Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes
ML20211G819
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/26/1999
From: Krich R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211G825 List:
References
NUDOCS 9909010034
Download: ML20211G819 (9)


Text

r Commonwealth Edison Company

1400 Opus Place l Downers Grove, IL N1515-5701 August 26,1999 U.S. Nuclear Regulatory Commission ATTN
Document Control Desk Washington, DC 20555 l Zion Nuclear Power Station, Units 1 and 2 L Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304 f

Subject:

Submittal of Zion Nuclear Power Station Fire Protection Report Amendment 6

References:

(1) Commonwealth Edison (Comed) Company letter,

" Certification of Permanent Cessation of Operations,"

dated February 13,1998 (2) Comed letter, " Certification of Permanent Fuel Removal,"

dated March 9,1998 (3) Comed letter, " Amendment 5 to Zion Fire Protection Report,"

dated November 18,1997 In accordance with the requirements of 10 CFR 50.71(e), we are submitting Amendment 6 to the Fire Protection Report (FPR) for the Zion Nuclear Power Station (ZNPS), Units 1 and 2. In References 1 and 2, we submitted the certifications for ZNPS required by 10 CFR 50.82(a)(1). Therefore, in ,

accordance with 10 CFR 50.71(e)(4), this FPR amendment is being submitted

~

within 24 months of the previous ZNPS FPR amendment which was submitted in Reference 3. Accordingly, this amendment is due to be submitted by November 18,1999.

Attachment 2, " Zion Nuclear Power Station Fire Protection Report Amendment 6," contains Amendment 6 to the ZNPS FPR. As required by 10 CFR 50.71(e), i Amendment 6 consists of replacement pages for the FPR and is accompanied j P

F k sooo29s PDR A

ph

\\\

A Unicom Company L I

r ,

August 26,1999 U.S. Nuclear Regulatory Commission Page 2 by a list of effective pages for the FPR following page replacement. Amendment 6 completely replaces the ZNPS FPR as amended through Amendment 5.  ;

Amendment 6 to the ZNPS FPR presents changes made under the provisions of '

10 CFR 50.59 and 10 CFR 50.48(f), but not previously submitted to the NRC.  !

The changes were made to reflect the permanently defueled condition of ZNPS '

and the amendment includes changes made through July 30,1999. The FPR changes are summarized in Attachment 1, " Summary of Changes." Attachment 1 is provided in lieu of revision bars to indicate changes from the previous version of the FPR due to the extensive revision and reformatting of the FPR.

We have evaluated the FPR changes in accordance with 10 CFR 50.59 and 10 CFR 50.48(f). We concluded the changes do not involve an unreviewed safety question and do not reduce the effectiveness of fire protection for facilities, i systems, and equipment which could result in a radiclogical hazard, taking into I account the current ZNPS decommissioning plant conditions and activities.

As Vice President - Regulatory Services, I certify that the information in this submittal accurately presents changes made since the previous submittal l necessary to reflect information and analyses submitted to the NRC or prepared '

pursuant to NRC requirements, and changes made under the provisions of 10 CFR 50.59 and 10 CFR 50.48(f) but not previously submitted to the NRC.

Pursuant to 10 CFR 50.4(b)(6), one signed original and ten copies of this amendment to the ZNPS FPR are being provided to the NRC Document Control Desk, and one copy to the NRC Region lli office.

if you have any questions about this letter, please contact Mr. P. R. Simpson at (630) 663-7971.

Respectfully, R. M. Kri Vice President - Regulatory Services Attachments cc: Regional Administrator- NRC Region lli I

I

I l

bec: NRC Project Manager, NRR - Zion Nuclear Power Station (w/o Attachment 2) i Decommissioning Branch Chief - NRC Region lli (w/o Attachment 2)

Office of Nuclear Facility Safety - lDNS Senior Reactor Analyst -IDNS (w/o Attachment 2)

Manager of Energy Practice - Winston and Strawn (w/o Attachment 2)

Vice President - Regulatory Services (w/o Attachment 2)

Director, Licensing - Zion /Dresden Unit 1 Decommissioning (w/o Attachment 2)

Nuclear Oversight Manager - Zion Nuclear Power Station (w/o Attachment 2)

Comed Document Control Desk - Licensing (Hard Copy)

Comed Document Control Desk - Licensing (Electronic Copy) (w/o Attachment 2) l I

I l

I i

l l

l

i l

l Attachment 1 l l

I Summary of Changes  ;

i

)

ZION STATION FIRE PROTECTION REPORT AMENDMENT 6 Summary of Changes a,

, 3-, pg .

m . ., , >~ w

}pgg g, >

- 4

. o >

wn. . ,

.g egg

gy 4 L 49
  • ChangeDescriptkm p- }l .j rFIO.uft? f , <+ , i S 'g. W u

< F - Y>

VOLUME 1 TOC, i to ix, List of Deleted. The Volume 1 TOC and acronym list has been Acronyms pages 1 deleted because most of Volume 1 has been deleted to 3 (with exception of the Figures in Section 2.0).

Vol.1, Section 1-1 to 1-10 Deleted introduction section and references.

1.0 Table 1-1 1-11 to 1-15 Deleted Table of Appendix R requirements Table 1-2 1-16 to 1-20 Deleted Table of Appendix R commitments.

