MONTHYEARIR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station IR 05000295/20220012023-01-27027 January 2023 NRC Inspection Report 05000295/2022001 (Drss); 05000304/2022001 (Drss) ML22068A0462022-03-14014 March 2022 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2022401 IR 05000295/20210012022-02-22022 February 2022 NRC Inspection Report No. 05000295/2021001(DNMS); 05000304/2021001(DNMS) IR 05000295/20200012021-01-21021 January 2021 NRC Inspection Report No. 05000295/2020001(DNMS); 05000304/2020001(DNMS); and 07201037/2020001(DNMS) - Zion Nuclear Power Station IR 05000295/20190012020-03-18018 March 2020 IR 05000295/2019001(DNMS); 05000304/2019001(DNMS) Zion Nuclear Power Station ML19323D0242019-11-19019 November 2019 (Decommissioning) - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07201037/2019401(DRS) (G.Bonano) IR 05000295/20180022019-02-27027 February 2019 NRC Inspection Report No. 05000295/2018002(DNMS); 05000304/2018002(DNMS) Zion Nuclear Power Station IR 05000295/20180012018-09-28028 September 2018 NRC Inspection Report No. 05000295/2018001(DNMS); 05000304/2018001(DNMS); and 07201037/2018001(DNMS) Zion Nuclear Power Station IR 05000259/20183012018-08-24024 August 2018 NRC Operator License Examination Report Nos. 05000259/2018301, 05000260/2018301,05000296/2018301 IR 05000295/20174012017-11-15015 November 2017 (Decommissioning) - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 05000295/2017401(DRS), 05000304/2017401(DRS), 07201037/2017401(DRS) - Cover Letter Only (DRS-E.Bonano) IR 05000295/20170012017-07-18018 July 2017 NRC Inspection Report No. 05000295/2017001(DNMS); 05000304/2017001(DNMS) IR 05000295/20160032017-02-16016 February 2017 NRC Inspection Report No. 05000295/2016003(DNMS); 05000304/2016003(DNMS) - Zion Nuclear Power Station IR 05000295/20160022016-08-15015 August 2016 Inspection Report 05000295/2016002 (Dnms); 05000304/2016002 (Dnms); 07201037/2016001 (Dnms), Zion Nuclear Power Station IR 05000295/20164012016-06-10010 June 2016 (Permanently Shut Down) NRC Security Inspection Report 05000295/2016401(DNMS)05000304/2016401(DNMS)Public ML16158A2882016-06-0101 June 2016 Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS) IR 05000295/20050002016-06-0101 June 2016 Zion Nuclear Power Station Power Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS) IR 05000295/20160012016-05-0606 May 2016 NRC Inspection Report No. 05000295/2016001 (Dnms); 05000304/2016001(DNMS), January 1, 2016, Through April 12, 2016 - Zion Nuclear Power Station IR 05000295/20150102016-02-16016 February 2016 IR 05000295/2015010 (Dnms); 05000304/2015010 (Dnms); and 07201037/2015002 (Dnms), Zion Nuclear Power Station, October 1, 2015, Through December 31, 2015 IR 05000295/20154012015-11-24024 November 2015 IR 05000295/2015401 (Dnms), 05000304/2015401 (Dnms), and 07201037/2015401 (Dnms), October 27, 2015, Zion Independent Spent Fuel Storage Installation - Security Inspection IR 05000295/20150092015-11-0404 November 2015 NRC Inspection Report No. 05000295/2015009(DNMS); 05000304/20150009(DNMS) Zion Nuclear Power Station IR 05000295/20150082015-08-0505 August 2015 IR 05000295/2015008(DNMS); 05000304/2015008(DNMS), 06/19/2015 - Zion Nuclear Power Station IR 05000295/20150072015-05-0808 May 2015 First Quarter 2015 Inspection Report 05000295/2015007(DNMS); 05000304/2015007(DNMS); 07201037/2015001(DNMS) IR 05000295/20140102015-02-0606 February 2015 Fourth Quarter 2014 Inspection Report 05000295/2014010(DNMS); 05000304/2014010(DNMS); 07201037/2014004(DNMS) IR 05000295/20140092014-11-10010 November 2014 IR 05000295/2014009(DNMS); 05000304/2014009(DNMS); 07201037/2014003(DNMS) on 09/18/14 with In-office Review Through 10/16/14, Zion Nuclear Power Station, NRC Inspection Report IR 05000295/20140082014-08-18018 August 2014 IR 05000295/2014-008 (Dnms), 05000304/2014-008(DNMS); 07201037/2014-002 (DNMS) - Zion Nuclear Power Station, Second Quarter 2014 Inspection Report IR 05000295/20134042014-05-28028 May 2014 EA-14-025, Notice of Violation and Proposed Imposition of Civil Penalty - $17,500; Zion Nuclear Power Station (Permanently Shut Down); NRC Security Inspection Report 05000295-13-404 (Dnms); 05000304-13-404 (DNMS) IR 05000295/20140072014-05-19019 May 2014 IR 05000295-14-007 (Dnms); 05000304-14-007 (Dnms); 