Forwards Safeguards Insp Repts 50-295/90-19 & 50-304/90-21 on 900813-1003.No Violations Noted
ML20062C724
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/22/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20062C726 List:
References
NUDOCS 9011020086
Download: ML20062C724 (2)


See also: IR 05000295/1990019

Text

. .

oa

.

'

SAEG1 ADS

FONATON

.

.

,,

.

OCT 2 21990

l

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Opus West III

1400 Opus Place

Downers Grove, IL 60515

Gentlemen:

This refers to the routine safeguards inspection conducted by

Ms. C. M. Christoffer and Mr. J. L. Belanger of this office on August 13 -

,

October 3,1990, of activities at Zion Nuclear Power Station, Units 1 and 2,

authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48, and to the

discussion of our findings with Mr. T. Joyce at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

i

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel,

i

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during this inspe', tion concern a subject matter which is exempt

from disclosure according to Phet 73, Title 10 Code of Federal Regulations,

Section73.21(c)(2). This information must be handled and protected in

i

1

accordance with the provisions of 10 CFR 73.21.

Consequently, our report

of this inspection will not be placed in the NRC Public Document Room.

However, in accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of the attachment to the inspection report will be placed in the

'

NRC Public Document Room.

!

!

SA?EGUAns WF05AW

i

.-

M%ssume

(

REP

)

- -

.

SAEGUADS

FORY AT 0;N

.

-

-

,

Commonwealth Edison Company

2 OCT 2 21990

We will gladly discuss any questions you have concerning this inspection.

Sincerely.

.

L. Robert Greger, Chief

Reactor Programs Branch

Enclosure:

Inspection Report

No. 50-295/90019(DRSS\\

'

No.50-304/90021(DRSSj;

(SAFEGUARDS INFORMATION)

,

cc w/ enclosure:

M. Wallace, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager

T. Joyce, Station Manager

NRR/DRIS/SGB

NRR/0RIS/SID

NRR/DLPQ/PEB

cc w/ enclosure, w/o

SAFEGUARDS INFORMATION:

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors, Byron,

Braidwood, Zion

Richard Hubbard

J. W. McCaffrey, Chief. Public

Utilities Division

Mayor, City of Zion

Chandu Patel, Project

Manager, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center

bec:

D. Funk

Enclosure Contains

SAFEGUARDS IhTORMATION

Upon Separation Thia

,

Pace Is Decentrolled

'

Rill

t'

(If

RV

Rill

Rll

RIII

l

f

Id

$

G

r

!

.Chri toffer/kjc

anger

Mc an

10/jf/90

r v e n j g 4 f'r

t

SArtGUAi g,e)

'

V

in

/

<u

!

.

s