Text
. .
oa
.
'
SAEG1 ADS
FONATON
.
.
,,
.
OCT 2 21990
l
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Opus West III
1400 Opus Place
Downers Grove, IL 60515
Gentlemen:
This refers to the routine safeguards inspection conducted by
Ms. C. M. Christoffer and Mr. J. L. Belanger of this office on August 13 -
,
October 3,1990, of activities at Zion Nuclear Power Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48, and to the
discussion of our findings with Mr. T. Joyce at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
i
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel,
i
No violations of NRC requirements were identified during the course of this
inspection.
Areas examined during this inspe', tion concern a subject matter which is exempt
from disclosure according to Phet 73, Title 10 Code of Federal Regulations,
Section73.21(c)(2). This information must be handled and protected in
i
1
accordance with the provisions of 10 CFR 73.21.
Consequently, our report
of this inspection will not be placed in the NRC Public Document Room.
However, in accordance with 10 CFR 2.790 of the Commission's regulations,
a copy of the attachment to the inspection report will be placed in the
'
NRC Public Document Room.
!
!
SA?EGUAns WF05AW
i
.-
M%ssume
(
)
- -
.
SAEGUADS
FORY AT 0;N
.
-
-
,
Commonwealth Edison Company
2 OCT 2 21990
We will gladly discuss any questions you have concerning this inspection.
Sincerely.
.
L. Robert Greger, Chief
Reactor Programs Branch
Enclosure:
Inspection Report
No. 50-295/90019(DRSS\\
'
No.50-304/90021(DRSSj;
(SAFEGUARDS INFORMATION)
,
cc w/ enclosure:
M. Wallace, Vice President,
PWR Operations
T. Kovach, Nuclear
Licensing Manager
T. Joyce, Station Manager
NRR/DRIS/SGB
NRR/0RIS/SID
NRR/DLPQ/PEB
cc w/ enclosure, w/o
SAFEGUARDS INFORMATION:
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspectors, Byron,
Braidwood, Zion
Richard Hubbard
J. W. McCaffrey, Chief. Public
Utilities Division
Mayor, City of Zion
Chandu Patel, Project
Manager, NRR
Robert Newmann, Office of Public
Counsel, State of Illinois Center
bec:
D. Funk
Enclosure Contains
SAFEGUARDS IhTORMATION
Upon Separation Thia
,
Pace Is Decentrolled
'
Rill
t'
(If
RV
Rill
Rll
RIII
l
f
Id
$
G
r
!
.Chri toffer/kjc
anger
Mc an
10/jf/90
r v e n j g 4 f'r
t
SArtGUAi g,e)
'
V
in
/
<u
!
.
s