07201037-14-001 (Dnms), 12/18-21 & 28-31/2013, 01/1-4, 7-9 & 21-24/2014, 02/10-14 & 24-28/2014 and 03/13-14/2014, Zion Nuclear Power Station First Quarter 2014 IR 05000454/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000456/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000254/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000373/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000272/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000289/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000352/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000237/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000219/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000277/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC ML14105A1632014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC ML14066A0872014-03-0606 March 2014 IR 05000295-13-404(DNMS); 05000304-13-404(DNMS); 06/2013 and 02/11/2014, Zion NRC Security Inspection - Cover Letter IR 05000295/20130142014-02-21021 February 2014 IR 05000295-13-014, 05000304-13-014; 12/23/2013; Zion Power Station Fourth Quarter, Inspection Report IR 05000295/20130132014-01-24024 January 2014 IR 05000295-13-013, 05000304-13-013 & 07201037-12-002, on 12/17/2013, Zion Nuclear Power Station, Units 1 & 2 IR 05000295/20134052013-12-26026 December 2013 IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI ML13360A2932013-12-26026 December 2013 IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI IR 05000295/20130122013-11-20020 November 2013 IR 05000295-13-012(DNMS); 05000304-13-012(DNMS); 07201037-12-001(DNMS), on 11/05/13, Zion Nuclear Power Station ML13325A8982013-11-20020 November 2013 IR 05000295-13-012(DNMS); 05000304-13-012(DNMS); 07201037-12-001(DNMS), on 11/05/13, Zion Nuclear Power Station IR 05000295/20130112013-11-14014 November 2013 Third Quarter Inspection Report 05000295-13-011(DNMS);05000304-13-011(DNMS) IR 05000295/20134032013-07-12012 July 2013 IR 05000295-13-403 and 05000304-13-403 for Zion Nuclear Power Station IR 05000295/20130092013-07-12012 July 2013 IR 05000295-13-009 and 05000304-13-009 for Zion Nuclear Power Station IR 05000295/20130082013-04-24024 April 2013 IR 05000295-13-008 (Dnms); 05000304-13-008 (Dnms), 03/13-15/2013 and 03/25-29/2013; in Office Review Through 04/15/2013, Zion Nuclear Power Station 2023-11-02
[Table view] Category:Letter
MONTHYEARML23356A0072023-12-22022 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-592023-11-29029 November 2023 Amendment No. 15 to Indemnity Agreement No. B-59 ML23291A0802023-11-16016 November 2023 Issuance of Conforming Amendments Regarding Direct Transfer of DPR-39 and DPR-48 Facility Operating Licenses from Zionsolutions, LLC to Constellation Energy Generation LLC ML23286A3132023-11-14014 November 2023 EPA Phase 2 Closure Letter 10-13-23 ML23286A3092023-11-0808 November 2023 Partial Site Release, Zion Nuclear Power Station, Units 1 and 2 ML23310A3132023-11-0808 November 2023 Cover Letter, S.Anderson, NRC to J.Sauger, Energysolutions, Remaining Final Status Surveys RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments2023-11-0808 November 2023 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments ML23310A1082023-11-0303 November 2023 Confirmatory Survey Report 2023 IR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station ML23251A0712023-09-0808 September 2023 Confirmatory Survey Extent of Condition Review ML23237B4132023-08-25025 August 2023 Response to Summary of May 4, 2023, Clarification Meeting Regarding the Partial Site Release Request ML23186A1902023-07-0606 July 2023 Review of Zion Solutions Responses to Requests for Additional Information Related to Zion Nuclear Power Station, Units 1 and 2 Decommissioning and Estimated Partial Site Release Review Schedule ZS-2023-0012, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report ML23117A3692023-04-26026 April 2023 Annual Radioactive Effluent Release Report ML23116A2012023-04-24024 April 2023 Occupational Radiation Exposure Annual Report for 2022 ML23094A1292023-03-30030 March 2023 Annual Property Insurance Status Report ML23094A1322023-03-29029 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23068A0122023-03-0303 March 2023 Withdrawal of Zion License Amendment Request for the