL INFORMATION 7 Enclosure

SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED R. Schuster, Plant Manager J. Ashley, Design Engineering R Adams, Operations and Engineering Manager L. Cunningham, Security Project Manager M. Petersen, Administration/Training Supervisor INSPECTION PROCEDURES (IP) USED IP 36801 Management, Organization, and Cost Control IP 70801 Decommissioning Performance and Status Review IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Actions IP 60801 Spent Fuel Pool Safety IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring ITEMS OPENED, CLOSED, AND DISCUSSED Opened None Closed None Discussed None LIST OF ACRONYMS USED CFR Code of Federal Regulations DNMS Division of Nuclear Materials Safety IEMA Illinois Emergency Management Agency NGET Nuclear General Employee Training NRC Nuclear Regulatory Commission ORISE Oak Ridge Institute for Science and Education pCi/L picocuries per liter ppm parts per million SFP Spent Fuel Pool LICENSEE DOCUMENTS REVIEWED Licensee documents reviewed and utilized during the course of this inspection are specifically identified in the Report Details above.

Attachment