Table 1-3 1-21 to 1-22a Deleted Table of Appendix R historical developments.

Table 1-4 1-23 Deleted Table of Appendix R exemptions list summary.

Table 1-5 1-24 to 1-27 Deleted Table of Appendix R modifications summary.

Section 2.0 2-1 to 2-6 Deleted Appendix R related material. This material also existed in Volume 2 and was deleted.

Tables 2-1,2-2 2-7 to 2-30 Deleted fire zone identification Table. Deleted Table of existing fire protection features for interior fire areas.

Figures 2-1 to 2- N/A Deleted all Figures.

22 Vol.1 Section 3-1 to 3-27 Deleted methodology and selection of safe shutdown 3.0 functions, systems and components.

Table 3-1 3-28 to 3-29 Deleted Table of safe shutdown instruments.

Table 3-2.1 3-30 to 3-51 Deleted Table of hot shutdown components Table 3-2.2 3-52 to 3-54 Deleted Table of cold shutdown components.

Figures 3-1 to N/A Deleted Figures showing safe shutdown components 3-31.8 an systems msus mWes.

Vol.1, Section 4-1 to 4-11 Deleted safe shutdown component analysis.

4.0

l l

ZION STATION FIRE PROTECTION REPORT l AMENDMENT 6 Summary of Changes

[h :q l lll , ,

1

- Figure; M @- yt m

1 C 3% 3 4 Table 4-1 4-12 to 4-15 Deleted Table of potential spurious malfunctions that could effect safe shutdown. j Figure 4-1 N/A Deleted Figure for safe shutdown circuit analysis.

I Vol.1, Section 5-1 to 5-33 Deleted Section on Appendix R conformance measures.

5.0 l

Table 5-1 5-34 to 5-41 Deleted Table of conformance measures summary. l l

Figures 5-1.1 to N/A Deleted Figures showing Appendix R equipment and l

5-9 compliance. '

Vol.1, Section 6- 6-1 to 6-17 Deleted Section on safe shutdown scenarios and I O. timetables.

Table 6-1 6-18 to 6-22 Deleted Table on system activities for safe shutdown.

Figure 6-7 N/A Deleted Figure for 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> timeline for safe shutdown.

Vol.1. Section 7- 7-1 to 7-49 Deleted Section on Appendix R exemption requests and 0 analyses.

Figures 7.2-1 to N/A Deleted Figures supporting Appendix R.

7.7-1 VOLUME 2 TOC pages i to viii Restructured for new report.

Vol. 2, Section 1-1 to 1-9 Revised introduction, design philosophy, features, 1.0 design basis, and criteria.

Vol. 2, Section 1-10 to 1-19 Revised Section on Appendix R conformance and  !

1.0 background.

Table 1.1 1-20 Moved Table into new report.

Figure 1-1 1-3,2-3, and 3-3 Moved into new report. i l

l

ZION STATION FIRE PROTECTION REPORT AMENDMENT 6 Summary of Changes

{

,  : l ;N ,

7 pgggj v , ;4:7 y " >

, 3:g g. ,y ,~+

Vol. 2, Section 2-1 and 2-2 Revised assumptions and methodology to remove .

2.0 Appendix R related assumptions. Removed Appendix R statements at the end of Step a, end of Step d; completely deleted Step e about fire spread effecting redundant Appendix R trains, and deleted step G concerning effect of external fire on safe shutdown equipment.

Vol. 2, Section 2-3 to 2-11 Revised fire area and fire severity identification and 2.1 definitions to remove Appendix R statements and add definitions related to radiological hazards. Fire zone descriptions and identification moved to new report as is.

Vol. 2, Section 2-12 to 2-13 Revised acronym list to take out Appendix R related 2.2 acronyms.

Table 2-1 and 2-2 2-14 to 2-29 Updated fire zones in the combustible loading summary and fire protection features summary Tables Vol. 2, Section 3-1 to 3-407 Updated the fire zones. Also, revised all fire zones to 3.0 delete safe shutdown equipment and statements concerning Appendix R. Revised all fire zones to change Appendix R and BTP 9.5 Appendix A fire barriers to simply " fire barriers." Revised all fire zones to add section on radiological hazard potential and section on equipment important to the defueled condition.

Revised design basis fire in those sections where the '

design basis was strictly for Appendix R purposes.

Added sections in design basis for maintaining spent fuel pool cooling.

Vol. 2, Section all pages Deleted guidelines.

4.0

p i.

h ZION STATION FIRE PROTECTION REPORT AMENDMENT 6 Summary of Changes 49o

+ .w , m

o. , , 4

.. R; %:;?w .s.

- :Page NumbeW? /

4 f'N

'^ .

nu

~

ps , e

,'- ;m , m" . ..s

,!.; Tab. .l.e.f. \.g , 1pgeogon'# ih$ ' g Change. w.

. N

~

'4, a v

' j; t'$h,..f h i

5 f s , . , .

.-f,.,

.(. ( [ ,

4

f. '.

j..g,'.,s. .

VOLUME 3 5-1 to 5-60 Deleted NFPA ccdc deviations.

Safety Evaluation N/A Deleted from the FPR.

Reports 1

I 1

J

Attachment 2 I

Zion Nuclear Power Station Fire Protection Report 1 Amendment 6 l

1