License Termination Plan ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000295/20220012023-01-27027 January 2023 NRC Inspection Report 05000295/2022001 (Drss); 05000304/2022001 (Drss) ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring ML22308A1762022-11-17017 November 2022 J. Sauger Letter Regarding Zion License Transfer Order Fourth Extension ML22313A0562022-11-17017 November 2022 Audit Report - Letter to J Sauger ML22306A1342022-11-0909 November 2022 Receipt of Information and License Amendment Request for the Zion Nuclear Power Station, Units 1 and 2, Docket Nos. 50-295 and 50-304 RS-22-113, Updated ISFSI Decommissioning Funding Plan for Zion Nuclear Power Station2022-10-26026 October 2022 Updated ISFSI Decommissioning Funding Plan for Zion Nuclear Power Station ML22294A1622022-10-19019 October 2022 Request for Extension of Order Approving Transfer of the License for Zion Nuclear Power Station, Units 1 and 2, from Zionsolutions, LLC to Constellation Energy Company, LLC ML22293A4332022-10-17017 October 2022 Response to NRC Staff Questions Raised During the Regulatory Audit of RAI Responses Conducted July 19-20, 2022, and August 24-25, 2022 ML22273A1452022-10-0404 October 2022 U.S. NRC Analysis of Zion Solutions, LLC Decommissioning Funding Status Report for the Zion Nuclear Power Station Units 1 and 2 ML22279A9932022-09-30030 September 2022 Revised Final Status Survey Release Records, Final Reports, and Discrete Radioactive Particle Survey Report Technical Support Document ML22237A0952022-08-23023 August 2022 Revised Final Status Survey Release Records ML22200A0112022-07-19019 July 2022 Letter to J. Sauger, Zionsolutions, from K. Conway, NRC, - Regulatory Audit Plan Re Zionsolutions' Response to RAI Related to Partial Site Release and Recent Site Survey Activities ML22111A1872022-04-0606 April 2022 Technical Support Document 2022-001, Discrete Radioactive Particle Survey Report, Revision 1 NMP1L3458, Constellation Energy Generation, LLC, Annual Property Insurance Status Report2022-04-0101 April 2022 Constellation Energy Generation, LLC, Annual Property Insurance Status Report ML22089A0982022-03-28028 March 2022 Revised Response to Request for Additional Information Related to Partial Site Release and Recent Site Survey Activities ML22089A0262022-03-28028 March 2022 Technical Support Document 2022-001, Discrete Radioactive Particle Survey Report, Revision 0 ZS-2022-0008, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-28028 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors ML22087A0052022-03-24024 March 2022 Annual Property Insurance Status Report ZS-2022-0001, License Amendment Request for the License Termination Plan2022-03-23023 March 2022 License Amendment Request for the License Termination Plan ML22068A0462022-03-14014 March 2022 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2022401 ML22069A3292022-03-0808 March 2022 Response to Request for Additional Information Related to Partial Site Release and Recent Site Survey Activities, and Notification of Foundation Pad Discovery RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement IR 05000295/20210012022-02-22022 February 2022 NRC Inspection Report No. 05000295/2021001(DNMS); 05000304/2021001(DNMS) ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML22027A5752022-01-19019 January 2022 License Transfer to Constellation Energy Generation, LLC for Zion Nuclear Generating Station RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21302A0692021-11-0808 November 2021 Letter to T. Rielly, Vista 360, from K. Conway, NRC, Re Exelon Notice of Disbursement from Decommissioning Trusts for Zion Units 1 and 2 2023-09-08
[Table view] |
Inspection Report - Zion - 2008001 |
---|
|
|
Text
ril 2, 2008
SUBJECT:
NRC INSPECTION REPORT 050-00295/08-01(DNMS) -
ZION NUCLEAR STATION
Dear Mr. Pardee:
On March 19, 2008, the NRC completed an inspection at the Zion Nuclear Station. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, the inspector evaluated organization and management controls, safety reviews, maintenance and surveillance, and radiological waste. At the conclusion of the inspection on March 19, 2008, the NRC inspector discussed the findings with members of your staff.
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.
Based on the results of this inspection, the NRC did not identify any violations.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Patrick L. Louden, Chief Decommissioning Branch Docket No. 05000295 License No. DPR-39
Enclosure:
Inspection Report 050-00295/08-01(DNMS)
REGION III==
Docket No.: 050-00295 License No.: DPR-39 Report No.: 050-00295/08-01(DNMS)
Licensee: Exelon Generation Company, LLC Facility: Zion Nuclear Station Location: 101 Shiloh Boulevard Zion, IL 60099 Date: March17 through 19, 2008 NRC Inspector: Peter J. Lee, Ph.D., CHP Health Physicist Approved by: Patrick L. Louden, Chief Decommissioning Branch Division of Nuclear Materials Safety
EXECUTIVE SUMMARY Zion Nuclear Station NRC Inspection Report 050-00295/08-01(DNMS)
This routine decommissioning inspection focused on the evaluation of the licensees facility management and control, spent fuel safety, and radiological safety.
Facility Management and Control
! The inspector concluded that the licensee adequately implemented its audit and corrective action programs in accordance with the licensees Quality Assurance Program, and that the programs were consistent with NRC requirements. (Section 1.1)
! The inspector determined that the licensees process for evaluating the safety impacts of facility changes was in compliance with the requirements of 10 CFR Part 50.59.
(Section 1.2)
Spent Fuel Safety The inspector determined that the licensee properly maintained the spent fuel pool water level, temperature, chemistry, cleanliness control, and criticality control to ensure the safe wet storage of the spent fuel. The inspector also determined that the licensee had adequately performed the functional tests to ensure that abnormal spent fuel pool conditions would be made known to the operators in a timely fashion. (Section 2.1)
Radiological Safety The inspector determined that the licensee had complied with NRC and Department of Transportation regulations for shipments of radioactive materials. (Section 3.1)
The inspector concluded that the licensee effectively monitored and controlled personnel exposures to radiation, and adequately controlled contamination. (Section 3.2)
The inspector concluded that the licensee effectively implemented radiological effluent control programs and processes. (Section 3.3)
Report Details Summary of Plant Activities During the period covered by this inspection, the licensee maintained the spent fuel in storage within the spent fuel pool and transferred the spent resin to the shipping cast.
1.0 Facility Management and Control 1.1 Self-Assessment, Auditing, and Corrective Actions (IP 40801)
a. Inspection Scope The inspector reviewed the licensees annual audit (NOSA-ZIN-07-10), which was conducted from December 4 through December 14, 2007. The inspector reviewed selected corrective action work orders, which were associated with deficiencies identified during the annual audit.
b. Observations and Findings The licensees annual audit included the evaluation of activities affecting plant systems, structures, and components necessary for the safe storage of spent fuel. The annual audit was consistent with license requirements in both scope and level of detail, and the licensee initiated appropriate corrective actions to resolve audit findings.
c. Conclusions The inspector concluded that the licensee adequately implemented its audit and corrective action programs in accordance with the licensees Quality Assurance Program, and that the programs were consistent with NRC requirements.
1.2 Safety Reviews, Design Changes, and Modifications (IP 37801)
a. Inspection Scope The inspector reviewed the licensees safety screening reviews to verify that completed reviews were consistent with the requirements of 10 CFR Part 50.59. The review included selected screening reviews completed since October 2007.
b. Observations and Findings The licensees Administrative Procedure ZAP-100-06 was consistent with the NRCs guidance on 10 CFR 50.59 screening reviews. The licensee conducted several safety screening reviews of facility changes and none of the changes required a formal 10 CFR Part 50.59 safety evaluation.
3 Enclosure
c. Conclusions The inspectors determined that the licensees process for evaluating the safety impacts of facility changes was in compliance with the requirements of 10 CFR 50.59.
2.0 Spent Fuel Safety 2.1 Spent Fuel Pool Safety (IP 60801)
a. Inspection Scope The inspector verified the safe wet storage of spent fuel in the fuel building. The review included spent fuel pool (SFP) instrumentation, alarms, cleanliness control, chemistry, criticality controls, and the results of the January 2008 through March 2008 spent fuel pool water temperatures, levels, and chemistry and gamma spectrum analyses. The inspector reviewed the records of functional tests of alarms to alert operating personnel by pager for: spent fuel pool high and low water level, high water temperature, fuel building high radiation, cooling tower pump trip, and abnormal fuel building ventilation system operation.
b. Observations and Findings The results of the analyses reviewed indicated that all parameters were within procedural limits. The licensee maintained the boron concentration in the spent fuel pool at approximately 2000 parts per million (ppm) versus the Technical Specifications limit of greater than 500 ppm. The licensees personnel were knowledgeable of spent fuel pool water analyses, and all analyses were performed in accordance with the required procedures.
The licensee had performed the monthly test of high radiation in the spent fuel pool area, and other annual functional tests to verify proper pager function in response to anticipated control room alarms affecting spent fuel pool safety. The licensees personnel were knowledgeable of all functional tests; and all tests were performed in accordance with the required procedures.
c. Conclusions The inspector determined that the licensee properly maintained the spent fuel pool water level, temperature, chemistry, cleanliness control, and criticality control to ensure the safe wet storage of the spent fuel. The inspector also determined that the licensee had adequately performed the functional tests to ensure that abnormal spent fuel pool conditions would be made known to the operators in a timely fashion.
3.0 Radiological Safety 3.1 Solid Radioactive Waste Management and Transportation of Radioactive Materials (86750)
a. Inspection Scope The inspector reviewed radioactive material shipping documents and conducted interviews of the responsible individual to ensure compliance with NRC and U.S.
Department of Transportation (DOT) regulations.
b. Observations and Findings On February 18, 2008, the licensee made one excepted quantity radioactive material shipment of safety injection pump. The licensees shipping manifest showed that personnel packaged, labeled, and marked the shipping container according to the DOT and 10 CFR Part 71 transportation requirements. The licensee verified that the results of radiation and removable contamination levels were within applicable limits.
c. Conclusions The inspector determined that the licensee had complied with NRC and Department of Transportation regulations for shipments of radioactive materials.
3.2 Occupational Radiation Exposure (83750)
a. Inspection Scope The inspector reviewed the external dosimetry records for the second half of 2007. The inspector reviewed the general air sampling, direct radiation survey, and smear sample results from the Fuel Building and the Auxiliary Building from January 2008 to March 2008.
The inspector reviewed the radiation work permit and exposure records during the transfer of spent resin from spent fuel pool demineralizer to shipping cast.
b. Observations and Findings The highest dose received by the individuals was 77 mrem during the second half of 2007. The results of general area air sampling in the fuel and auxiliary buildings did not positively identify the presence of any licensed materials. The results of the routine quarterly surveys in the Fuel Building and the Auxiliary Building had not identified any significant removal contamination. Workers received doses less than the dose limits specified in radiation work permit.
c. Conclusions The inspector concluded that the licensee effectively monitored and controlled personnel exposures to radiation, and adequately controlled contamination.
5 Enclosure
3.3 Radioactive Waste Treatment, Effluent, and Environmental Monitoring a. Inspection Scope (IP 84750)
The inspector reviewed the records and selected analytical results of effluent releases from Fuel Building and Unit 2 vents, and Turbine Building fire sump during the first quarter of 2008.
b. Observations and Findings The licensees gaseous effluent release data didnt indicate any positive results from the licensed materials. The liquid effluent release data demonstrated that the concentrations of released effluent conformed to limits in 10 CFR Part 20, Appendix B, Table 3.
c. Conclusions The inspector concluded that the licensee effectively implemented radiological effluent control programs and processes.
4.0 Exit Meeting The inspectors presented the inspection results to licensee management at the conclusion of the inspection on March 19, 2008. The licensee acknowledged the findings presented did not identify any of the documents or processes reviewed by the inspectors as proprietary.
Attachment: Supplemental Information
SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED
- R. Schuster, Plant Manager
- J. Ashley, Design Engineering
- R Adams, Operations and Engineering Manager
- L. Cunningham, Security Project Manager
- M. Petersen, Administration/Training Supervisor
- Present at the March 19, 2008, exit meeting.
INSPECTION PROCEDURES (IP) USED IP 60801 Spent Fuel Safety IP 37801 Safety Reviews, Design Changes, and Modifications IP 83750 Occupational Radiation Exposure IP 40801 Self-Assessment, Auditing, and Corrective Actions IP 86750 Transportation of Radioactive Materials IP 84750 Radioactive Waste Treatment, Effluent, and Environmental Monitoring ITEMS OPENED, CLOSED, AND DISCUSSED Opened None Closed None Discussed None LIST OF ACRONYMS USED CFR Code of Federal Regulations DNMS Division of Nuclear Materials Safety NRC Nuclear Regulatory Commission Attachment